For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

KAZIPET JN

STATION INFO

Address: Kazipet, Andhra Pradesh, India

Station Code: KZJ)KAZIPET J

Station Name: KZJ)KAZIPET JN

Zone: SCR/South Central

Total Unique Trains: 128

Train Frequency Weekly: 450

Station Traffic: High

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
12771SC NGP SUP EXP00:0300:052M,W,F2A,3A,SL,GN
17005HYB RXL EXPRESS00:0300:052TH2A,3A,SL,GN
17007SC DBG EXPRESS00:0300:052TU,SA2A,3A,SL,GN
12750BIDR MTM SF EXP00:2300:241M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12710SIMHAPURI EXP00:4800:502M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12721NIZAMUDDIN EXP01:1001:3020M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12861LINK DAKSIN EXP01:1001:3020M,TU,W,TH,F,SA,SU2A,3A,SL,GN
17214NSL NS EXP01:1401:151TU,W,TH,F,SU1A,2A,3A,SL,GN
07257HYB BZA SPL01:1801:202M2A,3A,SL,GN
12722DAKSHIN EXPRESS01:2001:4020M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12722DAKSHIN EXPRESS01:2002:4020M,TU,W,TH,F,SA,SU2A,3A,SL,GN
17025MUGR SC EXPRESS01:4301:452M,TU,W,TH,F,SA,SU2A,3A,SL,GN
17037SC HSR EXP01:4801:502TU,W2A,3A,SL,2S,GN
17026SC MUGR EXPRESS01:5001:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12749MTM BIDR SF EXP01:5902:012M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
07608TPTY NED EXP02:0302:052W2A,3A,SL,GN
04156KCG CNB SF SPL02:0502:072F2A,3A,SL,GN
15016YPR GORAKPUR EXP02:0502:072TH2A,3A,SL,GN
12737GOUTAMI EXP02:2302:252M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12709SIMHAPURI EXP02:3302:352M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12763PADMAVATHI EXP02:4802:502M,TU,W,F,SA2A,3A,SL,GN
07146TPTY KCG SPL02:4802:502TH2A,3A,SL,2S,GN
12727GODAVARI EXP03:0503:072M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
07607NED TPTY EXP03:2003:255TU2A,3A,SL,GN
07147VSKP KCG SPL03:3003:322M2A,3A,SL,2S,GN
12975JAIPUR EXPRESS04:2004:222TH,SA1A,2A,3A,SL,GN
12759CHARMINAR EXP04:4004:422M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12783VSKP SC AC EXP04:4504:461SU1A,2A,3A
12772NGP SC SUP EXP05:1805:191TU,TH,SA2A,3A,SL,GN
67265WL HYB MEMU05:3005:322M,TU,W,TH,F,SA,SUUNRESERVED
17038HSR SC EXPRESS05:5005:522F,SU2A,3A,SL,2S,GN
20809NAGAVALI EXPRESS06:0006:022M,F,SU2A,3A,SL,GN
20811VSKP NED SF EXP06:0006:022TU,W,SA2A,3A,SL,GN
57626KAKATHIYA F PSR06:0406:062M,TU,W,TH,F,SA,SUSL,GN
12193YPR JBP EXP06:2306:252SU2A,3A,SL,GN
22127ANANDWAN EXPRESS06:45Des--M2A,3A,SL,GN
12708AP SMPRK KRANTI06:4806:502W,F,SU2A,3A,SL,GN
17011HYB SKZR EXPRES07:2807:302M,TU,W,TH,F,SA,SUUNRESERVED
22850SC SHM WKLY EXP07:3007:322F2A,3A,SL,GN
17234BHAGYANAGAR EXP07:4507:505M,TU,W,TH,F,SA,SUCC,2S,GN
17406KRISHNA EXP08:1808:202M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN
12723TELANGANA EXP08:4008:422M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
11020KONARK EXPRESS08:4308:452M,TU,W,TH,F,SA,SU2A,3A,SL,GN
11304KOP MUGR EXPRESS08:5008:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12590GORAKHPUR EXP09:1409:162F2A,3A,SL,GN
12592GORAKHPUR EXP09:1409:162M2A,3A,SL,GN
22705JAT HUMSAFAR SF09:1409:162TU3A
12648KONGU EXPRESS09:2309:252W2A,3A,SL,GN
22691RAJDHANI EXP09:2809:302M,TU,W,TH,F,SA,SU1A,2A,3A
12713SATAVAHANA EXP09:3309:352M,TU,W,TH,F,SA,SUCC,2S,GN
12706SC GNT EXP09:4509:472M,TU,W,TH,F,SA,SUCC,2S,GN
57135AJNI KZJ PASS09:50Des--M,TU,W,TH,F,SA,SUUNRESERVED
11019KONARK EXPRESS10:0810:102M,TU,W,TH,F,SA,SU2A,3A,SL,GN
18519VSKP LTT EXPRESS10:0810:102M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12757KAGHAZNAGAR EXP10:2310:252M,TU,W,TH,F,SA,SUCC,2S,GN
17201GOLCONDA EXP10:3810:402M,TU,W,TH,F,SA,SUCC,2S,GN
02783BBS SC SPL11:1011:111TH,SU2A,3A,SL,GN
17205SNSI COA EXP11:1811:202TU,TH,SU2A,3A,SL,GN
17207SNSI BZA EXP11:1811:202W2A,3A,SL,GN
18504SNSI VSKP EXP11:1811:202F2A,3A,SL,GN
12438NZM SC RJDHNI11:2511:272SU1A,2A,3A
12791SC DNR EXPRESS11:2811:302M,TU,W,TH,F,SA,SU2A,3A,SL,GN
22849SHM SC WKLY EXP11:3811:402W2A,3A,SL,GN
57657MUGR KZJ PASS11:50Des--M,TU,W,TH,F,SA,SUUNRESERVED
12589GKP SC EXPRESS12:2512:272W2A,3A,SL,GN
12591GKP YPR EXPRESS12:2512:272SA2A,3A,SL,GN
15015GKP YPR EXPRESS12:2512:272M2A,3A,SL,GN
18646EAST COAST EXP12:3812:402M,TU,W,TH,F,SA,SU2A,3A,SL,GN
67264HYB WL MEMU12:4712:503M,TU,W,TH,F,SA,SUUNRESERVED
12251WAINGANGA EXP13:1813:202TU,F2A,3A,SL,GN
12647KONGU EXPRESS13:1813:202SU2A,3A,SL,GN
22683YPR LKO EXP13:1813:202M2A,3A,SL,GN
15024YPR GKP EXP13:1813:202TH2A,3A,SL,GN
17206COA SNSI EXP13:5013:522M,W,SA2A,3A,SL,GN
17208BZA SNSI EXP13:5013:522TU2A,3A,SL,GN
67267WL HYB MEMU14:1514:172M,TU,W,TH,F,SA,SUUNRESERVED
02784SC BBS SPL14:2514:261W,SA2A,3A,SL,GN
18645EAST COAST EXP14:2814:302M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12437RAJDHANI EXP14:2814:302W1A,2A,3A
17202GOLCONDA EXP14:4414:462M,TU,W,TH,F,SA,SUCC,2S,GN
11083TADOBA EXPRESS15:00Des--F2A,3A,SL,GN
17012SKZR SC EXP15:0315:052M,TU,W,TH,F,SA,SUUNRESERVED
22692BANGLORE RJDHNI16:0516:072M,TU,W,TH,F,SA,SU1A,2A,3A
12724TELANGANA EXP16:4516:472M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12758KAGHAZNAGAR EXP16:5917:001M,TU,W,TH,F,SA,SUCC,2S,GN
17405KRISHNA EXPRESS17:0917:101M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN
17213NS NSL EXP17:1917:201M,TU,W,TH,SA1A,2A,3A,SL,GN
17233BHAGYANAGAR EXP17:4517:505M,TU,W,TH,F,SA,SUCC,2S,GN
12714SATAVAHANA EXP18:0718:092M,TU,W,TH,F,SA,SUCC,2S,GN
04155CNB KCG SF SPL18:2818:302TH2A,3A,SL,GN
22151PA KAZIPET SF EX18:35Des--F2A,3A,SL,GN
15023GKP YPR EXP18:3818:402TU2A,3A,SL,GN
18503VSKP SNSI EXP18:3818:402TH2A,3A,SL,GN
12792SECUNDERABAD EX18:4818:502M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12705GNT SC EXP19:1119:132M,TU,W,TH,F,SA,SUCC,2S,GN
12728GODAVARI EXP19:3019:322M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12707A P SMPRK KRNTI19:3919:401M,W,F2A,3A,SL,GN
12784SC VSKP AC EXP19:3919:401SA1A,2A,3A
17008DBG SC EXPRESS19:4019:411TU,F2A,3A,SL,GN
11303MUGR KOP EXPRESS19:5019:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
57122SRUR KZJ PASS20:00Des--M,TU,W,TH,F,SA,SUUNRESERVED
22706TPTY HUMSAFAR20:0820:102F3A
07010BJU SC SPL20:1020:122W2A,3A,SL,GN
17006DBG HYB EXPRESS20:1020:122SU2A,3A,SL,GN
57238BZA KZJ PASS20:15Des--M,TU,W,TH,F,SA,SUUNRESERVED
12764PADMAVATI EXP20:1820:202M,TU,TH,F,SU2A,3A,SL,GN
12760CHARMINAR EXP20:5320:552M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12976JP MYSORE EXP20:5821:002M,W1A,2A,3A,SL,GN
07148KCG VSKP SPL21:1821:202SU2A,3A,SL,2S,GN
57625KAKATIYA F PAS21:3021:355M,TU,W,TH,F,SA,SUSL,GN
67266HYB KZJ MEMU22:00Des--M,TU,W,TH,F,SA,SUUNRESERVED
12194JBP YPR SUP EXP22:1822:202SA2A,3A,SL,GN
12252WAINGANGA EXP22:1822:202TH,SU2A,3A,SL,GN
22684LKO YPR SUP22:1822:202TH2A,3A,SL,GN
18520LTT VSKP EXP23:0323:052M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
12738GOUTAMI EXP23:1823:202M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
67270DKJ KZJ MEMU23:30Des--M,TU,W,TH,F,SA,SUUNRESERVED
20810NAGAWALI SF EXP23:5323:552M,TU,SA2A,3A,SL,GN
20812NED VSKP SF EXP23:5323:552W,TH,SU2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure
11084TADOBA EXPRESSSrc17:35--SA2A,3A,SL,GN
57136KZJ AJNI PASSSrc22:50--M,TU,W,TH,F,SA,SUUNRESERVED
57121KZJ BPQ PASSSrc05:00--M,TU,W,TH,F,SA,SUUNRESERVED
57237KZJ BZA PASSSrc04:00--M,TU,W,TH,F,SA,SUUNRESERVED
57658KZJ MUGR PASSSrc13:05--M,TU,W,TH,F,SA,SUUNRESERVED
67269KZJ DKJ MEMUSrc06:40--M,TU,W,TH,F,SA,SUUNRESERVED
12862KZJ VSKP LINK EXPSourcee02:40--M,TU,W,TH,F,SA,SUUNRESERVED
22128ANANDWAN EXPSourcee18:25--TU2A,3A,SL,GN
22152KZJ PUNE SF EXPSourcee13:30--SU2A,3A,SL,GN



RECENT NEWS

1
No.158/2020-21 27-06-2020
Chennai
200 Railway Maintenance Projects of critical importance completed during Covid-19 lockdown period.


This will boost safety and speed of Train operations in key sections of tracks.

The backend warriors of Indian Railways have fully availed the opportunity provided by suspension of passenger services due to pandemic of COVID 19 to successfully executed more than 200 long pending maintenance works including yard remodeling, repair and re-girdering of oldbridges, doubling and electrification of rail lines andrenewal of scissor crossovers. Pending for several years, these unfinished projects often confronted Indian Railways as bottlenecks.

Apart from ensuring supply chains all essential commodities running through parcel trains and freight trains, Indian Railways executed these long pending maintenance works during this lockdown period when passenger services were suspended.

During this period Indian Railways focused o­n several long pending overdue maintenance works which required traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. They were planned during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service.

These works taken up for removal of bottlenecks and enhance safety include 82 rebuilding/rehabilitation of bridge, 48 limited height subway/road under bridge in lieu of level crossing gate, 16 construction/strengthening of foot over bridge, 14 dismantling of old foot over bridge, 7 launching of road over bridge, 5 yard remodelling, 1 commissioning of doubling & electrification and 26 other projects.

Some of these key projects are as follows -

Yard Modification work in Jolarpetti (Chennai Division, Southern Railway) was completed o­n 21stMay 2020.It resulted in easing out of curve and enhancing the speed up to 60Kmph o­n Bengaluru end and facilitated Simultaneous reception and dispatch.

                                   

Likewise dismantling of old abandoned unsafe Foot Over Bridge at Ludhinana (Firozepur Division, Northern Railway) was completed o­n 5th May 2020. Dismantling of this 135 meter long old abandoned FOB structure over 19 tracks and 7 passenger platforms was overdue since 2014 after new FOB was commissioned. 

Work of re-girdering of bridge o­n Tunga River (Mysuru Division, South Western Railway) was completed o­n 3rd May 2020. Dismantling of unsafe deck of Kopar Road ROB near Dombivali (Mumbai Division, Central Railway) was completed o­n 30rdApril 2020 and it resulting in enhanced safety. This deck was declared unsafe for road users in 2019 and covered 6 railway tracks below. 

Two projects of Doubling with Electrification in Varanasi Division, North Eastern Railway were completed o­n 13th June. o­ne of these projects is Kachhwa Road to Madhosingh Section and the second is 16 km of Manduadih to Prayagraj Section. This resulted in decongestion of east - west routes and facilitation of freight movement. The dismantling work of ROB crossing 8 railway tracks in the approach of Chennai Central Station was completed o­n 9th May 2020. This ROB was declared unsafe and was closed for heavy vehicles since July 2016. ROB dismantling could not be done as traffic block requirement was very high resulting into massive cancellation /rescheduling of trains with loss of passenger revenue. 

Works o­n construction of two new bridges in Vijayawada Division of South Central Railway were completed o­n 3rd May. o­n Howrah- Chennai route, the construction of limited height subway for LC elimination in Khurda Road Division in East Coast Railway was completed o­n 9thMay 2020 resulting in increased operational efficiency of trains and Safety. Signalling upgradation work of Azamgarh station (Varanasi Division, North Eastern Railway) was completed o­n 23rd May. Mau - Shahganj section has been upgraded to STD.-II (R), yard speed upgraded from 50 kmph to 110 kmph and simultaneous reception, dispatch and shunting facility provided.

Likewise, renewal of wooden layout Scissors crossover with standard Pre-stress Concrete (PSC) layout in Vijayawada & Kazipet yards (Vijayawada Division, South Central Railway) has been completed. A major block of 72 hrs was taken in Kazipet yard for pending yard remodelling. The old wooden scissors crossover laid in 1970 was replaced with standard PSC layout. Insertion of RCC box at Tilak Nagar station (Mumbai Division, Central Railway) was completed in two mega blocks of 28 hrs and 52 hrs durations o­n 3rd May. This work was taken up to address the problem of flooding in rainy season near Tilak Nagar station o­n harbour line.

The innovative pilot project for powering Trains by solar power, developed over a vacant railway land at Bina is under extensive testing. This 1.7 Mega Watt project to directly feed to 25 kV Railway Overhead Line is a joint venture of Indian Railways and BHEL.

**

PIB COURTESY




(B.Guganesan)
Chief Public Relations Officer




2
No.76/2020–2102-05-2020
Chennai
To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown

https://sr.indianrailways.gov.in/cris//webadmin/cms/upload.jsp


PRESS INFORMATION BUREAU

GOVERNMENT OF INDIA

*****

To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown.


Pending for several years, they confronted Indian Railways as bottlenecks in different zones across the country.


Around 500 modern heavy duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track & 5263 nos. of Turn outs


Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine.


Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service

New Delhi, 02nd May, 2020


Backend warriors of Indian Railways have successfully executed long pending Maintenance works like Yard remodelling, Renewal of Scissors Crossover, Repairs of Bridges during this lockdown. Pending for several years, they often confronted Indian Railways as bottlenecks.


Apart from ensuring supply chains all essential commodities running through parcel trains and freight trains, Indian Railways executed these long pending maintenance works during this lockdown period when passenger services were suspended due to COVID -19.


Indian Railways focused o­n several long pending overdue maintenance works requiring Traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service.

The maintenance of assets was taken up regularly to continue the supply chain of essential goods to public.

Around 500 modern heavy duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track & 5263 nos. of Turn outs.


Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 kms. of track at 5362 peak locations indicated by OMS test has been attended to ensure proper quality. Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine. Critical summer precaution activities like de-stressing of long welded rail (LWR)which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social distancing norms. 2,246 kms of de-stressing of LWR has been done.


SOME OF THE IMPORTANT TRACK WORKS:


  1. Renewal of wooden layout Scissors crossover with standard Pre-stress Concrete (PSC) layout in KAZIPET yard (South Central Railway).

A major block of 72 hrs was taken in Kazipet yard for pending yard remodelling to replace old wooden scissors crossover laid in1970 with standard PSC layout. It will improve the safety and speed of train movement through the yard.




  1. Renewal of Scissors Crossover at Vijayawada Yard with PSC Layout (South Central Railway).


Two blocks of 24 hours were taken o­n 09.04.20 and 10.04.20 during the lockdown period for renewal of old wooden layout Scissors crossover with standard PSC layout crossover providing a vital link and flexibility in the operations of the yard. This will improve movement of train service towards Secundrabad and Vishakhapatnam.










  1. Repair of Cement Concrete (CC) apron o­n Line no 1 and 2 at Baroda station (Western Railway).


The repair of CC aprons of Line no. 1 was undertaken in a traffic block of 4 days (8/4/2020- 11/4/2020) and of Line no 2 in a traffic block of 12 days (13/4/2020- 24/4/2020) using Ultra high strength, free flowing non shrink cement grout. The grout has arrested the pumping action of track o­n line no. 1 & 2 at the affected locations.


  1. Remodeling work in Bangalore City yard (South Western Railway):


Work of Bangalore City Yard remodeling for simultaneous receipt and dispatch of trains at Mysore end was completed successfully. This work was pending for more than last 10 years and would have involved cancellation/short termination of 60 Mail/Express Trains under normal circumstances.


IMPORTANT BRIDGE WORKS:-


  1. Re-girdering of Bridge No. 86 o­n Tunga River near Shivamogga Town (South Western Railway).


This is an important bridge having15 spans of 18.30m steel plate girders at Km. 61/100-500 o­n Birur Jn - Telguppa section of Mysore division. This work in normal times would have required traffic block of about 45 hours at 3:00 hours each day.


The existing steel girders are non-standard and being replaced with 25T loading standard steel girders. The height of the bridge is about 20m from river bed. The launching of all girders will be completed by 02.05.2020.







  1. Dismantling of Road Over Bridge (ROB) near Chennai Station (Southern Railway) :


Dismantling of unsafe ROB crossing 8 tracks o­n the approach of Chennai Central Station has been started o­n 26.03.20 and will be completed by 03.05.20. If done in normal time, it would have required 48 hours traffic blockon line 1 to 6 and72 hours traffic block o­n line 7 & 8 (suburban lines)with at least double the resources and cost apart from massive cancellation/rescheduling of trains with resultant loss of passenger revenue.


  1. Insertion of twin box segments of size 4.65x5.15m for subway in lieu of manned level crossing no. 493 (East Coast Railway):


A subway work was done between Visakhapatnam-Gopalapatnam section o­n 21.04.2020 in a traffic block of 9 hrs.This will facilitate closure of level crossing thereby improving safety of public. This work was pending from long time for want of traffic block.


  1. Construction of bridge in Rajahmundry-Vishakhapatnam section to cater opening of 4 x 5.5 m (South Central Railway).



The work involves provision of new bridge in HUDUD affected area where the track was washed out 2 times in 2013 & 2014. Total 21 hours traffic block was availed at 7:00 hrs each o­n 25.04.2020, 27.04.2020 and 28.04.2020. This bridge was required for passage of flood water to avoid breaches.

v. Insertion of Box at Bridge No. 525 (South Central Railway):


16 Boxes of size (4.6x4 m) were inserted at Bridge no. 525 o­n UP line at km 266/7-5 between Tanguturu–Singarayakonda o­n 29.04.2020 in critical situation successfully within traffic block of 8 hrs.



  1. Launching of 6 Foot Over Bridges (FOBs) under Bhusawal division (Central Railway)


Work of launching of 5 FOBs during the lockdown has been completed o­ne each at Bhusawal, Bodwad, Akola, New Amravati and Chandur Bazar Railway stations. 6th and the last o­ne at Nandurastation has also been targeted o­n 2.5.2020.


  1. Dismantling of old abandoned twin FOBs at Ludhiana railway station (Northern Railway).


100-year-old twin FOBs were closed to passenger use since 2014. However, dismantling of old FOB in OHE territory blocking all lines for more than 10-12 hours for several days was not feasible o­n New Delhi- Amritsar route. During lockdown, dismantling of these FOBs has been planned to complete in traffic blocks of 8-10 hrs. for 8 days. 2 traffic blocks have already been availed for successful dismantling of FOBs.




  1. Launching of Service girder for Canal work (East Central Railway):


Long pending work of launching of service girder in connection with Canal work of State Govt., requiring 10+ hours block was completed in Kakarghatti-Tarsarai busy single line section of Samastipur division.



  1. Dismantling of Talla ROB (Eastern Railway):


The ROB was unsafe for passenger, therefore, same was closed for re-construction. 8 spans of the ROB over Kolkata terminal station crossing 11 tracks and stabling lines were dismantled. In normal situation it would have a huge impact o­n passenger (especially suburban services) and freight services due to traffic blocks.







(B.Guganesan)
Chief Public Relations Officer







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search