For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








69 Trains from (AKV)ANKLESHWAR JN to (TNA)THANE


Address: Ankleshwar Railway Station, Ankleshwar, Gujarat 393001, India

Station Code: AKV

Station Name: ANKLESHWAR JN

Zone: WR/Western

Train Frequency Weekly: 339

Station Traffic: High

Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19218SAU JANATA EXPKSB00:08BVI04:474:39M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19218 Status
22928LOK SHAKTI EXPKSB00:35BVI04:584:23M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22928 Status
12962AVANTIKA EXPBH00:43BVI05:044:21M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12962 Status
12902GUJARAT MAILBH01:02BVI05:064:04M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12902 Status
19708ARAVALI EXPRESSBH01:18BVI05:384:20M,TU,W,TH,F,SA,SU2A,3A,SL,2S,GN,19708 Status
19042GCT BDTS EXPBH01:27BVI07:025:35TU,SU2A,3A,SL,GN,19042 Status
22946SAURASHTRA MAILBH01:41BVI06:024:21M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22946 Status
19570VRL MMCT EXPBH01:41BVI06:054:24M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19570 Status
22964BVC BDTS SF EXPBH02:10BVI06:544:44SU2A,3A,SL,GN,22964 Status
22934JP BDTS SF EXPBH02:27BVI06:544:27TU2A,3A,SL,GN,22934 Status
19022LJN BDTS EXPBH02:27BVI07:134:46SU2A,3A,SL,GN,19022 Status
12956JP MMCT SUPFASTAKV02:42BVI06:403:58M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12956 Status
09022JAT BDTS AC SPLBH03:22BVI09:246:02W2A,3A,CC,GN,09022 Status
14707RANAKPUR EXPRESBH03:42BVI08:465:04M,TU,W,TH,F,SA,SU2A,3A,SL,2S,GN,14707 Status
12215DEE BDTS G RATHBH03:59BVI07:163:17M,TU,TH,SA3A12215 Status
22452CDG BDTS SF EXPBH04:11BVI08:264:15W,SU2A,3A,SL,GN,22452 Status
22924BDTS HUMSAFARBH04:52BVI09:214:29TU,TH,SU3A22924 Status
59440AHMADABAD PASSKSB05:08BVI14:008:52M,TU,W,TH,F,SA,SUSL,GN,59440 Status
12954AG KRANTI RJDHNBH05:10BVI08:543:44M,TU,W,TH,F,SA,SU1A,2A,3A,12954 Status
04817BGKT BDTS SPLBH05:27BVI11:075:40W,SU2A,3A,SL,GN,04817 Status
22956KUTCH EXPRESSBH05:52BVI10:374:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22956 Status
12479SURYA NAGRI EXPAKV06:48BVI10:453:57M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12479 Status
12934KARNAVATI EXPBH07:37BVI11:464:09M,TU,W,TH,F,SA,SUCC,2S,GN,12934 Status
22473BKN BDTS SF EXPBH07:52BVI11:564:04M2A,3A,SL,2S,GN,22473 Status
12990AII DDR EXPRESSBH07:52BVI11:564:04W,F,SU2A,3A,SL,GN,12990 Status
20902AII BDTS LINK SFBH08:24BVI12:464:22W,F,SU2A,3A,SL,GN,20902 Status
22902UDZ BDTS SUPBH08:24BVI12:464:22W,F,SU2A,3A,SL,GN,22902 Status
12932MMCT DOUBLEDECKEBH08:34BVI12:133:39M,TU,W,TH,F,SACC12932 Status
12996UDZ BDTS SF EXPBH09:02BVI13:264:24TU,TH,SA2A,3A,SL,GN,12996 Status
22996AII BDTS SF EXPBH09:02BVI13:264:24TU,TH,SA2A,3A,SL,GN,22996 Status
19116BHUJ DDR EXPKSB09:17BVI13:073:50M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19116 Status
22926PASCHIM EXPRESSBH09:18BVI13:554:37M,TU,W,TH,F,SA,SU2A,3A,SL,GN,22926 Status
12926PASCHIM EXPRESSBH09:22BVI13:544:32M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12926 Status
22954GUJARAT EXPRESSKSB10:30BVI14:594:29M,TU,W,TH,F,SA,SUCC,2S,GN,22954 Status
19016SAURASHTRA EXPKSB11:29BVI18:036:34M,TU,W,TH,F,SA,SU3A,SL,GN,19016 Status
22916HSR BDTS S F EXPBH12:15BVI16:053:50TU2A,3A,SL,GN,22916 Status
11103JHS BDTS EXPBH12:15BVI16:053:50M,SU3A,SL,GN,11103 Status
22950DEE BDTS SF EXPBH12:15BVI16:053:50TH2A,3A,SL,GN,22950 Status
11803JHS BDTS EXPBH12:22BVI16:053:43SU2A,3A,SL,GN,11803 Status
19024FZR MMCT JANTAKSB12:26BVI18:396:13M,TU,W,TH,F,SA,SUSL,GN,19024 Status
22932JSM BDTS SFBH12:27BVI16:444:17SA2A,3A,SL,GN,22932 Status
19568VIVEK EXPRESSBH12:58KYN19:426:44TH2A,3A,SL,GN,19568 Status
19202PBR SC EXPRESSAKV13:05BIRD18:535:48TU2A,3A,SL,GN,19202 Status
12472SWARAJ EXPRESSBH13:06BVI17:154:09TU,W,F,SA2A,3A,SL,GN,12472 Status
16613COIMBATORE EXPAKV13:26BIRD18:535:27SU2A,3A,SL,GN,16613 Status
17017RJT SC EXPRESSAKV13:26BIRD18:535:27M,W,TH2A,3A,SL,GN,17017 Status
16333VRL TVC EXPRESSAKV16:03BIRD21:065:03TH2A,3A,SL,GN,16333 Status
16335NAGERCOIL EXPAKV16:03BIRD21:065:03F2A,3A,SL,GN,16335 Status
16337OKHA ERS EXPAKV16:03BIRD21:065:03M,SA2A,3A,SL,GN,16337 Status
22918HW BDTS SF EXPBH16:08BVI21:125:04TH2A,3A,SL,GN,22918 Status
19062RMR BDTS EXPBH16:42BVI21:174:35F2A,3A,SL,GN,19062 Status
12010SHATABDI EXPBH17:07BVI20:323:25M,TU,W,TH,F,SA1A,CC,12010 Status
22443CNB BDTS SFBH17:32BVI22:234:51W2A,3A,SL,GN,22443 Status
16588BKN YPR EXPRESSAKV17:33KYN22:365:03TU,SU2A,3A,SL,GN,16588 Status
14806BME YPR AC EXPAKV17:33KYN22:425:09F1A,2A,3A,14806 Status
16209AII MYS EXPRESSBH17:47BIRD00:086:21F,SU2A,3A,SL,GN,16209 Status
16505GIMB SBC EXPRESSAKV17:56BIRD00:086:12TU2A,3A,SL,GN,16505 Status
16507JU SBC EXPBH18:04BIRD00:086:04TH,SA1A,2A,3A,SL,GN,16507 Status
11095AHIMSA EXPRESSBH19:00BIRD00:535:53TH1A,2A,3A,SL,GN,11095 Status
11091BHUJ PUNE EXPBH19:00BIRD00:535:53W1A,2A,3A,SL,GN,11091 Status
11089BGKTPUNE EXPRESSBH19:03BIRD00:535:50TU1A,2A,3A,SL,GN,11089 Status
59442AHMEDABAD PASSKSB19:39BVI03:207:41M,TU,W,TH,F,SA,SU2A,SL,GN,59442 Status
11087VERAVAL PUNE EXPBH19:43BIRD00:535:10SA1A,2A,3A,SL,GN,11087 Status
19020DEHRADUN EXPKSB21:30BVI03:275:57M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19020 Status
19040AVADH EXPRESSAKV22:05BVI03:385:33TU,TH,SU2A,3A,SL,GN,19040 Status
19038AVADH EXPRESSAKV22:10BVI03:355:25M,W,F,SA2A,3A,SL,GN,19038 Status
11049KOLHAPUR EXPRESSBH22:11BIRD03:535:42SU2A,3A,SL,GN,11049 Status
22497TPJ HUMSAFAR SUPBH22:54KYN04:475:53TU3A22497 Status
12928VADODARA EXPBH23:20BVI03:424:22M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12928 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit