For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








37 Trains from (MSV)Mustara to (lko)lucknow nr


Address: Mastara Railway Station, Burha, 284128 Uttar Pradesh

Station Code: MSV

Station Name: Mustara

Zone: NCR/North Central

Train Frequency Weekly: 25

Station Traffic: Low

Address: Lucknow Railway Station, Kanpur Road, Railway Colony, Charbagh, Lucknow, Uttar Pradesh, India

Station Code: LKO

Station Name: LUCKNOW NR

Zone: NR/Northern

Train Frequency Weekly: 860

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15016YPR GORAKPUR EXPJHS00:15ASH07:407:25TH2A,3A,SL,GN,15016 Status
15068BDTS GKP EXPJHS00:40LKO09:258:45F2A,3A,SL,GN,15068 Status
12534PUSHPAK EXPRESSJHS02:10LJN08:406:30M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12534 Status
15046GORAKHPUR EXPJHS03:15ASH13:3710:22SU2A,3A,SL,GN,15046 Status
19053ST MFP EXPRESSJHS03:15LKO13:4510:30F3A,SL,GN,19053 Status
51813JHS LKO PASSPIC03:20LKO12:309:10M,TU,W,TH,F,SA,SUUNRESERVED51813 Status
12594LJN GARIB RATHJHS03:25LJN09:456:20SU3A12594 Status
12592GORAKHPUR EXPJHS04:28ASH09:485:20M2A,3A,SL,GN,12592 Status
12590GORAKHPUR EXPJHS04:28ASH09:485:20F2A,3A,SL,GN,12590 Status
12522RAPTISAGAR EXPJHS04:28ASH09:485:20F2A,3A,SL,GN,12522 Status
12512RAPTISAGAR EXPJHS04:28ASH09:485:20TU,W,SU2A,3A,SL,GN,12512 Status
12542LTT GKP SUP EXPJHS05:25ASH11:256:00M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12542 Status
11109JHS LJN INT EXPJHS06:15LJN12:055:50M,TU,W,TH,F,SA,SUCC,2S,GN,11109 Status
12598CSTM GKP JANSADHARANJHS07:35LKO13:055:30WUNRESERVED12598 Status
22121LKO AC SUP EXPJHS07:35LKO13:456:10SA1A,2A,3A,22121 Status
15024YPR GKP EXPJHS07:45LKO13:055:20TH2A,3A,SL,GN,15024 Status
15030PUNE GKP EXPRESSJHS08:55LKO14:556:00SA2A,3A,SL,GN,15030 Status
12107LUCKNOW SUP EXPJHS09:35LJN15:105:35M,W,SA2A,3A,SL,GN,12107 Status
12173UDYOG NAGRI EXPJHS09:35LKO14:555:20TU,SU2A,3A,SL,GN,12173 Status
12103PA LUCKNOW EXPJHS11:12LJN17:105:58F1A,2A,3A,SL,GN,12103 Status
11079LTT GKP EXPRESSJHS11:15LKO17:156:00TH2A,3A,SL,GN,11079 Status
12143LTT SLN SUP EXPJHS11:45LKO17:155:30SU2A,3A,SL,GN,12143 Status
15102JANSADHARAN EXPJHS11:45ASH19:157:30FUNRESERVED15102 Status
15064LTT GKP EXPRESSJHS13:00LKO19:306:30TU2A,3A,SL,GN,15064 Status
15066PNVL GKP EXPRESSJHS13:00LKO19:306:30M,W,F,SA2A,3A,SL,GN,15066 Status
11124GWL BJU MAILJHS13:55LKO20:156:20M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11124 Status
16093LUCKNOW EXPJHS14:55LJN20:405:45TU,SA3A,SL,GN,16093 Status
09013MMCT LJN SF SPLJHS15:05LJN20:405:35TH2A,3A,SL,GN,09013 Status
19165SABARMATI EXPJHS17:40LKO00:507:10W,F,SU2A,3A,SL,GN,19165 Status
19167SABARMATI EXPJHS17:40LKO00:507:10M,TU,TH,SA2A,3A,SL,GN,19167 Status
11015KUSHINAGAR EXPJHS18:50ASH01:426:52M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11015 Status
11407PUNE LJN EXPRESSJHS19:20LJN02:307:10TU2A,3A,SL,GN,11407 Status
59386PANCHVALLEY PAJHS19:22LKO01:456:23M,TU,W,TH,F,SA,SUFC,3A,SL,GN,59386 Status
19305INDB GHY EXPJHS23:22LKO05:256:03TH2A,3A,SL,GN,19305 Status
12183BPL PBH SUP EXPJHS23:22LKO05:256:03TU,F,SU2A,3A,SL,GN,12183 Status
19313INDB RJPB EXPJHS23:22LKO05:306:08M,W2A,3A,SL,GN,19313 Status
19321INDB RJPB EXPJHS23:22LKO05:256:03SA2A,3A,SL,GN,19321 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.832/2021-2204-04-2022
secunderabad
PR No. 832 - 26 Summer Special Trains between Hyderabad - Gorakhpur

  


In order to clear extra rush during summer season, South Central Railway will run 26 summer special trains between Hyderabad – Gorakhpur - Hyderabad as detailed below:

 

Sl. No

Train No

From - To

Dep.

