196 Trains from (CLA)Kurla Junction to (TMBY)Trombay
Address: Station Rd, Kurla West, Kurla, Mumbai Maharashtra
Station Code: CLA
Station Name: Kurla Junction
Zone: CR/Central
Train Frequency Weekly: 1
Station Traffic: Low
Address: Railway Zone:
Station Code: TMBY
Station Name: Trombay
Zone: CR/Central
Train Frequency Weekly: 1
Station Traffic: Low
RECENT NEWS
1
www.cr.indianrailways.gov.in- 2023-05-23
General Manager reviews monsoon preparations Central Railway gears up with monsoon preparations Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling were also present. The details of measures taken for ensuring uninterrupted services are as under- 1)More Water Pumps- 24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP. The locations identified on main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and on Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc. 2)Micro tunnelling- Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section. 3)Desilting of drains- Central Railway has targeted de-silting and cleaning of 118.48 kms of drains on its suburban section of which, work has been completed for 102.39 kms and work is presently in progress on cleaning of another 16 kms of drains. 4)Cleaning of culverts- CR has cleaned 88 culverts on its suburban sections, and work is presently in progress on cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar. 5)Trimming of Trees- Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees. 6)Muck removal- Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck on Main lines. 7)Lifting of tracks- 47.8 km track lifting planned, it will be completed till next month. 8) Works done in Ghat Section- -45 meters of Tunnel Portal -300 mts of Rockfall Barrier -500 sq mts of Boulder Netting -40 mts of Canadian Fencing -160 mts of Stabilization of banks -tunnel sounding- 18 locations 9)Separate pumps will be provided for RUBs- at 14 locations. 10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve. 11)Other Important works in progress- ·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week. ·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections. ·Waterproof point motor machines provided at- 277 locations. ·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month. ·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas. ·Bunter Bhavan nallah at LTT to be connected by removing encroachments. ·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders. ·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti. 12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed. 13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates. 14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period. 15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC. --- --- --- Date: May 23, 2023 PR No. 2023/05/23 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivraj Manaspure) Chief Public Relations Officer 2
www.cr.indianrailways.gov.in- 2023-05-04
Integrated Traffic and Power Block on CSMT – Kalyan / Kasara section for launching of girders and Commissioning of EI on 06/07.05.2023 (Sat/Sun midnight) Central Railway will operate integrated traffic and power block on the CSMT-Kalyan / Kasara sections for the following works : • Launching of 2nd open web girders for Dedicated Freight Corridor Corporation India Ltd between Kopar and Thakurli stations from 01.05 hrs to 05.05 hrs on 07.05.2023 (Sat/Sun midnight) involving Up and Down Slow and Fast lines and 5th & 6th lines. • Launching of 10 Girders of 36 m span for Diva Road Over Bridge on the Diva-Thane section from 01.30 hrs to 04.30 hrs on 07.05.2023 (Sat/Sun midnight) involving Up and Down Slow and Fast lines. • Launching of Girders for Road Over Bridge at Titwala on the Ambivali- Khadavli section from 01.00 hrs to 04.45 hrs on 07.05.2023 (Sat/Sun midnight) involving Up and Down lines and EMU sidings and • Commissioning of Electronic Interlocking at Vasind on the Khadavli-Asangaon section between 02.00 hrs to 05.00 hrs on 07.05.2023 (Sat/Sun midnight) involving Up and Down lines. Due to this the train running pattern will be as under:- Suburban Trains • Last Local towards Karjat before the block: A 67 Ambarnath local leaving CSMT at 23.51 hrs. • Last Local towards Kasara before the block: TL 63 Titwala local leaving CSMT at 22.50 hrs. • First Local towards CSMT after the block will be Karjat-CSMT special local leaving Karjat at 04.10 hrs. • First Local towards CSMT after the block: TL 6 CSMT local leaving Titwala at 05.11 hrs. Short Termination / Origin of Suburban Trains • Trains for Titwala TL-65 & 67 leaving CSMT on 06.5.2023 at 23.16 hrs and 23.43 hrs will be short terminated at Thane. • Titwala local TL-2 & 4 for CSMT will run Ex-Thane on 07.5.2023 at 03.56 hrs and 04.32 hrs respectively. Cancellation of Suburban Trains Following suburban trains will be cancelled : • Trains for CSMT leaving Ambarnath on 06.5.2023 at 21.35 hrs • Trains for Ambarnath leaving CSMT on 07.5.2023 at 00.04 hrs, 05.16 hrs and 06.19 hrs • Train for Karjat leaving CSMT on 07.5.2023 at 00.24 hrs • Trains for CSMT on 07.5.2023 leaving Ambarnath at 03.44 hrs, 04.08 hrs, leaving Karjat at 02.33 hrs, 03.40 hrs, leaving Kasara at 03.51 hrs and leaving Kalyan at 04.39 hrs Suburban services between Thane and Karjat/ Kasara will remain suspended from 00.40 hrs to 05.00 hrs on 06/07.05.2023 (Sat/Sun midnight). Mail / Express Trains Regulation of Up trains • 18030 Shalimar-LTT express will be regulated at Asangaon station from 02.37 hrs to 05.00 hrs and will arrive destination 2 hours, 20 minutes later than its scheduled time. • 12810 Howrah-CSMT express will be regulated at Atgaon station from 02.38 hrs to 04.55 hrs and will arrive destination 2 hours, 10 minutes later than its scheduled time. • 20104 Gorakhpur-LTT express will be regulated at Khardi station from 02.55 hrs to 04.55 hrs and will arrive destination 2 hours later than its scheduled time. • 11402 Adilabad-CSMT express and 12152 Shalimar-LTT express will be regulated at Kasara from 03.23 hrs to 05.10 hrs and arrive destination 1 hour and 40 minutes later than its scheduled time. • 12112 Amravati-CSMT express and 12106 Gondia-CSMT express will be regulated at Igatpuri from 03.35 hrs to 04.45 hrs and arrive destination 1 hour and 10 minutes later than its scheduled time. • 17058 Secundreabad-CSMT Devgiri express, 12618 Mangala-Lashwadeep express, and 12138 Punjab Mail will be regulated at Bhusaval and will arrive destination 30 to 40 minutes late. • 12290 Duranto Express will arrive late by 15 to 20 minutes Regulation of Dn trains • 11087 Veraval-Pune Express arriving Vasai Road on 07.05.2023 will be regulated at Bhiwandi Road station from 04.06 hrs to 05.00 hrs and will be brought following 12940 Jaipur-Pune Express. Following Up trains will be diverted via Karjat-Panvel-Diva route • 11020 Bhubhaneshwar-CSMT express • 18519 Vishakapatnam-LTT express • 12702 Hyderabad-CSMT express • 11140 Gadag-CSMT express • 22158 Chennai-CSMT express • 11022 Tirunelveli-Dadar express Following Dn trains will be diverted on slow line between Thane and Kalyan stations • 22177 CSMT-Varanasi Mahanagri express • 22538 LTT-Gorakhpur express NOTE : THERE WILL BE NO MEGA BLOCK on MAIN LINE on 07.5.2023 DURING DAY HOURS All Mail / express trains / Holiday specials will be regulated / re-scheduled as per operational requirement. Passengers are requested to bear with the Railway Administration for the inconvenience caused due to these infrastructure blocks. --- ---- Date: May 4, 2023 PR No.2023/05/06 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivaji Sutar) Chief Public Relations Officer
COMMENTS
NO Comments. Be the first to Comment...
|