For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








103 Trains from (TNR)TANGUTURU to (PVD)PEDDAVADIAPUDI


Address: National Highway 5, Tanguturu, Andhra Pradesh 523274, India

Station Code: TNR

Station Name: TANGUTURU

Zone: SCR/South Central

Train Frequency Weekly: 95

Station Traffic: Medium

Address: Peddavadiapudi Station, Pedavadlapudi, Andhra Pradesh 522302, India

Station Code: PVD

Station Name: PEDDAVADIAPUDI

Zone: SCR/South Central

Train Frequency Weekly: 100

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
16864MQ BGKT EXPOGL00:20TEL01:581:38M2A,3A,SL,GN,16864 Status
17487TIRUMALA EXPOGL00:53TEL02:161:23M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17487 Status
12852BILASPUR EXPRESSOGL01:15BZA03:502:35M2A,3A,SL,GN,12852 Status
12829BHUBANESWAR EXPOGL01:15TEL02:331:18F2A,3A,SL,GN,12829 Status
22631ANUVRAT EXPRESSOGL01:15BZA03:502:35TH1A,2A,3A,22631 Status
22870VISAKAPATNAM EXPOGL01:15BZA03:452:30TU2A,3A,SL,GN,22870 Status
22802MAS VSKP EXPOGL01:18TEL02:341:16SA2A,3A,SL,GN,22802 Status
22708VSKP DOUBLE DECKOGL01:25TEL02:531:28W,F,SUCC22708 Status
22834BBS HUMSAFAROGL02:15BZA04:402:25TU3A22834 Status
12664HOWRAH EXPRESSOGL02:55BZA05:202:25TU,F1A,2A,3A,SL,GN,12664 Status
12666CAPE HOWRAH EXPOGL02:55BZA05:202:25SA2A,3A,SL,GN,12666 Status
12897PDY BBS EXPRESSOGL02:55BZA05:202:25W2A,3A,SL,GN,12897 Status
15629NAGAON EXPRESSOGL02:55BZA05:202:25M1A,2A,3A,SL,GN,15629 Status
15929DIBRUGARH EXPOGL02:55BZA05:202:25TH2A,3A,SL,GN,15929 Status
12522RAPTISAGAR EXPOGL03:20BZA06:002:40F2A,3A,SL,GN,12522 Status
12512RAPTISAGAR EXPOGL03:25BZA06:002:35TU,W,SU2A,3A,SL,GN,12512 Status
22646AHILYANAGARI EXOGL03:25TEL04:591:34SA2A,3A,SL,GN,22646 Status
22648KORBA EXPRESSOGL03:25TEL04:591:34M,TH2A,3A,SL,GN,22648 Status
12840HOWRAH MAILOGL03:45TEL05:241:39M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12840 Status
13352DHANBAD EXPRESSOGL04:00TEL05:391:39M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13352 Status
17229SABARI EXPRESSOGL04:20TEL06:191:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17229 Status
06010PDY SRC EXPRESSOGL04:40TEL06:101:30SA2A,3A,SL,GN,06010 Status
67233BTTR BZA PASSOGL05:26PVD08:283:02M,TU,W,TH,F,SA,SUUNRESERVED67233 Status
07116HYDERABAD EXPOGL05:32TEL07:001:28M2A,3A,SL,GN,07116 Status
12864YPR HOWRAH EXPOGL06:25TEL08:041:39M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12864 Status
57257KAKINADA PSGROGL07:15PVD10:443:29M,TU,W,TH,F,SA,SUSL,GN,57257 Status
57277GDR BZA PASSOGL08:30PVD11:333:03M,TU,W,TH,F,SA,SUUNRESERVED57277 Status
17405KRISHNA EXPRESSOGL09:35PVD12:072:32M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN,17405 Status
16031ANDAMAN EXPRESSOGL09:40TEL11:592:19W,TH,SU3A,SL,GN,16031 Status
16093LUCKNOW EXPOGL09:40TEL11:592:19TU,SA3A,SL,GN,16093 Status
12611NZM GARIB RATHOGL09:40BZA11:502:10SA3A12611 Status
12509GUWAHATI EXPOGL10:25BZA13:052:40W,TH,F1A,2A,3A,SL,GN,12509 Status
12515GUWAHATI EXPOGL10:25BZA13:052:40SU2A,3A,SL,GN,12515 Status
22643PATNA EXPRESSOGL10:25BZA13:052:40M,TU2A,3A,SL,GN,22643 Status
12643NIZAMUDDIN EXPOGL11:20BZA14:152:55TU2A,3A,SL,GN,12643 Status
12645NIZAMUDDIN EXPOGL11:20BZA14:152:55SA2A,3A,SL,GN,12645 Status
07417TPTY NSL SPLOGL11:20TEL12:411:21F2A,3A,SL,GN,07417 Status
06336GUWAHATI EXPOGL11:24TEL13:001:36SU3A,SL,GN,06336 Status
82636KCVLGHY SUVIDHAOGL11:24TEL13:001:36SU3A,SL,GN,82636 Status
12390MS GAYA EXPRESSOGL11:35BZA14:152:40TU2A,3A,SL,GN,12390 Status
12077JAN SHATABDIOGL11:35TEL13:091:34M,W,TH,F,SA,SUCC,2S,GN,12077 Status
08302BAND SBP EXPOGL11:40BZA14:052:25SA2A,3A,SL,GN,08302 Status
22808MAS SRC AC EXPOGL12:01BZA14:102:09TH,SU1A,2A,3A,22808 Status
22842MAS SRC ANTYODAYAOGL12:01BZA14:102:09WUNRESERVED22842 Status
67257OGL TEL MEMUOGL12:35TEL15:553:20M,TU,W,TH,F,SA,SUUNRESERVED67257 Status
12842COROMANDEL EXPOGL12:40BZA15:002:20M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12842 Status
67256OGL GNT MEMUOGL13:15TEL16:503:35M,TU,W,TH,F,SA,SUUNRESERVED67256 Status
12659GURUDEV EXPRESSOGL13:30TEL14:481:18SU2A,3A,SL,GN,12659 Status
16317HIMSAGAR EXPOGL13:30TEL14:491:19F3A,SL,GN,16317 Status
16787TEN JAMMU EXPOGL13:30TEL14:491:19M,F2A,SL,GN,16787 Status
16687NAVYUG EXPOGL13:30TEL14:491:19M2A,3A,SL,GN,16687 Status
02193TEN JBP EXPRESSOGL13:45BZA16:102:25SA2A,3A,SL,GN,02193 Status
07118ERS HYB EXPRESSOGL13:45TEL15:051:20TH2A,3A,SL,GN,07118 Status
12656NAVAJIVAN EXPOGL13:50TEL15:231:33M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12656 Status
12507ARONAI EXPRESSOGL14:10BZA16:352:25TU2A,3A,SL,2S,GN,12507 Status
22501NEW TINSUKIA EXPOGL14:10BZA16:302:20TU2A,3A,SL,GN,22501 Status
22641SHALIMAR EXPOGL14:31BZA16:452:14TH,SA2A,3A,SL,GN,22641 Status
67260OGL BZA MEMUOGL14:35PVD17:182:43M,TU,W,TH,F,SA,SUUNRESERVED67260 Status
22611MAS NJP EXPRESSOGL14:55BZA17:402:45W2A,3A,SL,GN,22611 Status
17480TPTY PURI EXPOGL15:05TEL16:591:54M,TU,W,F,SA2A,3A,SL,GN,17480 Status
17482TPTY BSP EXPOGL15:05TEL16:591:54TH,SU2A,3A,SL,GN,17482 Status
16359ERS PATNA EXPOGL15:45TEL17:391:54SA2A,3A,SL,GN,16359 Status
22838DHARTI AABA EXPOGL15:50BZA18:152:25TH2A,3A,22838 Status
22872TPTY BBS EXPOGL15:50BZA18:282:38M2A,3A,SL,GN,22872 Status
22880TPTY BBS SF EXPOGL15:50BZA18:282:38SU2A,3A,SL,GN,22880 Status
22878ERS HWH ANTYODAYA EXPOGL15:50BZA18:152:25TUUNRESERVED22878 Status
18568QLN VSKP EXPOGL16:45TEL18:031:18F2A,3A,SL,GN,18568 Status
15119RMM MUV EXPRESSOGL17:30TEL18:290:59W2A,3A,SL,GN,15119 Status
12712PINAKINI EXPOGL18:20TEL19:511:31M,TU,W,TH,F,SA,SUCC,2S,GN,12712 Status
67297GDR BZA MEMUOGL18:22PVD22:103:48M,TU,W,TH,F,SA,SUUNRESERVED67297 Status
12890YPR TATA EXPOGL18:40BZA21:052:25M2A,3A,SL,GN,12890 Status
22613HALDIA EXPRESSOGL18:40BZA21:052:25TH3A,SL,GN,22613 Status
22852SRC VIVEK EXPOGL18:40BZA21:052:25SA2A,3A,SL,GN,22852 Status
12375MAS ASN EXPRESSOGL19:00TEL20:121:12SA2A,3A,SL,GN,12375 Status
13575TBM JSME EXPOGL19:00TEL20:121:12SA2A,3A,SL,GN,13575 Status
22663MS JODHPUR EXPOGL19:20BZA21:552:35SA2A,3A,SL,GN,22663 Status
12295SANGHAMITRA EXPOGL19:34BZA22:102:36M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12295 Status
06058MAS SRC EXPRESSOGL19:38BZA22:002:22W2A,3A,SL,GN,06058 Status
07608TPTY NED EXPOGL19:43TEL20:551:12W2A,3A,SL,GN,07608 Status
22888HUMSAFAR EXPOGL19:55BZA22:452:50TH3A22888 Status
67231TPTY GNT PASSOGL20:22TEL01:505:28M,TU,W,TH,F,SA,SUUNRESERVED67231 Status
12578BAGMATI EXPRESSOGL20:25BZA22:502:25SA2A,3A,SL,GN,12578 Status
22352PATLIPUTRAEXPOGL20:25BZA22:502:25M2A,3A,SL,GN,22352 Status
20890HWH HUMSAFAR SFOGL20:25BZA22:452:20SU3A20890 Status
12709SIMHAPURI EXPOGL20:40TEL22:031:23M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12709 Status
12763PADMAVATHI EXPOGL20:50TEL22:061:16M,TU,W,F,SA2A,3A,SL,GN,12763 Status
22606PURULIA EXPRESSOGL20:50BZA23:302:40W,SA2A,3A,SL,GN,22606 Status
22826MAS SHM EXPOGL20:50BZA23:302:40TH2A,3A,SL,GN,22826 Status
22860MAS PURI EXPRESSOGL20:50TEL22:141:24M2A,3A,SL,GN,22860 Status
07146TPTY KCG SPLOGL20:50TEL22:061:16TH2A,3A,SL,2S,GN,07146 Status
15905DBRG VIVEK EXPOGL20:50BZA23:302:40TH2A,3A,SL,GN,15905 Status
12603HYDERABAD EXPOGL21:20TEL23:141:54M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12603 Status
12669GANGAKAVERI EXPOGL21:30BZA00:052:35M,SA2A,3A,SL,GN,12669 Status
17209SESHADRI EXPRESOGL21:55TEL23:281:33M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17209 Status
12733NARAYANADRI EXPOGL22:00TEL00:082:08M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12733 Status
17643CIRCAR EXPOGL22:25TEL00:342:09M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17643 Status
12759CHARMINAR EXPOGL22:30TEL00:041:34M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12759 Status
07942TPTY CCT SPLOGL23:05TEL00:381:33SUUNRESERVED07942 Status
12615GRAND TRUNK EXPOGL23:10TEL00:441:34M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12615 Status
17246DMM MTM NS EXPOGL23:18TEL01:011:43M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17246 Status
12253ANGA EXPRESSOGL23:30BZA02:303:00SA2A,3A,SL,GN,12253 Status
17401TPTY MTM NS EXPOGL23:37TEL01:001:23M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17401 Status
17403GDV NS LINK EXPOGL23:37TEL01:001:23M,TU,W,TH,F,SA,SUUNRESERVED17403 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.607/2020-2118-02-2021
Secunderabad
Shri Gajanan Mallya, General Manager, SCR conducts Annual Inspection of Vijayawada Division




-Annual Inspection conducted between Gudur – o­ngole – Tenali section

Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Gudur – o­ngole – Tenali section of Vijayawada Division today i.e., 16th February, 2021. He was accompanied by Shri P. Srinivas, Divisional Railway Manager, Vijayawada Division, Principal Head of the Departments and other senior officials throughout the inspection.

The General Manager commenced the inspection at Gudur Railway station and proceeded further to Manubolu – Kommarapudi section where he inspected the Road Under Bridge (RUB), Level Crossing Gate and Relay Room. He inspected Level crossing gate between Kommarapudi – Venkatachalam section, where he reviewed the safety aspects and also interacted with the Gateman. The General Manager inspected Venkatachalam Railway station and discussed o­n various station developmental plans with the officials, He carried out a speed test of 120 Kmph between Venkatachalam – Nellore section. The General Manager inspected minor bridges between Kommarapudi – Venkatachalam and Alluru – Bitragunta sections.

Shri Gajanan Mallya, General Manager, SCR inspected Bitragunta Railway station and discussed o­n station developmental plans with the officials. He inaugurated a Crew Booking Lobby, New Freight Examination facility and flagged off a goods train. He inspected the new Carriage & Workshop office at Bitragunta station. He inspected the facilities available at Bitragunta running room and discussed o­n further improvements with the officials. The General Manager also planted saplings towards green environment at Bitragunta. He conducted a speed test between Kavali – Singarayakonda section.

The General Manager inspected the Road Under Bridge (RUB) and a major bridge between Ulavapadu – Singarayakonda – Tanguturu section. The General Manager inspected a bridge over the Romperu river between Uppugunduru – Chinnaganjam section and interacted with the track maintainers. He inspected the level crossing gate between Tsunduru – Tenali section. The General Manager inspected Tenali Railway station, the Health Unit and reviewed the facilities available. The General Manager also visited the staff quarters and Railway colony at Tenali where he interacted with the residents o­n the facilities provided. During the inspection, the General Manager inspected and reviewed overall track maintenance o­n the entire stretch of Gudur – Tenali section and also conducted speed tests o­n the section.





2
No.76/2020–2102-05-2020
Chennai
To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown

https://sr.indianrailways.gov.in/cris//webadmin/cms/upload.jsp


PRESS INFORMATION BUREAU

GOVERNMENT OF INDIA

*****

To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown.


Pending for several years, they confronted Indian Railways as bottlenecks in different zones across the country.


Around 500 modern heavy duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track & 5263 nos. of Turn outs


Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine.


Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service

New Delhi, 02nd May, 2020


Backend warriors of Indian Railways have successfully executed long pending Maintenance works like Yard remodelling, Renewal of Scissors Crossover, Repairs of Bridges during this lockdown. Pending for several years, they often confronted Indian Railways as bottlenecks.


Apart from ensuring supply chains all essential commodities running through parcel trains and freight trains, Indian Railways executed these long pending maintenance works during this lockdown period when passenger services were suspended due to COVID -19.


Indian Railways focused o­n several long pending overdue maintenance works requiring Traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service.

The maintenance of assets was taken up regularly to continue the supply chain of essential goods to public.

Around 500 modern heavy duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track & 5263 nos. of Turn outs.


Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 kms. of track at 5362 peak locations indicated by OMS test has been attended to ensure proper quality. Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine. Critical summer precaution activities like de-stressing of long welded rail (LWR)which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social distancing norms. 2,246 kms of de-stressing of LWR has been done.


SOME OF THE IMPORTANT TRACK WORKS:


  1. Renewal of wooden layout Scissors crossover with standard Pre-stress Concrete (PSC) layout in KAZIPET yard (South Central Railway).

A major block of 72 hrs was taken in Kazipet yard for pending yard remodelling to replace old wooden scissors crossover laid in1970 with standard PSC layout. It will improve the safety and speed of train movement through the yard.




  1. Renewal of Scissors Crossover at Vijayawada Yard with PSC Layout (South Central Railway).


Two blocks of 24 hours were taken o­n 09.04.20 and 10.04.20 during the lockdown period for renewal of old wooden layout Scissors crossover with standard PSC layout crossover providing a vital link and flexibility in the operations of the yard. This will improve movement of train service towards Secundrabad and Vishakhapatnam.