Arrival

JCO

1

02575

Hyderabad - Gorakhpur

21.05 hrs

(Friday)

06.30 hrs

(Sunday)

1st. 8th, 15th, 22nd, 29th April, 6th, 13th, 20th, 27th May, 3rd, 10th, 17th, 24th June, 2022

2

02576

Gorakhpur - Hyderabad

08.30 hrs

(Sunday)

16.20 hrs

(Monday)

3rd. 10th, 17th, 24th April, 1st, 8th, 15th, 22nd, 29th May, 5th, 12th, 19th, 26th June, 2022

 

I.Train No. 02575/02576 Hyderabad – Gorakhpur – Hyderabad special train : (26 services)

These Special Trains will stop at Secunderabad, Kazipet, Peddapalli, Mancherial, Balharshah, Nagpur, Itarsi, Bhopal, Bina, Virangana Lakhshmibai, Orai, Pokhrayan, Kanpur,Aishbagh, Lucknow City, Barabanki Station and Gonda Railway stations in both the directions (Note: Train No.02575 will not stop at Barabanki Station) .

            These tarins consist of AC II tier, AC III tier and Sleeper class coaches





2
03-03-2022
Annual GM inspection of Jhansi Division concluded General Manager North Central Railway Shri Pramod Kumar inspected Bhimsen-Veerangana Laxmibai section of Jhansi Division

                                  à¤‰à¤¤à¥â€à¤¤à¤° मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

  à¤‰à¤¤à¥â€à¤¤à¤° मध्‍य  à¤°à¥‡à¤²à¤µà¥‡à¤ªà¥à¤°à¤¯à¤¾à¤—राज

पत्रांक: 11पीआर/02/2022                                 à¤ªà¥à¤°à¥‡à¤¸ विज्ञप्ति                     à¤¦à¤¿à¤¨à¤¾à¤‚क : 23.02.2022

Annual GM inspection of Jhansi Division concluded

General Manager North Central Railway Shri Pramod Kumar inspected Bhimsen-Veerangana Laxmibai section of Jhansi Division

Today, o­n 23.02.2022, General Manager North Central Railway Shri Pramod Kumar along with the team of Principal Heads of North Central Railway Headquarters conducted annual inspection of Jhansi Division. This inspection started in the morning and continued till late evening. During this, the Bhimsen-Veerangana Laxmibai section of the division was inspected. Starting from Bhimsen, the track was inspected from the rear window of the inspection caariage. Major Curves, Bridges, Level Crossing, Gang, four stations (Pokhrayan, Orai, Ait and Mustara) yards, Turn Out, Long weilded rail, SEJ, USFD team, speed trials etc. were thoroughly inspected during the day.

In the morning, the General Manager interacted with trackmen at Kanpur station who put forth their service related issues. Departing from Kanpur Central, the General Manager made first stop over between Bhimsen and Rasulpur Gogamu to inspect a minor bridge there.

GM further inspected the non-interlocked engineering level crossing gate number 207C located between Malasa and Pokhraya. Local villagers at the gate met the GM and demanded opening of the gate at regular intervals for passing road traffic.

Deviating from the schedule of the inspection plan, General Manager made a surprise stop over at Pokhrayan station. There he inspected the waiting rooms, retiring rooms, catering units and water vending units etc. and gave necessary instructions for improvements in the standards of passenger amenities. General Manager also interacted with the local public present at Pokhrayan station and took feedback about the existing facilities.

Departing from Pokhrayan. He examined the riding quality and other safety issues o­n the long welded rail and SEJ located between the traffic level crossing gate number 205 and the section.

 During the inspection of Orai station, the General Manager saw the passenger facilities, waiting room, circulating area, railway yard, points, catering units, health unit, relay room, RPF post, CCTV room, OHE depot along with intensive inspection of GRP post etc.

Shri Kumar hold a brief meeting with the officials present regarding the development works being done by the Railways in the Orai-Jalaun area. A technical exhibition of the Carriage and Wagon Department at Orai station was visited by the General Manager. The working model of Vande Bharat, live demo of water recycling plant, model of bio toilet and quick watering system besides working equipments of carriage and wagon were demonstrated in the exhibition. The HRMS Help Desk set up by the Personnel Department for the benefit of Railway employees was also inaugurated. Through this desk, staff will be able to find solutions to their problems related to HRMS in Orai itself.

The General Manager interacted with the representatives of the Vyapar Mandal and the media in Orai. While talking to the media, he discussed the development and doubling of Kanpur - Jhansi (Veerangana Laxmi Bai) section. He said that during the annual inspection, along with the review of development works, the methods of working of the staff is thoroughly checked and they are counselled accordingly. Shri Kumar also answered media queries regarding Kisan Rail, stoppage of trains &  solar panel etc.

General Manager did a comprehensive inspection of the arrangements for passenger facilities, running rooms and newly constructed station building etc. at the Ait station.

General Manager tested the riding quality of the track by conducting speed trials at a speed of 120 kmph between Ait-Mustara (80 km).

On reaching Mustara station, he inspected the traction sub-station and engineering gang number 02 and talked to them. After that, Shri Kumar inspected the curve number 02 and gang number 01 between Mustara-Jhansi, km 1132-1134.

General Manager, North Central Railway interacted with the trackmen and other railway personnel and checked their knowledge about their work and responsibilities. He obtained information regarding the welfare of the staff and directed the concerned officers of the section to pay special attention to the welfare of the employees.

During the inspection, different teams of officers were formed which were assigned specific tasks. While PCSO Shri M.K. Gupta led the team which inspected points and crossing, PCOM Shri Biplav Kumar led the team which inspected station records. PCCM S.Kapil, DRM Shri Ashutosh and PCE Shri S.K.Mishra remained with the GM during inspection while IG RPF Shri Ravindra Verma inspected the security installations.

After the completion of the inspection, he talked to the recognized trade union, organization, chamber of commerce, ZRUCC member etc. in the Divisional Railway Manager's office.

                                                                          





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit