|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
RECENT NEWS
1
www.nfr.indianrailways.gov.in- 2023-04-27
Maligaon, 14th April, 2023: On this auspicious day of Bohag Bihu, Hon’ble Prime Minister Shri Narendra Modi dedicated 249 kms of Double line, 86 km of New Line and 512 kms of Electrified railway track of Assam to the Nation during a programme held at Guwahati on 14th April, 2023. Shri Gulab Chand Kataria, Hon’ble Governor of Assam; Dr. Himanta Biswa Sarma, Hon’ble Chief Minister of Assam; Shri Sarbananda Sonowal, Hon’ble Union Minister of Ports, Shipping & Waterways and Ayush; Shri Rameswar Teli, Hon’ble Union Minister of State for Petroleum and Natural Gas and Labour & Employment and Shri Bimal Borah, Hon’ble Minister, Govt. of Assam were also present on the occasion. Speaking on the occasion Hon’ble Prime Minister mentioned that there was always the issue of lack of physical connectivity in the Northeast, which is being addressed by the present government by laying emphasis on road, rail and air connectivity. During last 9 years broad gauge trains reached Manipur, Mizoram, Meghalaya, Arunachal Pradesh and Tripura. New rail lines are being laid in the Northeast three times faster than before, and the doubling of rail lines taking place at almost 10 times faster than earlier. The Prime Minister highlighted that 5 railway projects that have been inaugurated today worth more than 6,000 crore rupees will accelerate the development of a large part of the region including Assam. The Prime Minister further added that rail has reached a large part of Assam for the first time and the doubling of rail lines will provide easy connectivity to Assam as well as Manipur, Mizoram, Tripura and Nagaland. He also noted that traveling to places of faith and tourism will now become easy. These newly constructed lines will change the rail transportation scenario on this area. More and more trains including trains carrying essential commodities will be able to reach the Northeastern states in a much lesser time from production centers spreading all over the country. The Digaru to Lumding 147 km long double line section was constructed at a cost of Rs. 2,538 crs. Construction of 17 Major Bridges, 106 Minor Bridges and 07 Road Over Bridges are involved. This section passes through the Kamrup (Metro), Marigaon and Nagaon districts of Assam. It helped in reducing the operational constraints of the route which is responsible for all train movements towards states like Nagaland, Mizoram, Manipur, Tripura apart from South and Upper Assam areas. The New Bongaigaon – Dhupdhara 102 km long section was constructed as part of the ongoing New Bongaigaon – Goalpara-Kamakhya 176 km long doubling project. Construction of 35 Major Bridges, 228 Minor Bridges and 24 Road Under Bridges are involved in this section. The project cost was Rs. 1,962 crs. Passing through the Bongaigaon and Goalpara districts of Assam, it will be beneficial for operating trains towards NE region. Gauripur – Abhayapuri 86 km new line section is part of the New Mainaguri (in West Bengal) to Jogighopa (in Assam) 279 km long new Railway line project. It passes through 5 stations namely Alamganj, Bagribari, Bilasipara, Chapar and Bechimari. With the completion of this section, population of a huge area falling under the Dhubri and Bongaigaon districts of Assam got the benefit of Railway service for the very first time. Constructed at a cost of Rs. 1,267 cr, it involves construction of 30 Major Bridges, 305 Minor Bridges, 03 tunnels, 133 Road Under Bridges and 02 Road Over Bridges. As part of the Indian Railways ambitious plan to become the largest “GREEN RAILWAYS” in the world, it plans to become a zero carbon emission network by 2030. Newly electrified 381 km Raninagar Jalpaiguri – Guwahati and 131 km Chaparmukh – Senchoa & Senchoa – Mairabari sections will lead to seamless connectivity of trains to and from Northeast to various metro cities like New Delhi, Chennai, Mumbai, Kolkata, Ahmedabad etc. Running of heavy hauled goods train towards Northeast became possible. Train operation cost also reduced significantly due to savings on fossil fuel consumption. (Sabyasachi De) CPRO/N.F.Railway 2
www.cr.indianrailways.gov.in- 2022-02-02
72 hours Infrastructure Block on Thane-Diva Fast line for 5th and 6th line work Central Railway will operate a special infrastructure block between Thane and Diva for cut & connection works and commissioning of new RRI building in Diva in connection with Thane-Diva 5th and 6th lines. The block will be operated as under – Trains will run Slow line On Existing 5th line and 6th line between Thane and Diva from 00.00 hrs of 5.2.2022 to (FridaySaturday midnight) to 00.00 hrs of 7.2.2022 (Monday/Tuesday midnight 12 am) 72 hours. On Existing Up fast line from 00.00 hrs (midnight 12 am) of 5.2.2022 to 04.00 am of 6.2.2022 (28 hrs) Due to this the working of Mail/Express and Suburban trains during the block period will be as under: •Up Mail/Express and Up fast suburban trains leaving Kalyan from 23.10 hrs (11.10 pm) of 4.2.2022 to 04.00 hrs (4.00 am) of 6.2.2022 will be diverted on Up slow line between Kalyan and Mulund and will not halt at Thane station. •From 6.2.2022 Up fast trains will run on newly laid Up fast line via Kalva platform No.4 and New tunnel-1 •Dn Mail/Express trains leaving LTT and arriving at Thane from 23.10 hrs (11.10 pm) of 4.2.2022 to till completion of block will be diverted on Down fast line between Mulund and Kalyan station via Thane Platform No.5 •Up and Down slow line suburban services will run via newly laid Up and Down slow lines i.e. Thane – Kalva – Mumbra – Diva on proper route •During the block period MEMU services between Vasai Road /Panvel /Roha will run on a special timetable given below (Regular Timetable for Central Railway MEMU services will remain cancelled except Western Railway MEMU services) •Down fast suburban services will run on newly laid Dn fast line via New Platform No.3 of Kalva station, Mumbra platform No.3 and Diva proper platform No.3 •Existing Down and Up fast lines between Thane – Diva via Parsik tunnel will be commissioned as 5th and 6th lines •On 5.2.2022 about 175 timetabled suburban trains will remain cancelled, however few suburban trains will run as specials. Cancellation of Mail / Express trains 1)22119/22120 Mumbai – Karmali - Mumbai Express JCO 5.2.2022 & 6.2.2022 2)12051/12052 Mumbai – Madgaon - Mumbai Janshatabdi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 3)11085 Lokmanya Tilak Terminus - Madgaon Express JCO 7.2.2022 4)11086 Madgaon - Lokmanya Tilak Terminus Express JCO 8.2.2022 5)11099 Lokmanya Tilak Terminus - Madgaon Express JCO 5.2.2022 6)11100 Madgaon - Lokmanya Tilak Terminus Express JCO 6.2.2022 7)22113 Lokmanya Tilak Terminus - Kochuveli Express JCO 5.2.2022 8)22114 Kochuveli - Lokmanya Tilak Terminus Express JCO 7.2.2022 9)12224 Ernakulam - Lokmanya Tilak Terminus Express JCO 2.2.2022 & 6.2.2022 10)12223 Lokmanya Tilak Terminus - Ernakulam Express JCO 5.2.2022 & 8.2.2022 11)12220 Secunderabad - Lokmanya Tilak Terminus Express JCO 4.2.2022 12)12219 Lokmanya Tilak Terminus - Secunderabad Express JCO 5.2.2022 13)12133/ 12134 Mumbai – Mangluru Jn.- Mumbai Express JCO 4.2.2022, 5.2.2022, 6.2.2022 & 7.2.2022 14)17317 Hubballi – Dadar Express JCO 4.2.2022, 5.2.2022 & 6.2.2022 15)17318 Dadar- Hubballi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 16)11008 Pune – Mumbai Deccan Express JCO 4.2.2022, 5.2.2022, 6.2.2022 & 7.2.2022 17)11007 Mumbai-Pune Deccan Express JCO 5.2.2022, 6.2.2022, 7.2.2022 & 8.2.2022 18)11030 Kolhapur – Mumbai Koyna Express JCO 4.2.2022, 5.2.2022 & 6.2.2022 19)11029 Mumbai - Kolhapur Koyna Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 20)12071 / 12072 Mumbai–Jalna-Mumbai Jan Shatabdi Express JCO 5.2.2022 & 6.2.2022 21)12109/12110 Mumbai-Manmad–Mumbai Panchvati Express JCO 5.2.2022 & 6.2.2022 22)11401/11402 Mumbai – Adilabad-Mumbai Nandigram Express JCO 4.2.2022, 5.2.2022 & 6.2.2022 23)12123/12124 Mumbai - Pune – Mumbai Deccan Queen Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 24)12112 Amravati - Mumbai Superfast Express JCO 4.2.2022 & 5.2.2022 25)12111 Mumbai - Amravati Superfast Express JCO 5.2.2022 & 6.2.2022 26)12140 Nagpur - Mumbai Sewagram Express JCO 4.2.2022 & 5.2.2022 27)12139 Mumbai – Nagpur Sewagram Express JCO 5.2.2022 & 6.2.2022 28)11139/11140 Mumbai-Gadag – Mumbai Express JCO 4.2.2022, 5.2.2022 & 6.2.2022 29)17611 H.S.Nanded – Mumbai Rajyarani Express JCO 4.2.2022 & 5.2.2022 30)17612 Mumbai - H.S.Nanded Rajyarani Express JCO 5.2.2022 & 6.2.2022 31)12131 Dadar- Sainagar Shirdi Express JCO 5.2.2022 32)12132 Sainagar Shirdi - Dadar Express JCO 6.2.2022 33)11041 Dadar- Sainagar Shirdi Express JCO 3.2.2022 & 5.2.2022 34)11042 Sainagar Shirdi - Dadar Express JCO 4.2.2022 & 6.2.2022 35)11027 Dadar- Pandharpur Express JCO 4.2.2022 36)11028 Pandharpur - Dadar Express JCO 5.2.2022 37)22147 Dadar- Sainagar Shirdi Express JCO 4.2.2022 38)22148 Sainagar Shirdi - Dadar Express JCO 5.2.2022 39)11003/11004 Dadar- Sawantwadi Road – Dadar Tutari Express JCO 7.2.2022 & 8.2.2022 40)50103/50104 Diva - Ratnagiri–Diva Passenger JCO 5.2.2022 & 6.2.2022 & 7.2.2022 41)10106 Sawantwadi – Diva Express JCO 4.2.2022, 5.2.2022, 6.2.2022 & 7.2.2022 42)10105 Diva-Sawantwadi Express JCO 5.2.2022, 6.2.2022, 7.2.2022 & 8.2.2022 Short Termination of Express trains at PANVEL 1)11004 Sawantwadi Road – Dadar Tutari Express JCO 3.2.2022, 4.2.2022, 5.2.2022 & 6.2.2022 2)10104 Madgaon – Mumbai Mandovi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 3)10112 Madgaon – Mumbai Kokan Kanya Express JCO 4.2.2022, 5.2.2022 & 6.2.2022 4)12202 Kochuveli – Lokmanya Tilak Terminus Express JCO 6.2.2022 5)16346 Thiruvananthapuram Central – LTT Netravati Express JCO 3.2.2022, 4.2.2022, 5.2.2022 & 6.2.2022 6)12620 Mangluru JN. – LTT Matsyagandha Express JCO 4.2.2022, 5.2.2022 & 6.2.2022 Short Termination of Express train at PUNE 1)17032 Hyderabad – Mumbai Express JCO 4.2.2022 & 5.2.2022 Short Origination of Express trains from PANVEL 1)11003 Dadar - Sawantwadi Road Tutari Express JCO 5.2.2022 & 6.2.2022 2)10103 Mumbai - Madgaon Mandovi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 3)10111 Mumbai-Madgaon Kokan Kanya Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 4)12201 Lokmanya Tilak Terminus - Kochuveli Express JCO 7.2.2022 5)16345 LTT-Thiruvananthapuram Central Netravati Express JCO 5.2.2022, 6.2.2022, 7.2.2022 & 8.2.2022 6)12619 LTT - Mangluru JN. Matsyagandha Express JCO 5.2.2022, 6.2.2022 & 7.2.2022 Short Origination of Express train from PUNE 1)12701 Mumbai – Hyderabad Hussain Sagar Express JCO 5.2.2022 & 6.2.2022 MEMU services cancelled on 5.2.2022, 6.2.2022 and 7.2.2022 2)01338/01337 Dombivali – Boisar – Vasai Road 3)01339/01340 Vasai – Diva – Vasai Road 4)01341/01342 Vasai Road – Diva –Vasai Road 5)01343/01344 Vasai Road – Diva –Vasai Road 6)01345 Vasai Road – Diva 7)01357/01358 Vasai Road – Diva –Vasai Road 8)01347/01348 Diva – Roha – Diva 9)01349 Diva – Roha 10)01346 Roha – Diva 11)01353/01354 Diva – Panvel – Diva 12)01355/01356 Diva – Pen - Diva 13)01352/01351 Pen – Diva - Pen Western Railway MEMU services that WILL RUN on 5.2.2022, 6.2.2022 & 7.2.2022 14)09284 Dahanu Road – Panvel 15)09285 Panvel – Vasai Road 16)09287/09288 Panvel – Vasai Road – Panvel 17)09286 Vasai Road – Panvel 18)09281 Panvel – Dahanu road In addition to Western Railway MEMU services following special MEMU services WILL RUN on 5.2.2022, 6.2.2022 & 7.2.2022 (I) Roha – Panvel – Roha MEMU services 1)Panvel – Roha Special -1 leaving Panvel at 08.25 hrs and arrive Roha at 10.10 hrs 2)Roha – Panvel Special -2 leaving Roha at 06.30 hrs and arrive Panvel at 08.15 hrs 3)Panvel –Roha special -3 leaving Panvel at 18.05 hrs and arrive Roha at 19.50 hrs 4)Roha – Panvel Special -4 leaving Roha at 16.15 hrs and arrive Panvel at 17.55 hrs (II) Pen – Panvel – Vasai Road MEMU services 1)Vasai Road – Panvel special-1 leaving Vasai Road at 09.25 hrs and arrive Panvel at 11.10 hrs 2)Pen- Vasai Road special -2 leaving Pen at 06.35 hrs, Panvel at 07.29 hrs and arrive Vasai Road at 09.15 hrs 3)Vasai Road – Panvel special-3 leaving Vasai Road at 13.15 hrs and arrive Panvel at 15.00 hrs 4)Panvel – Vasai Road special -4 leaving Panvel at 11.20 hrs and arrive Vasai Road at 13.05 hrs 5)Vasai Road – Pen special-5 leaving Vasai Road at 17.50 hrs, at Panvel 19.34 hrs and arrive at Pen at 20.30 hrs 6)Panvel – Vasai Road special -6 leaving Panvel at 15.10 hrs and arrive Vasai Road at 16.55 hrs Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this infrastructure block. ---- ---- Date: February 2, 2022 PR No.2022/02/03 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai
COMMENTS
NO Comments. Be the first to Comment...
|