For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








37 Trains from (lko)lucknow nr to (MSV)Mustara


Address: Lucknow Railway Station, Kanpur Road, Railway Colony, Charbagh, Lucknow, Uttar Pradesh, India

Station Code: LKO

Station Name: LUCKNOW NR

Zone: NR/Northern

Train Frequency Weekly: 860

Station Traffic: High

Address: Mastara Railway Station, Burha, 284128 Uttar Pradesh

Station Code: MSV

Station Name: Mustara

Zone: NCR/North Central

Train Frequency Weekly: 25

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11016KUSHINAGAR EXPBNZ00:18JHS06:306:12M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11016 Status
59386PANCHVALLEY PALKO01:55JHS12:1013:45M,TU,W,TH,F,SA,SUFC,3A,SL,GN,59386 Status
12144SLN LTT SFLKO02:35JHS09:507:15M2A,3A,SL,GN,12144 Status
12541GKP LTT SUP EXPBNZ03:00JHS09:306:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12541 Status
15101JANSADHARAN EXPBNZ05:30JHS11:456:15TUUNRESERVED15101 Status
12174UDYOG NAGRI EXPLKO05:50JHS11:405:50TU,TH2A,3A,SL,GN,12174 Status
12104LJN PUNE EXPLJN06:30JHS11:455:15SU1A,2A,3A,SL,GN,12104 Status
11408LJN PUNE EXPLJN06:30JHS13:106:40TH2A,3A,SL,GN,11408 Status
15045GKP OKHA EXPRESBNZ09:38JHS21:2011:42TH2A,3A,SL,GN,15045 Status
19054MFP ST EXPRESSLKO10:30JHS21:2010:50SU3A,SL,GN,19054 Status
15015GKP YPR EXPRESSBNZ11:04JHS16:455:41M2A,3A,SL,GN,15015 Status
12589GKP SC EXPRESSBNZ11:04JHS16:455:41W2A,3A,SL,GN,12589 Status
12591GKP YPR EXPRESSBNZ11:04JHS16:455:41SA2A,3A,SL,GN,12591 Status
12511RAPTI SAGAR EXPBNZ11:04JHS16:455:41TH,F,SU2A,3A,SL,GN,12511 Status
12521RAPTI SAGAR EXPBNZ11:04JHS16:455:41M1A,2A,3A,SL,GN,12521 Status
11123BJU GWL MAILLKO11:55JHS18:256:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11123 Status
19306KYQ INDB EXPLKO12:10JHS18:556:45SU2A,3A,SL,GN,19306 Status
12597GKP CSTM JANSADHARANLKO13:35JHS18:555:20TUUNRESERVED12597 Status
15067GKP BDTS EXPLKO14:20JHS20:105:50W2A,3A,SL,GN,15067 Status
15065GKP PNVL EXPLKO14:20JHS20:105:50TU,TH,F,SU2A,3A,SL,GN,15065 Status
15063GKP LTT EXPLKO14:20JHS20:105:50M2A,3A,SL,GN,15063 Status
11080GKP LTT EXPRESSLKO14:20JHS20:105:50SA2A,3A,SL,GN,11080 Status
15023GKP YPR EXPLKO16:10JHS21:355:25TU2A,3A,SL,GN,15023 Status
22122LKO LTT AC EXPLKO16:10JHS21:455:35SU1A,2A,3A,22122 Status
16094LJN MAS EXPLJN16:20JHS21:455:25M,TH2A,3A,SL,GN,16094 Status
51814LKO JHS PASSLKO16:30JHS00:257:55M,TU,W,TH,F,SA,SUUNRESERVED51814 Status
11110LJN JHS INT EXPLJN16:40JHS22:355:55M,TU,W,TH,F,SA,SUCC,2S,GN,11110 Status
12533PUSHPAK EXPLJN19:45JHS01:305:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12533 Status
09014LJN MMCT SPLLJN22:35JHS03:355:00F2A,3A,SL,GN,09014 Status
12108LJN LTT EXPRESSSLJN22:45JHS03:354:50TU,TH,SU2A,3A,SL,GN,12108 Status
19314INDORE EXPRESSLKO22:45JHS04:255:40W,F2A,3A,SL,GN,19314 Status
12184PBH BPL EXPRESSLKO22:45JHS03:254:40M,W,SA2A,3A,SL,GN,12184 Status
12593LJN BPL G RATHLJN22:45JHS04:255:40SA3A12593 Status
19322RJPB INDB EXPRESLKO22:55JHS04:355:40M2A,3A,SL,GN,19322 Status
15029GKP PUNE EXPLKO22:55JHS04:255:30TH2A,3A,SL,GN,15029 Status
19168SABARMATI EXPLKO23:15JHS05:306:15TU,TH,F,SU2A,3A,SL,GN,19168 Status
19166SABARMATI EXPLKO23:15JHS05:306:15M,W,SA2A,3A,SL,GN,19166 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.832/2021-2204-04-2022
secunderabad
PR No. 832 - 26 Summer Special Trains between Hyderabad - Gorakhpur

  


In order to clear extra rush during summer season, South Central Railway will run 26 summer special trains between Hyderabad – Gorakhpur - Hyderabad as detailed below:

 

Sl. No

Train No

From - To

Dep.

Arrival

JCO

1

02575

Hyderabad - Gorakhpur

21.05 hrs

(Friday)

06.30 hrs

(Sunday)

1st. 8th, 15th, 22nd, 29th April, 6th, 13th, 20th, 27th May, 3rd, 10th, 17th, 24th June, 2022

2

02576

Gorakhpur - Hyderabad

08.30 hrs

(Sunday)

16.20 hrs

(Monday)

3rd. 10th, 17th, 24th April, 1st, 8th, 15th, 22nd, 29th May, 5th, 12th, 19th, 26th June, 2022

 

I.Train No. 02575/02576 Hyderabad – Gorakhpur – Hyderabad special train : (26 services)

These Special Trains will stop at Secunderabad, Kazipet, Peddapalli, Mancherial, Balharshah, Nagpur, Itarsi, Bhopal, Bina, Virangana Lakhshmibai, Orai, Pokhrayan, Kanpur,Aishbagh, Lucknow City, Barabanki Station and Gonda Railway stations in both the directions (Note: Train No.02575 will not stop at Barabanki Station) .

            These tarins consist of AC II tier, AC III tier and Sleeper class coaches





2
03-03-2022
Annual GM inspection of Jhansi Division concluded General Manager North Central Railway Shri Pramod Kumar inspected Bhimsen-Veerangana Laxmibai section of Jhansi Division

                                  à¤‰à¤¤à¥â€à¤¤à¤° मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

  à¤‰à¤¤à¥â€à¤¤à¤° मध्‍य  à¤°à¥‡à¤²à¤µà¥‡à¤ªà¥à¤°à¤¯à¤¾à¤—राज

पत्रांक: 11पीआर/02/2022                                 à¤ªà¥à¤°à¥‡à¤¸ विज्ञप्ति                     à¤¦à¤¿à¤¨à¤¾à¤‚क : 23.02.2022

Annual GM inspection of Jhansi Division concluded

General Manager North Central Railway Shri Pramod Kumar inspected Bhimsen-Veerangana Laxmibai section of Jhansi Division

Today, o­n 23.02.2022, General Manager North Central Railway Shri Pramod Kumar along with the team of Principal Heads of North Central Railway Headquarters conducted annual inspection of Jhansi Division. This inspection started in the morning and continued till late evening. During this, the Bhimsen-Veerangana Laxmibai section of the division was inspected. Starting from Bhimsen, the track was inspected from the rear window of the inspection caariage. Major Curves, Bridges, Level Crossing, Gang, four stations (Pokhrayan, Orai, Ait and Mustara) yards, Turn Out, Long weilded rail, SEJ, USFD team, speed trials etc. were thoroughly inspected during the day.

In the morning, the General Manager interacted with trackmen at Kanpur station who put forth their service related issues. Departing from Kanpur Central, the General Manager made first stop over between Bhimsen and Rasulpur Gogamu to inspect a minor bridge there.

GM further inspected the non-interlocked engineering level crossing gate number 207C located between Malasa and Pokhraya. Local villagers at the gate met the GM and demanded opening of the gate at regular intervals for passing road traffic.

Deviating from the schedule of the inspection plan, General Manager made a surprise stop over at Pokhrayan station. There he inspected the waiting rooms, retiring rooms, catering units and water vending units etc. and gave necessary instructions for improvements in the standards of passenger amenities. General Manager also interacted with the local public present at Pokhrayan station and took feedback about the existing facilities.

Departing from Pokhrayan. He examined the riding quality and other safety issues o­n the long welded rail and SEJ located between the traffic level crossing gate number 205 and the section.

 During the inspection of Orai station, the General Manager saw the passenger facilities, waiting room, circulating area, railway yard, points, catering units, health unit, relay room, RPF post, CCTV room, OHE depot along with intensive inspection of GRP post etc.

Shri Kumar hold a brief meeting with the officials present regarding the development works being done by the Railways in the Orai-Jalaun area. A technical exhibition of the Carriage and Wagon Department at Orai station was visited by the General Manager. The working model of Vande Bharat, live demo of water recycling plant, model of bio toilet and quick watering system besides working equipments of carriage and wagon were demonstrated in the exhibition. The HRMS Help Desk set up by the Personnel Department for the benefit of Railway employees was also inaugurated. Through this desk, staff will be able to find solutions to their problems related to HRMS in Orai itself.

The General Manager interacted with the representatives of the Vyapar Mandal and the media in Orai. While talking to the media, he discussed the development and doubling of Kanpur - Jhansi (Veerangana Laxmi Bai) section. He said that during the annual inspection, along with the review of development works, the methods of working of the staff is thoroughly checked and they are counselled accordingly. Shri Kumar also answered media queries regarding Kisan Rail, stoppage of trains &  solar panel etc.

General Manager did a comprehensive inspection of the arrangements for passenger facilities, running rooms and newly constructed station building etc. at the Ait station.

General Manager tested the riding quality of the track by conducting speed trials at a speed of 120 kmph between Ait-Mustara (80 km).

On reaching Mustara station, he inspected the traction sub-station and engineering gang number 02 and talked to them. After that, Shri Kumar inspected the curve number 02 and gang number 01 between Mustara-Jhansi, km 1132-1134.

General Manager, North Central Railway interacted with the trackmen and other railway personnel and checked their knowledge about their work and responsibilities. He obtained information regarding the welfare of the staff and directed the concerned officers of the section to pay special attention to the welfare of the employees.

During the inspection, different teams of officers were formed which were assigned specific tasks. While PCSO Shri M.K. Gupta led the team which inspected points and crossing, PCOM Shri Biplav Kumar led the team which inspected station records. PCCM S.Kapil, DRM Shri Ashutosh and PCE Shri S.K.Mishra remained with the GM during inspection while IG RPF Shri Ravindra Verma inspected the security installations.

After the completion of the inspection, he talked to the recognized trade union, organization, chamber of commerce, ZRUCC member etc. in the Divisional Railway Manager's office.

                                                                          





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit