For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








40 Trains from (TIS)TATISILWAI to (TRAN)TORANG


Address: Tatisilwai Railway Station, Tatisilwai, Jharkhand 835103, India

Station Code: TIS

Station Name: TATISILWAI

Zone: SER/South Eastern

Train Frequency Weekly: 121

Station Traffic: Medium

Address: 723212, India

Station Code: TRAN

Station Name: TORANG

Zone: SER/South Eastern

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
58662HTE TATA PASSTIS05:00JAA06:411:41M,TU,W,TH,F,SA,SUUNRESERVED58662 Status
18628RNC HWH INT EXPRNC05:45JAA07:111:26M,TU,SUCC,2S,GN,18628 Status
18626HTE PRNC EXPHTE06:10JAA08:001:50M,TU,W,TH,F,SA,SU3A,GN,18626 Status
22892RNC HWH INT EXPRNC06:55JAA08:211:26W,TH,SACC,2S,GN,22892 Status
12832BKSC GARIB RATHHTE07:00MURI08:231:23TU,F,SU3A12832 Status
18613RNC CPU EXPRNC07:45MURI08:581:13M,TH,SAUNRESERVED18613 Status
13352DHANBAD EXPRESSHTE08:25JAA10:292:04M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13352 Status
63504HATIA BWN PASSTIS08:40JAA10:141:34M,TU,W,TH,F,SA,SUUNRESERVED63504 Status
18310JAT SBP EXPTIS09:10MURI07:351:35M,TU,W,TH,F,SA,SU3A,SL,GN,18310 Status
58026HTE KGP PASSTIS09:40JAA11:191:39M,TU,W,TH,F,SA,SUUNRESERVED58026 Status
63597RNC ASN MEMUTIS12:48JAA14:281:40M,TU,W,TH,F,SA,SUUNRESERVED63597 Status
13320RNC DGHR EXPRNC13:25JAA14:541:29TU,W,TH,F,SA,SUUNRESERVED13320 Status
12873JHARKHAND S J EXHTE13:40MURI15:111:31M,TU,TH2A,3A,SL,GN,12873 Status
12020SHATABDI EXPRESRNC13:45MURI14:531:08M,TU,W,TH,F,SA1A,CC,12020 Status
12366PNBE JANSHATABDIRNC14:25MURI15:311:06M,TU,W,TH,F,SA,SUCC,2S,GN,12366 Status
12817JHARKHAND SJ EXPHTE14:30JAA16:322:02W,F,SU2A,3A,SL,GN,12817 Status
18603RNC BGP EXPRESSRNC15:10MURI16:181:08TU,TH,SA1A,2A,3A,SL,GN,18603 Status
68086RNC GBA PASSTIS15:32JAA16:541:22M,TU,W,TH,F,SA,SUUNRESERVED68086 Status
18309SBP JAT EXPRESSTIS15:48MURI16:551:07M,TU,W,TH,F,SA,SU3A,SL,GN,18309 Status
18605RNC JYG EXPRNC16:00MURI17:051:05TU,TH,SA2A,3A,SL,GN,18605 Status
58034RNC BKSC PASSTIS16:05JAA17:391:34M,TU,W,TH,F,SA,SUUNRESERVED58034 Status
15027MAURYA EXPHTE16:50JAA18:491:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15027 Status
13426ST MALDA TOWN EXRNC18:15MURI19:251:10M2A,3A,SL,GN,13426 Status
58142HTE TATA PASSTIS18:41TUL20:502:09M,TU,W,TH,F,SA,SUUNRESERVED58142 Status
13304RNC DHN INTER CITY EXPRNC18:55JAA20:341:39M,W,F,SUUNRESERVED13304 Status
13403VANANCHAL EXPRNC19:10MURI20:251:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13403 Status
18311SBP BSB EXPRESSHTE19:35MURI20:150:40W,SU2A,3A,SL,GN,18311 Status
18624HTE IPR EXPTIS19:46JAA21:161:30M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18624 Status
18611RNC BSB EXPRESSRNC20:10MURI21:151:05M,TU,F,SA3A,SL,GN,18611 Status
18631RNC GARIBNWAZ EXRNC20:10MURI21:151:05TH3A,SL,GN,18631 Status
15661RNC KYQ EXPRESSRNC20:30MURI21:401:10W2A,3A,SL,GN,15661 Status
18609RNC LTT EXPRESSRNC21:05MURI22:151:10W2A,3A,SL,GN,18609 Status
18640RNC ARA EXPRESSRNC21:05MURI22:151:10SA3A,SL,GN,18640 Status
18619RNC DUMK EXPRNC21:25JAA22:551:30M,TU,W,TH,F,SA,SU3A,SL,GN,18619 Status
18622PATLIPUTRA EXPHTE22:00JAA23:591:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18622 Status
18616KRIYA YOGA EXPTIS22:01TUL00:142:13M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18616 Status
17007SC DBG EXPRESSRNC22:55MURI00:051:10TU,SA2A,3A,SL,GN,17007 Status
17005HYB RXL EXPRESSRNC22:55MURI00:051:10TH2A,3A,SL,GN,17005 Status
12825JHRKHND S KRANTIRNC23:45MURI00:501:05M,TH2A,3A,SL,GN,12825 Status
18634RNC PNBE EXPRNC23:45MURI00:531:08SA2A,3A,18634 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 54 27-04-2023
Hubballi
Press Release No. 54, MEETING CONDUCTED BY SWR WITH IRON ORE FREIGHT CUSTOMERS

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 54 Dt: 27.04.2023

MEETING CONDUCTED BY SWR WITH IRON ORE FREIGHT CUSTOMERS

A Freight Customer Meet was chaired by Shri Sanjeev Kishore, General Manager, South Western Railway o­n 27.04.2023 to discuss various issues related to movement of Iron Ore and increase the rail share in view of recent permission for export of Iron Ore and expansion of Steel Industries. 

Representatives of JSW Steel Limited, Torangallu, JSW Steel Limited, Salem, NMDC Limited, Donimalai, Electrosteel Casting Limited, Rachguneri, Arjas Steel Limited, Tadipatri, Vedanta Limited, Chitradurga and Goa, R. Praveen Chandra Mines, Chitradurga, Kalyani Steels, Ginnigera, Janki Corporation, Ballari, S L R Metalics, Ballari, SMIORE Limited, Sandur, MSPL Limited, Hosapete, KIOCL Limited, Bengaluru Pushpit Steel Limited, Hosapeta attended the meeting and put forward their suggestions to increase loading. Their Representatives also forecasted their expansion plan of their industries during forth coming years.  The officers of South Western Railway noted the suggestions made by the Customers and assured that they will be taken care of.

General Manager elaborated upon the recent developments of Railways in doubling, commissioning of new lines, bye-pass lines, electrification which render hassle-free movement of loaded/empty rakes without traction change/detentions. The infrastructure at Goods sheds are also being improved. He pointed out that now abundant capital investment is being made for upgradation of railway infrastructure after the merger of Railway Budget with General Budget. This has speeded up the infra-development. In 2022-23 he said SWR achieved the highest ever commissioning of new line plus doubling of 228 km, highest ever electrification of 874 RKM. Shri Kishore said that rapid development of infrastructure is imparting confidence to freight customers by reducing bottlenecks, improving transit time etc. which would help to increase modal share of rail transport in the region. He pointed that the infra-upgradation have resulted in improving the mobility of goods trains by 53% from 2021-22 to 2022-23 which was the highest among all railway zones of the country. He assured that all necessary support shall be rendered to the customers. 

While welcoming the customers, it was informed that South Western Railway achieved highest ever loading of 46.67 MT with originating freight revenue of Rs. 4,710 Crs.

  Shri U. Subba Rao, Additional General Manager, Shri Hari Shankar Verma, Principal Chief Operations Manager, Shri Satya Prakash Shastri, Pr. Chief Commercial Manager, Shri Harsh Khare, Divisional Railway Manager, Hubballi, Smt. Shilpi Agarwal, Divisional Railway Manager, Mysuru and other Principal Head of the Departments attended the meeting.

                                                                                                                           Aneesh Hegde
                                                                         Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
Press Release No. 34004-10-2021
Hubballi
Press Release No. 340,SWR COMPLETES THE REGIRDERING OF RAILWAY BRIDGE N. 3 BETWEEN TORANGALLU – RANAJITPURA

           à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY                

प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 340 Dt: 23.09.2021     

SWR COMPLETES THE REGIRDERING OF RAILWAY BRIDGE N. 3 BETWEEN TORANGALLU – RANAJITPURA

South Western Railway completedthe regirdering of Bridge No - 3 between Torangallu – Ranajitpura in Ballari district o­n 22.9.2021 and makes it fit for handling 25 tonne axle loads. This will strengthen the load-bearing capacity of the bridge and enable movement of heavier freight trains achieving better throughput.

Toranagallu-Ranjitpura is an important branch line and handles freight of Iron Ore traffic from National Mineral Development Corporationmines to Jindal Iron and Steel Company Limited, which is the largest integrated steel plant of India. The old bridge was constructed during meter gauge time. The regirdering has been carried out in a time of 3 hrs 15 min, by suspending the trains o­n the route by availing traffic block.

After regirdering, the strength and load-bearing capacity of the bridge has been enhanced This will enable Railways to operate freight trains with 25 tonne axle loads, and more freight can be transported. 


                                                                      Aneesh Hegde

                                                                                        Chief Public Relations Officer          

                                                                                      South Western Railway, Hubballi





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit