76 Trains from (ANB)AMMANABROLU to (VDD)VENDODU
Address: Ammanabrolu Railway Station, Ammanabrolu, Andhra Pradesh 523180, India
Station Code: ANB
Station Name: AMMANABROLU
Zone: SCR/South Central
Train Frequency Weekly: 113
Station Traffic: Medium
Address: Andhra Pradesh 524131, India
Station Code: VDD
Station Name: VENDODU
Zone: SCR/South Central
Train Frequency Weekly: 137
Station Traffic: Medium
RECENT NEWS
1
www.scr.indianrailways.gov.in- 2021-09-14
- To ease freight operations & to accommodate Longer Haul Goods trains - This is the second longer loop over the zone To enhance train operations, ease congestion and to accommodate long haul goods trains with additional wagons than the standard composition, SCR has commissioned a longer loop line at Navabpalem Railway Station of Vijayawada Division located oÂÂn the Grand trunk route of Vijayawada – Visakhapatnam section. This is the second longer loop that has been constructed oÂÂn the Zone, the first oÂÂne being at Bikkavolu station. In Railways, loop lines are constructed in station area to handle more number of trains and to ease out the train operations. Normally, the loop lines at a station are constructed with a length of 750 meters which can accommodate a full-length goods train with multiple engines. With the increasing need to transport huge quantities at a oÂÂne go, it has necessitated to handle longer trains having more number of wagons than the regular composition. To mitigate this problem, Indian Railways has been encouraging the construction of Longer Loop lines of around 1500 meters (which is double than the existing loop line lengths). Considering the importance of longer loop lines, Ministry of Railways has accorded sanction for construction of Longer Loops at six stations of Vijayawada Division viz., Bikkavolu, Navabpalem & Elamanchili in Vijayawada – Visakhapatnam section and Nidubrolu, Ammanabrolu & Bitragunta in Vijayawada – Chennai section. Out of these, now, two longer loops have been commissioned i.e., At Bikkavolu and Navabpalem stations. Works are in the fast progress at the remaining locations. Salient features of Longer Loop line at Navabpalem station v The Electronic interlocking system has been provided with 70 routes. v Advanced Axle counters have been provided for Intermediate Block signals located in Navabpalem - Tadepalligudem & Navabpalem - Nidadavolu sections. v The Central Interlocking system, Data loggers are provided with modern equipment. v Fire alarm facility is provided for enhanced protection. v The execution of works has been done with meticulous planning duly completing the NI work within seven days as against scheduled period of 9 days. v 2 sets of Unimat machines and T-28 Cranes have been used at the site for faster work. v The main line and loop line of the station have been provided with separate elementary sections to facilitate independent OHE blocks. Benefits of Longer Loop Lines v Will accommodate long haul trains like Jai Kisan specials where 2 freight trains are combined and run for quick mobility v Provision for crossing of trains to enable faster movement of trains without too much detention of freight trains v Improves punctuality of passenger trains by avoiding main line regulation of Goods trains v Improves overall train operations. v Reduces the wagon detention and travel expenses. v Enables in handling more number of trains. Shri Gajanan Mallya, General Manger, SCR complimented the officials of Vijayawada Division oÂÂn completion of second longer loop line over the Zone with sincere and dedicated efforts. He instructed the officials to complete the remaining longer loop lines oÂÂn fast pace for overall improvement in operation of freight trains in the busy trunk route section. 2
www.scr.indianrailways.gov.in- 2021-02-24
Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Gudur – Renigunta section of Guntakal Division today i.e., 23rd February, 2021. He was accompanied by Shri Alok Tiwari, Divisional Railway Manager, Guntakal Division and other senior officials throughout the inspection. The General Manager commenced inspection at the Level Crossing Gate between Kondagunta – Vendodu stations where he examined safety aspects and interacted with the Gateman. He visited Venkatagiri Railway Station, reviewed various passenger amenities, inspected Station Manager’s office, booking office, circulating area and also interacted with Track Maintainers. He inaugurated Natural Water Cooler facility set up at Venkatagiri station for the usage of passengers. He inspected Level Crossing Gate between Yathalur - Venkatagiri stations. The General Manager conducted a Speed Test of 110 Kmph in the section to examine the increase of sectional speed capacity to run trains with enhanced speed in the section. Also, the General Manager inspected a Minor & Major bridge before inspecting the operational facilities at New Tiruchanur Crossing Station. Shri Gajanan Mallya reviewed the additional loop line works being carried out at Chandragiri Railway Station. He inspected a Road under Bridge and Minor Bridge in the section. He inspected minor & major bridge oÂÂn Krishpuram river and Rallayeru Bridge. The General Manager during his visit at Pakala Railway Station inspected various facilities available at station and discussed about the station developmental plans with officials. He inspected facilities available at Health Unit. He reviewed the Good work done by the Division. The General Manager planted saplings towards green environment at Pakala Railway Station premises. The General Manager inaugurated a 5 KWp Solar Plant for Net Zero Energy Station at Rachagunneri Station and 10 KWp Solar Plant for Net Zero Energy Station at Vendodu station in the presence of Shri Somesh Kumar, Principal Chief Electrical Engineer, SCR. Shri Gajanan Mallya, General Manager, South Central Railway inspected Chandragiri Railway station, reviewed the progress of works and discussed oÂÂn further developmental plans of the station with Officials. He inaugurated a 15 KWp Solar Plant for Net Zero Energy Station at Chandragiri Railway Station. Later, he inspected Road Over Bridge (ROB) in Tirupati – Katpadi Section along with inspection of Level Crossing gate and Bridge. The General Manager inspected new crossing station and interacted with Track Maintainers at Bommasamudram Railway station.
COMMENTS
NO Comments. Be the first to Comment...
|