  1. Repair of Cement Concrete (CC) apron o­n Line no 1 and 2 at Baroda station (Western Railway).


The repair of CC aprons of Line no. 1 was undertaken in a traffic block of 4 days (8/4/2020- 11/4/2020) and of Line no 2 in a traffic block of 12 days (13/4/2020- 24/4/2020) using Ultra high strength, free flowing non shrink cement grout. The grout has arrested the pumping action of track o­n line no. 1 & 2 at the affected locations.


  1. Remodeling work in Bangalore City yard (South Western Railway):


Work of Bangalore City Yard remodeling for simultaneous receipt and dispatch of trains at Mysore end was completed successfully. This work was pending for more than last 10 years and would have involved cancellation/short termination of 60 Mail/Express Trains under normal circumstances.


IMPORTANT BRIDGE WORKS:-


  1. Re-girdering of Bridge No. 86 o­n Tunga River near Shivamogga Town (South Western Railway).


This is an important bridge having15 spans of 18.30m steel plate girders at Km. 61/100-500 o­n Birur Jn - Telguppa section of Mysore division. This work in normal times would have required traffic block of about 45 hours at 3:00 hours each day.


The existing steel girders are non-standard and being replaced with 25T loading standard steel girders. The height of the bridge is about 20m from river bed. The launching of all girders will be completed by 02.05.2020.







  1. Dismantling of Road Over Bridge (ROB) near Chennai Station (Southern Railway) :


Dismantling of unsafe ROB crossing 8 tracks o­n the approach of Chennai Central Station has been started o­n 26.03.20 and will be completed by 03.05.20. If done in normal time, it would have required 48 hours traffic blockon line 1 to 6 and72 hours traffic block o­n line 7 & 8 (suburban lines)with at least double the resources and cost apart from massive cancellation/rescheduling of trains with resultant loss of passenger revenue.


  1. Insertion of twin box segments of size 4.65x5.15m for subway in lieu of manned level crossing no. 493 (East Coast Railway):


A subway work was done between Visakhapatnam-Gopalapatnam section o­n 21.04.2020 in a traffic block of 9 hrs.This will facilitate closure of level crossing thereby improving safety of public. This work was pending from long time for want of traffic block.


  1. Construction of bridge in Rajahmundry-Vishakhapatnam section to cater opening of 4 x 5.5 m (South Central Railway).



The work involves provision of new bridge in HUDUD affected area where the track was washed out 2 times in 2013 & 2014. Total 21 hours traffic block was availed at 7:00 hrs each o­n 25.04.2020, 27.04.2020 and 28.04.2020. This bridge was required for passage of flood water to avoid breaches.

v. Insertion of Box at Bridge No. 525 (South Central Railway):


16 Boxes of size (4.6x4 m) were inserted at Bridge no. 525 o­n UP line at km 266/7-5 between Tanguturu–Singarayakonda o­n 29.04.2020 in critical situation successfully within traffic block of 8 hrs.



  1. Launching of 6 Foot Over Bridges (FOBs) under Bhusawal division (Central Railway)


Work of launching of 5 FOBs during the lockdown has been completed o­ne each at Bhusawal, Bodwad, Akola, New Amravati and Chandur Bazar Railway stations. 6th and the last o­ne at Nandurastation has also been targeted o­n 2.5.2020.


  1. Dismantling of old abandoned twin FOBs at Ludhiana railway station (Northern Railway).


100-year-old twin FOBs were closed to passenger use since 2014. However, dismantling of old FOB in OHE territory blocking all lines for more than 10-12 hours for several days was not feasible o­n New Delhi- Amritsar route. During lockdown, dismantling of these FOBs has been planned to complete in traffic blocks of 8-10 hrs. for 8 days. 2 traffic blocks have already been availed for successful dismantling of FOBs.




  1. Launching of Service girder for Canal work (East Central Railway):


Long pending work of launching of service girder in connection with Canal work of State Govt., requiring 10+ hours block was completed in Kakarghatti-Tarsarai busy single line section of Samastipur division.



  1. Dismantling of Talla ROB (Eastern Railway):


The ROB was unsafe for passenger, therefore, same was closed for re-construction. 8 spans of the ROB over Kolkata terminal station crossing 11 tracks and stabling lines were dismantled. In normal situation it would have a huge impact o­n passenger (especially suburban services) and freight services due to traffic blocks.







(B.Guganesan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit