For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








64 Trains from (TLO)Talandu to (BDC)BANDEL JN


Address: Talandu - Sultangacha Road, Dist - Hooghly 712148 West Bengal

Station Code: TLO

Station Name: Talandu

Zone: ER/Eastern

Train Frequency Weekly: 7

Station Traffic: Low

Address: Bandel, West Bengal, India

Station Code: BDC

Station Name: BANDEL JN

Zone: ER/Eastern

Train Frequency Weekly: 457

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
53181LALGOLA PASSNH00:21KPA00:320:11M,TU,W,TH,F,SA,SUSL,GN,53181 Status
53050MKA HWH PASSCNS01:01CGR01:060:05M,TU,W,TH,F,SA,SUSL,2S,GN,53050 Status
53132MFP SDAH PASSNH01:43BP02:070:24M,TU,W,TH,F,SA,SUUNRESERVED53132 Status
53002AZ HWH PASSCNS02:20CGR02:250:05M,TU,W,TH,F,SA,SUUNRESERVED53002 Status
53172LGL SDAH PASSSMX02:38KYI02:500:12M,TU,W,TH,F,SA,SUFC,SL,GN,53172 Status
13138AMH KOAA EXPNH02:40BP02:550:15TU2A,3A,SL,GN,13138 Status
13022MITHILA EXPRESSCGR02:54SHE03:090:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13022 Status
13034KIR HWH EXPRESSCNS03:01SHE03:150:14M,TU,W,TH,F,SA,SUSL,GN,13034 Status
53171SDAH LGL PASSNH04:38KPA04:490:11M,TU,W,TH,F,SA,SUUNRESERVED53171 Status
13010DOON EXPRESSCGR05:54SRP06:070:13M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13010 Status
73151SDAH JRLE DEMUNH06:28BDC06:540:26M,TU,W,TH,F,SAUNRESERVED73151 Status
53520GRD LINK PAS EXNH06:30BDC05:560:34M,TU,W,TH,F,SA,SU3A,SL,GN,53520 Status
53131SDAH MFP FAST PGRNH07:05BDC07:350:30M,TU,W,TH,F,SA,SUUNRESERVED53131 Status
53041HWH JYG PGRCGR08:01BDC08:230:22M,TU,W,TH,F,SA,SUUNRESERVED53041 Status
13187SDAH RPH EXPNH08:14BDC08:380:24M,TU,W,TH,F,SA,SUCC,2S,GN,13187 Status
63108LGL SDAH MEMU PASSSMX08:30KYI08:420:12M,TU,W,TH,F,SA,SUUNRESERVED63108 Status
53173SDAH LGL PASSNH09:03KPA09:120:09M,TU,W,TH,F,SA,SUUNRESERVED53173 Status
53048VISWABHARTI PASSCNS09:11CGR09:180:07M,TU,W,TH,F,SA,SUCC,2S,GN,53048 Status
12384INTERCITY EXPNH09:49BP10:050:16M,TU,W,TH,F,SA2S,GN,12384 Status
53044RGD HWH PASSCNS10:57CGR11:020:05M,TU,W,TH,F,SA,SUUNRESERVED53044 Status
53183SDAH LGL PASSNH11:22KPA11:300:08M,TU,W,TH,F,SA,SUUNRESERVED53183 Status
63106BPC SDAH MEMUKYI11:28KPA11:320:04M,TU,W,TH,F,SA,SUUNRESERVED63106 Status
53176LGL SDAH PASSKYI11:29KPA11:340:05M,TU,W,TH,F,SA,SUUNRESERVED53176 Status
53043HWH RGD PASSCGR11:57BDC12:100:13M,TU,W,TH,F,SA,SUUNRESERVED53043 Status
13137KOAA AMH EXPRESSNH12:25BDC12:500:25M2A,3A,SL,GN,13137 Status
19607AII WKLY EXPNH12:27BDC12:500:23TH2A,3A,SL,GN,19607 Status
53140JSME KOAA PGSNH12:40BP12:560:16M,TU,W,TH,F,SA,SUSL,GN,53140 Status
63141SDAH RPH PASSNH13:03BDC13:210:18M,TU,W,TH,F,SA,SUUNRESERVED63141 Status
53175SDAH LGL PGRNH13:37KPA13:470:10M,TU,W,TH,F,SA,SU2S,GN,53175 Status
53178LGL SDAH PASSKYI13:42KPA13:470:05M,TU,W,TH,F,SA,SU2S,GN,53178 Status
13105SDAH BUI EXPRESNH14:08BDC14:300:22M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13105 Status
13050ASR HWH EXPRESSCNS14:29CGR14:340:05M,TU,W,TH,F,SA,SU3A,SL,GN,13050 Status
13141TESTA TORSA EXPNH14:32BDC14:530:21M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13141 Status
13049AMRITSAR EXPCGR14:41BDC15:060:25M,TU,W,TH,F,SA,SU3A,SL,GN,13049 Status
53179KOAA LGL PASSNH14:53KPA15:030:10M,TU,W,TH,F,SA,SUUNRESERVED53179 Status
63104LGL SDAH MEMUKYI15:08KPA15:100:02M,TU,W,TH,F,SA,SUUNRESERVED63104 Status
15047PURBANCHAL EXPNH15:24BDC15:450:21M,TU,TH,SA2A,3A,SL,GN,15047 Status
15051KOAA GKP EXPNH15:24BDC15:450:21F2A,3A,SL,GN,15051 Status
15049KOAA GKP EXPNH15:24BDC15:450:21W,SU2A,3A,SL,GN,15049 Status
63142RPH SDAH PASSPDA16:11BDC16:380:27M,TU,W,TH,F,SA,SUUNRESERVED63142 Status
13021MITHILA EXPRESSCGR16:36BDC16:490:13M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13021 Status
53047VISWAVARATI PASSCGR17:14BDC17:290:15M,TU,W,TH,F,SA,SUCC,2S,GN,53047 Status
53177SDAH LGL PASSNH17:33KPA17:420:09M,TU,W,TH,F,SA,SUUNRESERVED53177 Status
12383INTERCITY EXPNH17:51BDC18:110:20M,TU,W,TH,F,SA2S,GN,12383 Status
53180LGL KOAA PASSSMX18:38KYI18:500:12M,TU,W,TH,F,SA,SUUNRESERVED53180 Status
13185GANGASAGAR EXPNH18:44BDC19:070:23M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13185 Status
73152JRLE SDAH DEMUNH19:17BP19:360:19M,TU,W,TH,F,SAUNRESERVED73152 Status
63103SDAH LGL MEMUNH20:27KPA20:340:07M,TU,W,TH,F,SA,SUUNRESERVED63103 Status
13145RADHIKAPUR EXPNH20:30BDC20:520:22M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13145 Status
13131KOAA PNBE EXPNH20:45BDC21:060:21M,TU,W,TH,F,SA,SU3A,SL,GN,13131 Status
13169HATE BAZARE EXPNH20:59BDC21:220:23TU,TH2A,3A,SL,GN,13169 Status
13163HATE BAZARE EXPNH21:01BDC21:250:24M,W,F,SA,SU2A,3A,SL,GN,13163 Status
13009DOON EXPRESSCGR21:09BDC21:180:09M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13009 Status
63105SDAH LGL MEMUNH21:16KPA21:270:11M,TU,W,TH,F,SA,SUUNRESERVED63105 Status
53182LGL SDAH PASSSMX21:24KYI21:340:10M,TU,W,TH,F,SA,SUUNRESERVED53182 Status
13135KOAA JYG EXPNH21:45BDC22:150:30SA2A,3A,SL,GN,13135 Status
37279HWH BDC LOCALCGR21:54BDC22:100:16M,TU,W,TH,F,SA,SUUNRESERVED37279 Status
13033HWH KIR EXPRESSCNS22:06BDC22:160:10M,TU,W,TH,F,SA,SUSL,GN,13033 Status
53042JYG HWH PASSCNS22:06CGR22:110:05M,TU,W,TH,F,SA,SUUNRESERVED53042 Status
53184LGL SDAH PASSKYI22:12KPA22:160:04M,TU,W,TH,F,SA,SUUNRESERVED53184 Status
37290BDC HWH LOCALCNS22:50CGR22:520:02M,TU,W,TH,F,SA,SUUNRESERVED37290 Status
13153GOUR EXPRESSNH23:13BDC23:400:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,13153 Status
53139KOAA JSME PGSNH23:35BDC00:030:28M,TU,W,TH,F,SA,SUSL,GN,53139 Status
53049HWH MKA PASCGR23:54BDC00:140:20M,TU,W,TH,F,SA,SUSL,2S,GN,53049 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
09-06-2015
Press Release : HON’BLE MINISTER FOR RAILWAYS INAUGURATED A NUMBER OF PASSENGER AMENITY PROJECTS, DEDICATED DOUBLING PROJECTS AT DR. B C ROY AUDITORIUM, SEALDAH, KOLKATA

                            


HON’BLE MINISTER FOR RAILWAYS INAUGURATED A NUMBER OF PASSENGER AMENITY PROJECTS, DEDICATED DOUBLING PROJECTS

AT DR. B C ROY AUDITORIUM, SEALDAH, KOLKATA

Kolkata, June 6, 2015 

          Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways inaugurated a number of passenger amenity projects, dedicated doubling projects, laid the foundation stone of some important projects of eastern & south eastern railway and flagged off new train services at Dr. B C Roy Auditorium, Sealdah, Kolkata. 

          This morning Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways inaugurated PRS & UTS pre-printed ticket printing machine at Howrah Printing Press, a Sports Complex at Kanchrapara, True Colour Display for passenger information system at Sealdah Main station and Wi-Fi facility at Howrah station of Eastern Railway and Hijli station building of South Eastern Railway. 

          He also dedicated Dakshin Barasat – Mathurapur, Dainhat – Purbasthali, Dhatrigram – Ambika Kalna, Dhatrigram – Purbasthali, Nalhati – Moregram, Phulia – Kalinarayanpur, Bhagwangola – Jiaganj, Krishnanagar – Plassey, Poradanga – Monigram, Tinpahar – Maharajpur & Sahibganj – Pirpainti double lines a total of 219.43 kms o­n Eastern Railway and  3rd line between Shyamchak and Kharaghpur and Tamluk & Basulyasutahata doubling, a total of 33.9 km o­n South Eastern Railway. 

          He laid the foundation stone of Kharaghpur – Narayangarh 3rd line and Andul – Baltikuri doubling o­n South Eastern Railway. 

          o­n the same occasion, the Hon’ble Minister also flagged off four new EMU services viz. Sonarpur – Mathurapur Road, Mathurapur Road – Baruipur, Baruipur – Diamond Harbour and Diamond Harbour – Sonarpur of Sealdah Division. 

          All these programmes were done through remote from the Dr. B C Roy Auditorium, Sealdah. Later, Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways addressed the press and media persons of Kolkata. He briefed the press o­n the progress of 129 o­ngoing Railway projects in West Bengal covering a total length of 3282 kms at a cost of Rs.26381 crores. Out of these, 30 projects have already been commissioned covering a length of 860 kms at a cost of Rs.2177 crores. Out of total of 69 new line construction projects covering 1809 kms at a cost of Rs.13213 crores, 5 projects have been commissioned covering a total length of 260 kms at a cost of Rs.1086 crores. In gauge conversion also out of 6 projects, 2 projects have been commissioned covering a length of 136 kms at a cost of Rs.524 crores. In doubling, out of 54 projects, 23 projects have been commissioned with a total length of 464 kms at a cost of Rs.567 crores. Allotment of fund has been enhanced this considerably in comparison to previous year. 165 kms of double line projects have been completed in West Bengal last year. The entire section from Bandel to Katwa (105 kms) has been doubled. An important link between Rampurhat & Dumka has been commissioned o­n 4th June, 2015 linking Bengal’s holy place of Tarapith with the holy place of Deoghar by shortening the distance by 96 kms.         

          Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways said that all projects in West Bengal will be taken up in consultation with the State Government o­n prioritizing the projects with the availability of funds. He sought cooperation from the State Government for improving the Railway services in the state of West Bengal. 

          Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways also informed the press about the development and achievements of the Govt. of India in respect of various activities which covers ensuring dignity of labour, mainstreaming the deprived, pride of farmers welfare projects, financial security for the poor i.e. Pradhan Mantri Jan Dhan Yojna, social security for the poor etc. He informed that the work taken up by various ministries under the leadership of Hon’ble Prime Minister for the last o­ne year. The ‘Make in India’ & ‘Swachh Bharat Mission’ will take the country forward for a better tomorrow. 

          In the afternoon, Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways also had discussions with the members of Merchant Chamber of Commerce about the Railway facilities available in West Bengal. He sought cooperation from the Chamber and appealed them to contribute towards the Corporate Social Responsibility (CSR) projects of Railways. He asked the Chamber to adopt some stations and enhance the passenger amenities for the benefit of rail users.






2
09-06-2015
Press Release: GM/ER FLAGGED OFF STATE-OF-THE-ART NEW 12-COACH EMU RAKE AT HOWRAH STATION


                                    


GM/ER FLAGGED OFF STATE-OF-THE-ART

NEW 12-COACH EMU RAKE AT HOWRAH STATION

Kolkata, June 8, 2015:

Shri R. K. Gupta, General Manager, Eastern Railway flagged off state-of-the-art new 12-coach EMU rake of Howrah – Bandel local at Howrah station this morning.

The salient features of this state-of-the-art new 12-coach EMU rake is as follows:

·Ergonomically designed injection molded poly carbonate fire retardant seats for better ambience & passenger comfort.

·Extensive use of Fiber Reinforced Plastic (FRP) panels in interiors to give pleasant ambience for the passengers.

·Electronic Head Code for display of Train No. & Destination.

·Public announcement system available.

·65W, 450 mm. sweep fans for better air flow.

·Light diffusers used inside the coach light to give improved lighting & pleasant experience.

·14 luggage racks in Motor coach and 18 luggage racks in Trailer coaches.

·Bigger window of size 1770 mm. x 870 mm.

·Air spring in secondary suspension for better riding quality. ·

·Skid proof chequered sheet flooring.

·Stainless steel grab handles & Grab poles.

DRIVING CREW CONVENIENCE:

·Driver desk area has been ergonomically designed to minimize driver’s fatigue.

·24” wide sunvisor has been provided o­n Guard & Driver side for sun light protection.

DESIGN AND SAFETY FEATURES:

·Side wall skin with special dull finish stainless steel sheet to avoid periodic paintings of side wall exterior.

·Aero dynamically designed FRP cab and cab skirt in motor coach which provides modern aesthetic appeal to the coach. ·

·Maximum use of Fire retardant FRP panels.

·Seating Capacity of 1228 passengers for 12 car rake.

·Max permissible speed 100 Kmph.

With the introduction of this rake, the journey of the local passengers will improve further in respect of comfort and safety. The design and the safety features have been done with most significantly to help the passengers to get more comfort.







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit