For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








93 Trains from (PVD)PEDDAVADLAPUDI to (TNR)TANGUTURU


Address: Peddavadiapudi Station, Pedavadlapudi, Andhra Pradesh 522302, India

Station Code: PVD

Station Name: PEDDAVADIAPUDI

Zone: SCR/South Central

Train Frequency Weekly: 100

Station Traffic: Medium

Address: National Highway 5, Tanguturu, Andhra Pradesh 523274, India

Station Code: TNR

Station Name: TANGUTURU

Zone: SCR/South Central

Train Frequency Weekly: 95

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12764PADMAVATI EXPBZA00:30OGL02:352:05M,TU,TH,F,SU2A,3A,SL,GN,12764 Status
22801VSKP MAS SF EXPBZA00:45OGL03:583:13F2A,3A,SL,GN,22801 Status
08301SBP BAND SPLBZA00:45OGL02:431:58W2A,3A,SL,GN,08301 Status
22833HUMSAFAR EXPRESSBZA01:00OGL02:441:44M3A22833 Status
16032ANDAMAN EXPRESSBZA01:00SKM05:054:05TU,F,SA3A,SL,GN,16032 Status
16094LJN MAS EXPBZA01:00SKM05:054:05M,TH2A,3A,SL,GN,16094 Status
12760CHARMINAR EXPBZA01:05OGL03:041:59M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12760 Status
12898BBS PDY EXPRESSBZA01:15OGL03:091:54TU2A,3A,SL,GN,12898 Status
12851BSP MAS EXPBZA01:15OGL03:091:54SU2A,3A,SL,GN,12851 Status
12830BBS CHENNAI EXPBZA01:15OGL03:091:54TH2A,3A,SL,GN,12830 Status
22869VSKP MAS SF EXPBZA01:15OGL03:091:54M2A,3A,SL,GN,22869 Status
67232GNT TPTY PASSSJL01:18UPD06:275:09M,TU,W,TH,F,SA,SUUNRESERVED67232 Status
22871BBS TPTY EXPRESSBZA01:45OGL03:512:06SU2A,3A,SL,GN,22871 Status
07479VSKP TPTY SPLBZA01:55OGL03:521:57W2A,3A,SL,2S,GN,07479 Status
22879BBS TPTY SUP EXPBZA01:55OGL03:511:56SA2A,3A,SL,GN,22879 Status
16863BGKT MQ EXPRESSBZA02:40OGL04:241:44TH2A,3A,SL,GN,16863 Status
22632ANUVRAT EXPBZA02:40OGL04:241:44SU1A,2A,3A,22632 Status
15120MUV RMM EXPBZA02:45OGL04:411:56SU2A,3A,SL,GN,15120 Status
16360PNBE ERS EXPRESBZA03:00OGL04:521:52TU2A,3A,SL,GN,16360 Status
07115HYB KCVL SPLTEL04:00OGL05:231:23SA2A,3A,SL,GN,07115 Status
22707TPTY DOUBLE DECKBZA04:10OGL07:042:54M,TH,SACC22707 Status
12710SIMHAPURI EXPBZA04:35SKM07:042:29M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12710 Status
67298BZA GDR MEMUPVD05:32UPD09:444:12M,TU,W,TH,F,SA,SUUNRESERVED67298 Status
12711PINAKINI EXPBZA06:00SKM08:262:26M,TU,W,TH,F,SA,SUCC,2S,GN,12711 Status
12296SANGHA MITRA EXBZA06:10OGL08:142:04M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12296 Status
12670GANGAKAVERI EXPBZA06:40OGL08:181:38M,W2A,3A,SL,GN,12670 Status
12577BAGMATI EXPRESSBZA07:17OGL09:182:01TU2A,3A,SL,GN,12577 Status
22351PPTA YPR EXPBZA07:20OGL09:181:58F2A,3A,SL,GN,22351 Status
22612NJP MAS EXPRESSBZA07:30OGL09:091:39F2A,3A,SL,GN,22612 Status
15906VIVEK EXPRESSBZA07:30OGL09:091:39SA2A,3A,SL,GN,15906 Status
02194JBP TEN SUP SPLBZA07:30OGL09:281:58TH2A,3A,SL,GN,02194 Status
22859PURI CHENNAI EXPBZA07:30OGL09:091:39SU2A,3A,SL,GN,22859 Status
07607NED TPTY EXPBZA07:40OGL09:482:08TU2A,3A,SL,GN,07607 Status
20889HUMSAFAR EXPBZA08:00OGL09:381:38SA3A20889 Status
22887HUMSAFAR EXPBZA08:00OGL09:391:39TU3A22887 Status
22825SHM MAS SF EXPBZA08:05OGL09:591:54TU2A,3A,SL,GN,22825 Status
22614HLZ MAS SUP EXPBZA08:05OGL09:591:54SA3A,SL,GN,22614 Status
22605PRR VM EXPRESSBZA08:05OGL09:591:54M,F2A,3A,SL,GN,22605 Status
17479PURI TPTY EXPBZA08:15SKM11:122:57M,W,TH,F,SU2A,3A,SL,GN,17479 Status
17481BSP TPTY EXPRESSBZA08:15SKM11:122:57TU,SA2A,3A,SL,GN,17481 Status
12655NAVJEEVAN EXPBZA08:20OGL10:141:54M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12655 Status
67263BZA OGL MEMUPVD08:24OGL11:403:16M,TU,W,TH,F,SA,SUUNRESERVED67263 Status
22664JU MS SF EXPRESSBZA09:30OGL11:241:54M2A,3A,SL,GN,22664 Status
67255GNT OGL MEMUSJL10:26OGL14:003:34M,TU,W,TH,F,SA,SUUNRESERVED67255 Status
22851MAQ VIVEK EXPBZA10:50OGL12:491:59TH2A,3A,SL,GN,22851 Status
15930DBRG MS EXPRESSBZA12:25OGL14:191:54SU2A,3A,SL,GN,15930 Status
12663HWH TPJ EXPRESSBZA12:25OGL14:141:49TH,SU1A,2A,3A,SL,GN,12663 Status
15630NAGAON EXPRESSBZA12:25OGL14:191:54F1A,2A,3A,SL,GN,15630 Status
12665KANNYAKUMARI EXPBZA12:25OGL14:191:54M2A,3A,SL,GN,12665 Status
22877HWH ERS ANTYODAYA EXPBZA12:30OGL14:251:55SAUNRESERVED22877 Status
12389GAYA MS EXPRESSBZA12:50OGL14:391:49SU2A,3A,SL,GN,12389 Status
82636KCVLGHY SUVIDHATEL13:02OGL11:221:40SU3A,SL,GN,82636 Status
17406KRISHNA EXPPVD13:20SKM16:032:43M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN,17406 Status
22841SRC MAS ANTYODAYA EXPRESSBZA14:15OGL15:591:44MUNRESERVED22841 Status
22807SRC MAS AC EXPBZA14:25OGL16:091:44TU,F1A,2A,3A,22807 Status
12612MAS GARIB RATHBZA14:25OGL16:171:52M3A12612 Status
18567VSKP QLN EXPBZA14:25SKM16:392:14TH2A,3A,SL,GN,18567 Status
67234BZA BTTR PASSPVD14:54UPD19:294:35M,TU,W,TH,F,SA,SUUNRESERVED67234 Status
57258TIRUPATI PSGRPVD15:17UPD19:524:35M,TU,W,TH,F,SA,SUSL,GN,57258 Status
12078JAN SHATABDIBZA15:20OGL17:542:34M,W,TH,F,SA,SUCC,2S,GN,12078 Status
22837DHARTI AABA EXPBZA15:40OGL17:241:44M2A,3A,GN,22837 Status
12889TATA YPR EXPBZA15:40OGL17:241:44F2A,3A,SL,GN,12889 Status
13576JSME TBM EXPBZA15:45OGL17:281:43W2A,3A,SL,GN,13576 Status
12376ASN MAS EXPRESSBZA15:45OGL17:281:43W2A,3A,SL,GN,12376 Status
22647KRBA TVC EXPRESBZA15:55OGL17:592:04W,SA2A,3A,SL,GN,22647 Status
22645AHILYANAGARI EXBZA15:55OGL17:592:04M2A,3A,SL,GN,22645 Status
12511RAPTI SAGAR EXPBZA15:55OGL17:592:04TH,F,SU2A,3A,SL,GN,12511 Status
12521RAPTI SAGAR EXPBZA15:55OGL17:592:04M1A,2A,3A,SL,GN,12521 Status
18189TATA ALLP EXPBZA16:55SKM19:242:29M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18189 Status
12863HWH YPR EXPRESSBZA17:00OGL18:491:49M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12863 Status
13351DHN ALAPPUZHA EBZA17:25SKM19:592:34M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
17230SABARI EXPTEL18:00SKM19:591:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17230 Status
57278BZA BTTR PASSPVD18:40UPD22:183:38M,TU,W,TH,F,SA,SUUNRESERVED57278 Status
12254ANGA EXPRESSBZA18:50OGL20:441:54W2A,3A,SL,GN,12254 Status
16318HIMSAGAR EXPBZA19:10OGL20:591:49M2A,3A,SL,GN,16318 Status
07117HYB ERS SPLTEL19:32OGL21:001:28W2A,3A,SL,GN,07117 Status
07418NSL TPTY EXPTEL19:40OGL21:402:00SA2A,3A,SL,GN,07418 Status
12660GURUDEV EXPRESSBZA20:15OGL22:192:04W2A,3A,SL,GN,12660 Status
12839HWH MAS MAILBZA20:30OGL22:302:00M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12839 Status
17644CIRCAR EXPBZA20:45SKM00:464:01M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17644 Status
06335GHY KCVL SPECIALBZA20:55OGL23:102:15W3A,SL,GN,06335 Status
17488TIRUMALA EXPRESSBZA21:00OGL23:092:09M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17488 Status
17247NS DMM EXPBZA21:30OGL23:221:52M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17247 Status
17245MTM DMM EXPBZA21:30OGL23:221:52M,TU,W,TH,F,SA,SU3A,SL,GN,17245 Status
17404NS TPTY EXPBZA21:40OGL23:321:52M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17404 Status
22502NTSK SBC EXPRESSBZA21:40OGL23:291:49F2A,3A,SL,GN,22502 Status
17402MTM TPTY EXPBZA21:40OGL23:321:52M,TU,W,TH,F,SA,SU3A,SL,GN,17402 Status
17210SHESHADRI EXPBZA22:55SKM01:122:17M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17210 Status
12604CHENNAI EXPTEL23:05SKM00:431:38M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12604 Status
07941CCT RU SPLBZA23:15OGL01:482:33MUNRESERVED07941 Status
12616G T EXPRESSBZA23:20OGL01:171:57M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12616 Status
16688NAVYUG EXPRESSBZA23:40OGL01:391:59TH2A,3A,SL,GN,16688 Status
12734NARAYANADRI EXPTEL23:55SKM01:552:00M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12734 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.607/2020-2118-02-2021
Secunderabad
Shri Gajanan Mallya, General Manager, SCR conducts Annual Inspection of Vijayawada Division




-Annual Inspection conducted between Gudur – o­ngole – Tenali section

Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Gudur – o­ngole – Tenali section of Vijayawada Division today i.e., 16th February, 2021. He was accompanied by Shri P. Srinivas, Divisional Railway Manager, Vijayawada Division, Principal Head of the Departments and other senior officials throughout the inspection.

The General Manager commenced the inspection at Gudur Railway station and proceeded further to Manubolu – Kommarapudi section where he inspected the Road Under Bridge (RUB), Level Crossing Gate and Relay Room. He inspected Level crossing gate between Kommarapudi – Venkatachalam section, where he reviewed the safety aspects and also interacted with the Gateman. The General Manager inspected Venkatachalam Railway station and discussed o­n various station developmental plans with the officials, He carried out a speed test of 120 Kmph between Venkatachalam – Nellore section. The General Manager inspected minor bridges between Kommarapudi – Venkatachalam and Alluru – Bitragunta sections.

Shri Gajanan Mallya, General Manager, SCR inspected Bitragunta Railway station and discussed o­n station developmental plans with the officials. He inaugurated a Crew Booking Lobby, New Freight Examination facility and flagged off a goods train. He inspected the new Carriage & Workshop office at Bitragunta station. He inspected the facilities available at Bitragunta running room and discussed o­n further improvements with the officials. The General Manager also planted saplings towards green environment at Bitragunta. He conducted a speed test between Kavali – Singarayakonda section.

The General Manager inspected the Road Under Bridge (RUB) and a major bridge between Ulavapadu – Singarayakonda – Tanguturu section. The General Manager inspected a bridge over the Romperu river between Uppugunduru – Chinnaganjam section and interacted with the track maintainers. He inspected the level crossing gate between Tsunduru – Tenali section. The General Manager inspected Tenali Railway station, the Health Unit and reviewed the facilities available. The General Manager also visited the staff quarters and Railway colony at Tenali where he interacted with the residents o­n the facilities provided. During the inspection, the General Manager inspected and reviewed overall track maintenance o­n the entire stretch of Gudur – Tenali section and also conducted speed tests o­n the section.





2
No.76/2020–2102-05-2020
Chennai
To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown

https://sr.indianrailways.gov.in/cris//webadmin/cms/upload.jsp


PRESS INFORMATION BUREAU

GOVERNMENT OF INDIA

*****

To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown.


Pending for several years, they confronted Indian Railways as bottlenecks in different zones across the country.


Around 500 modern heavy duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track & 5263 nos. of Turn outs


Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine.


Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service

New Delhi, 02nd May, 2020


Backend warriors of Indian Railways have successfully executed long pending Maintenance works like Yard remodelling, Renewal of Scissors Crossover, Repairs of Bridges during this lockdown. Pending for several years, they often confronted Indian Railways as bottlenecks.


Apart from ensuring supply chains all essential commodities running through parcel trains and freight trains, Indian Railways executed these long pending maintenance works during this lockdown period when passenger services were suspended due to COVID -19.


Indian Railways focused o­n several long pending overdue maintenance works requiring Traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service.

The maintenance of assets was taken up regularly to continue the supply chain of essential goods to public.

Around 500 modern heavy duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track & 5263 nos. of Turn outs.


Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 kms. of track at 5362 peak locations indicated by OMS test has been attended to ensure proper quality. Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine. Critical summer precaution activities like de-stressing of long welded rail (LWR)which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social distancing norms. 2,246 kms of de-stressing of LWR has been done.


SOME OF THE IMPORTANT TRACK WORKS:


  1. Renewal of wooden layout Scissors crossover with standard Pre-stress Concrete (PSC) layout in KAZIPET yard (South Central Railway).

A major block of 72 hrs was taken in Kazipet yard for pending yard remodelling to replace old wooden scissors crossover laid in1970 with standard PSC layout. It will improve the safety and speed of train movement through the yard.




  1. Renewal of Scissors Crossover at Vijayawada Yard with PSC Layout (South Central Railway).


Two blocks of 24 hours were taken o­n 09.04.20 and 10.04.20 during the lockdown period for renewal of old wooden layout Scissors crossover with standard PSC layout crossover providing a vital link and flexibility in the operations of the yard. This will improve movement of train service towards Secundrabad and Vishakhapatnam.










  1. Repair of Cement Concrete (CC) apron o­n Line no 1 and 2 at Baroda station (Western Railway).


The repair of CC aprons of Line no. 1 was undertaken in a traffic block of 4 days (8/4/2020- 11/4/2020) and of Line no 2 in a traffic block of 12 days (13/4/2020- 24/4/2020) using Ultra high strength, free flowing non shrink cement grout. The grout has arrested the pumping action of track o­n line no. 1 & 2 at the affected locations.


  1. Remodeling work in Bangalore City yard (South Western Railway):


Work of Bangalore City Yard remodeling for simultaneous receipt and dispatch of trains at Mysore end was completed successfully. This work was pending for more than last 10 years and would have involved cancellation/short termination of 60 Mail/Express Trains under normal circumstances.


IMPORTANT BRIDGE WORKS:-


  1. Re-girdering of Bridge No. 86 o­n Tunga River near Shivamogga Town (South Western Railway).


This is an important bridge having15 spans of 18.30m steel plate girders at Km. 61/100-500 o­n Birur Jn - Telguppa section of Mysore division. This work in normal times would have required traffic block of about 45 hours at 3:00 hours each day.


The existing steel girders are non-standard and being replaced with 25T loading standard steel girders. The height of the bridge is about 20m from river bed. The launching of all girders will be completed by 02.05.2020.







  1. Dismantling of Road Over Bridge (ROB) near Chennai Station (Southern Railway) :


Dismantling of unsafe ROB crossing 8 tracks o­n the approach of Chennai Central Station has been started o­n 26.03.20 and will be completed by 03.05.20. If done in normal time, it would have required 48 hours traffic blockon line 1 to 6 and72 hours traffic block o­n line 7 & 8 (suburban lines)with at least double the resources and cost apart from massive cancellation/rescheduling of trains with resultant loss of passenger revenue.


  1. Insertion of twin box segments of size 4.65x5.15m for subway in lieu of manned level crossing no. 493 (East Coast Railway):


A subway work was done between Visakhapatnam-Gopalapatnam section o­n 21.04.2020 in a traffic block of 9 hrs.This will facilitate closure of level crossing thereby improving safety of public. This work was pending from long time for want of traffic block.


  1. Construction of bridge in Rajahmundry-Vishakhapatnam section to cater opening of 4 x 5.5 m (South Central Railway).



The work involves provision of new bridge in HUDUD affected area where the track was washed out 2 times in 2013 & 2014. Total 21 hours traffic block was availed at 7:00 hrs each o­n 25.04.2020, 27.04.2020 and 28.04.2020. This bridge was required for passage of flood water to avoid breaches.

v. Insertion of Box at Bridge No. 525 (South Central Railway):


16 Boxes of size (4.6x4 m) were inserted at Bridge no. 525 o­n UP line at km 266/7-5 between Tanguturu–Singarayakonda o­n 29.04.2020 in critical situation successfully within traffic block of 8 hrs.



  1. Launching of 6 Foot Over Bridges (FOBs) under Bhusawal division (Central Railway)


Work of launching of 5 FOBs during the lockdown has been completed o­ne each at Bhusawal, Bodwad, Akola, New Amravati and Chandur Bazar Railway stations. 6th and the last o­ne at Nandurastation has also been targeted o­n 2.5.2020.


  1. Dismantling of old abandoned twin FOBs at Ludhiana railway station (Northern Railway).


100-year-old twin FOBs were closed to passenger use since 2014. However, dismantling of old FOB in OHE territory blocking all lines for more than 10-12 hours for several days was not feasible o­n New Delhi- Amritsar route. During lockdown, dismantling of these FOBs has been planned to complete in traffic blocks of 8-10 hrs. for 8 days. 2 traffic blocks have already been availed for successful dismantling of FOBs.




  1. Launching of Service girder for Canal work (East Central Railway):


Long pending work of launching of service girder in connection with Canal work of State Govt., requiring 10+ hours block was completed in Kakarghatti-Tarsarai busy single line section of Samastipur division.



  1. Dismantling of Talla ROB (Eastern Railway):


The ROB was unsafe for passenger, therefore, same was closed for re-construction. 8 spans of the ROB over Kolkata terminal station crossing 11 tracks and stabling lines were dismantled. In normal situation it would have a huge impact o­n passenger (especially suburban services) and freight services due to traffic blocks.







(B.Guganesan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit