For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

BARH

STATION INFO

Address: Barh, Bihar, India

Station Code: BARH)BAR

Station Name: BARH)BARH

Zone: ECR/East Central

Total Unique Trains: 79

Train Frequency Weekly: 363

Station Traffic: High

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
13248KYQ CAPITAL EXP00:1500:172M,TU,W,SU1A,2A,3A,SL,GN
13246CAPITAL EXP00:1500:172TH,F,SA1A,2A,3A,SL,GN
13049AMRITSAR EXP00:3000:322M,TU,W,TH,F,SA,SU3A,SL,GN
13247RJPB CAPITAL EXP01:3001:322TU,W,TH,F1A,2A,3A,SL,GN
13245CAPITAL EXPRESS01:3601:382M,SA,SU1A,2A,3A,SL,GN
12333VIBHUTI EXPRESS02:4802:502M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13050ASR HWH EXPRESS03:1003:122M,TU,W,TH,F,SA,SU3A,SL,GN
13413FARAKKA EXPRESS03:1903:212M,TH,SA2A,3A,SL,GN
13483FARAKKA EXPRESS03:1903:212TU,W,F,SU2A,3A,SL,GN
13415MLDT PNBE EXPRES03:4403:462W,F,SU2A,3A,SL,GN
63205KIUL PNBE MEMU03:5403:562M,TU,W,TH,F,SA,SUUNRESERVED
12351HWH-RJPB EXPRES04:2804:302M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
13287SOUTH BIHAR EXP05:0305:052M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
63221MKA PNBE FAST MEMU05:5105:532M,TU,W,TH,F,SA,SUUNRESERVED
53043HWH RGD PASS06:2006:222M,TU,W,TH,F,SA,SUUNRESERVED
53520GRD LINK PAS EX06:2506:272M,TU,W,TH,F,SA,SU3A,SL,GN
53520GRD LINK PAS EX06:2506:272M,TU,W,TH,F,SA,SU3A,SL,GN
83131GRD DNR LINK06:2606:271M,TU,W,TH,F,SA,SUSL,GN
12024JANSHATABDI EXP06:2906:312M,TU,W,TH,F,SACC,2S,GN
63217MKA DNR MEMU06:4906:512M,TU,W,TH,F,SA,SUUNRESERVED
13236INTERCITY EXP06:5506:572M,TU,W,TH,F,SACC,SL,GN
13131KOAA PNBE EXP07:0407:062M,TU,W,TH,F,SA,SU3A,SL,GN
18184DNR TATA EXP07:2707:292M,TU,W,TH,F,SA,SUCC,2S,GN
12368VIKRAMSHILA EXP07:4207:442M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
63272PNBE MKA MEMU07:5207:531M,TU,W,TH,F,SA,SUUNRESERVED
13008U A TOOFAN EXP08:0108:032M,TU,W,TH,F,SA,SU3A,SL,GN
18449B NATH DHAM EXP08:0408:062M2A,3A,SL,GN
23226SHC LINK EXPRESS08:1308:152M,TU,W,TH,F,SACC,GN
13226INTERCITY EXPRES08:1308:152M,TU,W,TH,F,SACC,GN
12304POORVA EXPRESS08:4708:492W,TH,SA,SU1A,2A,3A,SL,GN
18625PRNC HTE EXPRESS08:5408:562M,TU,W,TH,F,SA,SU3A,GN
63207JAJ PNBE MEMU09:1409:162M,TU,W,TH,F,SA,SUUNRESERVED
13332PNBE DHN EXPRES09:2209:242M,TU,W,TH,F,SA2A,3A,SL,GN
18450B NATH DHAM EXP09:3309:352W2A,3A,SL,GN
13401INTERCITY EXP09:3409:362M,TU,W,TH,F,SA,SUCC,2S,GN
55527JYG PNBE PASS10:2110:232M,TU,W,TH,F,SA,SUUNRESERVED
18622PATLIPUTRA EXP10:4710:492M,TU,W,TH,F,SA,SU2A,3A,SL,GN
63208PNBE JSME MEMU10:4910:501M,TU,W,TH,F,SA,SUUNRESERVED
15646GHY LTT EXP11:0311:052W,SU2A,3A,SL,GN
15713INTERCITY EXP11:1711:192M,TU,W,TH,F,SACC,2S,GN
63209JAJ PNBE MEMU11:2811:302M,TU,W,TH,F,SA,SUUNRESERVED
13133SDAH BSB EXP11:5912:012M,TU,W,F,SA3A,SL,GN
13119SDAH ANVT EXP11:5912:012TH,SU3A,SL,GN
15648GHY LTT EXPRESS12:1412:162TU2A,3A,SL,GN
12335BGP LTT EXPRESS12:1412:162TU,F,SU2A,3A,SL,GN
63210PNBE JAJ MEMU12:5612:582M,TU,W,TH,F,SA,SUUNRESERVED
15647GUWAHATI EXPRES13:5413:562F2A,3A,SL,GN
15645GUWAHATI EXPRES13:5413:562W,SA2A,3A,SL,GN
12336BHAGALPUR EXP13:5413:562TU,TH,SU2A,3A,SL,GN
12303POORVA EXPRESS14:4814:502M,TU,F,SA1A,2A,3A,SL,GN
63212PNBE JAJ MEMU14:5614:582M,TU,W,TH,F,SA,SUUNRESERVED
13331DHN PNBE EXPRES15:0015:022M,TU,W,TH,F,SA2A,3A,SL,GN
12367VIKRAMSHILA EXP15:1315:152M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
15714INTERCITY EXP15:1415:162M,TU,W,TH,F,SACC,2S,GN
53044RGD HWH PASS15:3115:321M,TU,W,TH,F,SA,SUUNRESERVED
63271MKA PNBE MEMU16:1416:151M,TU,W,TH,F,SA,SUUNRESERVED
18621PATLIPUTRA EXP16:2616:282M,TU,W,TH,F,SA,SU2A,3A,SL,GN
18626HTE PRNC EXP16:5917:012M,TU,W,TH,F,SA,SU3A,GN
13402INTERCITY EXP17:1617:182M,TU,W,TH,F,SA,SUCC,2S,GN
18183TATA DNR EXP17:2517:272M,TU,W,TH,F,SA,SUCC,2S,GN
13120ANVT SDAH EXP17:5117:532TU,SA3A,SL,GN
13134BSB SDAH EXPRESS17:5117:532M,TU,TH,F,SA3A,SL,GN
13225INTERCITY EXPRES17:5117:532M,TU,W,TH,F,SACC,GN
23225RJPB LINK EXP17:5217:531M,TU,W,TH,F,SACC,GN
55528PNBE JYG PASS18:1218:142M,TU,W,TH,F,SA,SUUNRESERVED
13132PNBE KOAA EXPRE18:5118:532M,TU,W,TH,F,SA,SU3A,SL,GN
13007U ABHATOOFAN EXP19:1119:132M,TU,W,TH,F,SA,SU3A,SL,GN
63222PNBE MKA FAST MEMU19:1819:202M,TU,W,TH,F,SA,SUUNRESERVED
13235INTERCITY EXP20:1320:152M,TU,W,TH,F,SACC,SL,GN
63218DNR MKA DEMU20:1420:162M,TU,W,TH,F,SA,SUUNRESERVED
12023JANSHATABDI EXP20:5020:522M,TU,W,TH,F,SACC,2S,GN
13288SOUTH BIHAR EXP20:5821:002M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
63211JSME PNBE MEMU21:5822:002M,TU,W,TH,F,SA,SUUNRESERVED
12352RJPB HWH EXPRESS22:0822:102M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
13414FARKKA EXPRESS22:1922:212M,W,SA2A,3A,SL,GN
13484FARAKKA EXPRESS22:1922:212TU,TH,F,SU2A,3A,SL,GN
13416PNBE MLDT EXPRES23:0223:042M,TH,SA2A,3A,SL,GN
63206PNBE KIUL MEMU23:1223:142M,TU,W,TH,F,SA,SUUNRESERVED
12334VIBHUTI EXPRESS23:4423:462M,TU,W,TH,F,SA,SU2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
25-10-2022
North Central Railway’s takes a long leap forward entire broad gauge network becomes 100% electrified

North Central Railway’s takes a long leap forward entire broad gauge network becomes 100% electrified *

*NCR attains this feat by electrifying the last  section of NCR, Ishanagar-Udaipura of Jhansi Division*

*03 pairs of mail/express trains taken over from Diesel to Electric traction during 2022-23, further 03 more trains to run with electric traction*

*This achievement is the result of untiring efforts of team NCR: GM/NCR* 

NCR crosses the last hurdle in pursuance of Mission 100% electrification with electrification of Ishanagar-Udaipura section of Jhansi Division. This  was the last section which was due for electrification out of the NCR total Broad Gauge network of 3222 Route kilometers(RKM). North Central Railway was carrying out electrification of its all routes and of the missing links o­n war footage. Now this 76 Kms long section has also been electrified and the authorization to run  the train with electric traction has also been received. Earlier two divisions Agra and Prayagraj were 100%   electrified and with this now the entire broad gauge network of Jhansi division has also been electrified.

In 2022-23, authorization for running trains with electric traction has been received for following routes:


  1. Barhan-Etah of Prayagraj Division (59 RKM)

  2. Ishanagar-Udaipura of Jhansij Division (76 RKM)


With the electrification of entire network, now the NCR, Railway routes spanning through the parts of Uttar Pradesh,  Madhya Pradesh & Rajasthan will now be served through electrified territories.

The significance of these massive electrification works lie in the fact that it will reduce the bottleneck of change of traction when a train coming from Electric locomotive arrives in a non-electrified territory. Since the requirement of changing of traction is done away with, it increases mobility and thereby is a leap ahead in improving the punctuality of trains. In Financial Year 2022-23, 03 pairs of mail/express trains running through NCR have been taken over from diesel to electric traction after completion of major electrification works in NCR and different sections of other zones. Three more pairs of trains will be taken over o­n Electric Traction soon. 

Today o­n this occasion, GM/NCR Shri Pramod Kumar congratulated the team NCR especially the officers and staff of electrical department for attaining this feat. He said this a o­nce in life  time achievement, and it is the result of untiring efforts of a lot of known and unkown railway officers and staff. He further said the mission 100% electrification will have far reaching affect in nation’s development.   

Principal Chief Electrical Engineer NCR Shri Satish Kothari informed during the meeting  that during the inspection of newly electrified Ishanagar-Udaipur section all electrical & traction related installations, poles, OHE, TSS and all equipment were thorughly tested to operate as required. After assessing the quality of work of all the installations, speed trial was also conducted o­n the said railway section the speed of 110 kmph by special train.





2
25-10-2022
North Central Railway’s takes a long leap forward entire broad gauge network becomes 100% electrified


*North Central Railway’s takes a long leap forward entire broad gauge network becomes 100% electrified *
*NCR attains this feat by electrifying the last  section of NCR, Ishanagar-Udaipura of Jhansi Division*
*03 pairs of mail/express trains taken over from Diesel to Electric traction during 2022-23, further 03 more trains to run with electric traction*
*This achievement is the result of untiring efforts of team NCR: GM/NCR*
NCR crosses the last hurdle in pursuance of Mission 100% electrification with electrification of Ishanagar-Udaipura section of Jhansi Division. This  was the last section which was due for electrification out of the NCR total Broad Gauge network of 3222 Route kilometers(RKM). North Central Railway was carrying out electrification of its all routes and of the missing links o­n war footage. Now this 76 Kms long section has also been electrified and the authorization to run  the train with electric traction has also been received. Earlier two divisions Agra and Prayagraj were 100%   electrified and with this now the entire broad gauge network of Jhansi division has also been electrified.
In 2022-23, authorization for running trains with electric traction has been received for following routes:

1.    Barhan-Etah of Prayagraj Division (59 RKM)
2.    Ishanagar-Udaipura of Jhansij Division (76 RKM)

With the electrification of entire network, now the NCR, Railway routes spanning through the parts of Uttar Pradesh,  Madhya Pradesh & Rajasthan will now be served through electrified territories.
The significance of these massive electrification works lie in the fact that it will reduce the bottleneck of change of traction when a train coming from Electric locomotive arrives in a non-electrified territory. Since the requirement of changing of traction is done away with, it increases mobility and thereby is a leap ahead in improving the punctuality of trains. In Financial Year 2022-23, 03 pairs of mail/express trains running through NCR have been taken over from diesel to electric traction after completion of major electrification works in NCR and different sections of other zones. Three more pairs of trains will be taken over o­n Electric Traction soon.
Today o­n this occasion, GM/NCR Shri Pramod Kumar congratulated the team NCR especially the officers and staff of electrical department for attaining this feat. He said this a o­nce in life  time achievement, and it is the result of untiring efforts of a lot of known and unkown railway officers and staff. He further said the mission 100% electrification will have far reaching affect in nation’s development.   
Principal Chief Electrical Engineer NCR Shri Satish Kothari informed during the meeting  that during the inspection of newly electrified Ishanagar-Udaipur section all electrical & traction related installations, poles, OHE, TSS and all equipment were thorughly tested to operate as required. After assessing the quality of work of all the installations, speed trial was also conducted o­n the said railway section the speed of 110 kmph by special train.

*







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search