For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








30 Trains from (BKSC)BOKARO STL CITY to (TRAN)TORANG


Address: Bokaro Rly Station, Bokaro Steel City, Jharkhand, India

Station Code: BKSC

Station Name: BOKARO STL CITY

Zone: SER/South Eastern

Train Frequency Weekly: 254

Station Traffic: High

Address: 723212, India

Station Code: TRAN

Station Name: TORANG

Zone: SER/South Eastern

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18606JYG RNC EXPRESSBKSC01:00MURI01:550:55W,F,SU2A,3A,SL,GN,18606 Status
18620DUMK RNC EXPRESSBKSC02:05MURI03:081:03M,TU,W,TH,F,SA,SU3A,SL,GN,18620 Status
12826JHRKHND S KRNTIBKSC02:25MURI03:301:05W,SA2A,3A,SL,GN,12826 Status
22806ANVT BBS SUPBKSC02:25MURI03:301:05M1A,2A,3A,SL,GN,22806 Status
18621PATLIPUTRA EXPBKSC02:40MURI03:451:05M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18621 Status
18604BGP RNC EXPRESSBKSC03:15MURI04:151:00W,F,SU1A,2A,3A,SL,GN,18604 Status
63595BKSC ASN MEMUBKSC03:35JAA05:061:31M,TU,W,TH,F,SA,SUUNRESERVED63595 Status
12876NEELACHAL EXPBKSC04:35MURI05:280:53TU,F,SU2A,3A,SL,GN,12876 Status
18610RANCHI EXPRESSBKSC04:55MURI05:530:58SA2A,3A,SL,GN,18610 Status
15028MAURYA EXPRESSBKSC05:10MURI06:151:05M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15028 Status
18623IPR BRKA EXPBKSC05:25SLF06:501:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18623 Status
13404VANANCHAL EXPBKSC06:15MURI07:090:54M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13404 Status
13303DHN RNC INTERCITY EXPBKSC07:25MURI08:200:55TU,W,F,SUUNRESERVED13303 Status
22824BUBNESWR RJDHNIBKSC07:40MURI08:250:45TU,W,TH,SA1A,2A,3A,22824 Status
58033BKSC RNC PASSBKSC09:10KITA10:421:32M,TU,W,TH,F,SA,SUUNRESERVED58033 Status
13319DGHR RNC EXPBKSC10:30MURI11:331:03M,W,TH,F,SA,SUUNRESERVED13319 Status
12019SHATABDI EXPRESSBKSC11:00MURI12:001:00M,TU,W,TH,F,SA1A,CC,12019 Status
12365RNC JANSHATABDIBKSC11:40MURI12:310:51M,TU,W,TH,F,SA,SUCC,2S,GN,12365 Status
15662KYQ RNC EXPRESSBKSC12:00MURI13:031:03TU2A,3A,SL,GN,15662 Status
13351DHN ALAPPUZHA EBKSC12:35MURI13:330:58M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
63503BWN HTE PASSBKSC13:30KITA15:091:39M,TU,W,TH,F,SA,SUUNRESERVED63503 Status
12818JHARKHAND EXPREBKSC13:55MURI14:551:00M,TH,SA2A,3A,SL,GN,12818 Status
12831BBS GARIB RATHBKSC17:40MURI18:360:56M,W,SA3A12831 Status
18625PRNC HTE EXPRESSBKSC18:10MURI19:151:05M,TU,W,TH,F,SA,SU3A,GN,18625 Status
17008DBG SC EXPRESSBKSC18:30MURI19:381:08TU,F2A,3A,SL,GN,17008 Status
17006DBG HYB EXPRESSBKSC18:30MURI19:381:08SU2A,3A,SL,GN,17006 Status
18639ARA RNC EXPRESSBKSC18:45MURI20:101:25SU3A,SL,GN,18639 Status
07010BJU SC SPLBKSC18:45MURI19:481:03W2A,3A,SL,GN,07010 Status
18627HWH RNC INT EXPBKSC19:55MURI20:490:54M,TU,SUCC,2S,GN,18627 Status
13425MLDT ST EXPBKSC21:50MURI22:430:53SA2A,3A,SL,GN,13425 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 54 27-04-2023
Hubballi
Press Release No. 54, MEETING CONDUCTED BY SWR WITH IRON ORE FREIGHT CUSTOMERS

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 54 Dt: 27.04.2023

MEETING CONDUCTED BY SWR WITH IRON ORE FREIGHT CUSTOMERS

A Freight Customer Meet was chaired by Shri Sanjeev Kishore, General Manager, South Western Railway o­n 27.04.2023 to discuss various issues related to movement of Iron Ore and increase the rail share in view of recent permission for export of Iron Ore and expansion of Steel Industries. 

Representatives of JSW Steel Limited, Torangallu, JSW Steel Limited, Salem, NMDC Limited, Donimalai, Electrosteel Casting Limited, Rachguneri, Arjas Steel Limited, Tadipatri, Vedanta Limited, Chitradurga and Goa, R. Praveen Chandra Mines, Chitradurga, Kalyani Steels, Ginnigera, Janki Corporation, Ballari, S L R Metalics, Ballari, SMIORE Limited, Sandur, MSPL Limited, Hosapete, KIOCL Limited, Bengaluru Pushpit Steel Limited, Hosapeta attended the meeting and put forward their suggestions to increase loading. Their Representatives also forecasted their expansion plan of their industries during forth coming years.  The officers of South Western Railway noted the suggestions made by the Customers and assured that they will be taken care of.

General Manager elaborated upon the recent developments of Railways in doubling, commissioning of new lines, bye-pass lines, electrification which render hassle-free movement of loaded/empty rakes without traction change/detentions. The infrastructure at Goods sheds are also being improved. He pointed out that now abundant capital investment is being made for upgradation of railway infrastructure after the merger of Railway Budget with General Budget. This has speeded up the infra-development. In 2022-23 he said SWR achieved the highest ever commissioning of new line plus doubling of 228 km, highest ever electrification of 874 RKM. Shri Kishore said that rapid development of infrastructure is imparting confidence to freight customers by reducing bottlenecks, improving transit time etc. which would help to increase modal share of rail transport in the region. He pointed that the infra-upgradation have resulted in improving the mobility of goods trains by 53% from 2021-22 to 2022-23 which was the highest among all railway zones of the country. He assured that all necessary support shall be rendered to the customers. 

While welcoming the customers, it was informed that South Western Railway achieved highest ever loading of 46.67 MT with originating freight revenue of Rs. 4,710 Crs.

  Shri U. Subba Rao, Additional General Manager, Shri Hari Shankar Verma, Principal Chief Operations Manager, Shri Satya Prakash Shastri, Pr. Chief Commercial Manager, Shri Harsh Khare, Divisional Railway Manager, Hubballi, Smt. Shilpi Agarwal, Divisional Railway Manager, Mysuru and other Principal Head of the Departments attended the meeting.

                                                                                                                           Aneesh Hegde
                                                                         Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
Press Release No. 34004-10-2021
Hubballi
Press Release No. 340,SWR COMPLETES THE REGIRDERING OF RAILWAY BRIDGE N. 3 BETWEEN TORANGALLU – RANAJITPURA

           à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY                

प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 340 Dt: 23.09.2021     

SWR COMPLETES THE REGIRDERING OF RAILWAY BRIDGE N. 3 BETWEEN TORANGALLU – RANAJITPURA

South Western Railway completedthe regirdering of Bridge No - 3 between Torangallu – Ranajitpura in Ballari district o­n 22.9.2021 and makes it fit for handling 25 tonne axle loads. This will strengthen the load-bearing capacity of the bridge and enable movement of heavier freight trains achieving better throughput.

Toranagallu-Ranjitpura is an important branch line and handles freight of Iron Ore traffic from National Mineral Development Corporationmines to Jindal Iron and Steel Company Limited, which is the largest integrated steel plant of India. The old bridge was constructed during meter gauge time. The regirdering has been carried out in a time of 3 hrs 15 min, by suspending the trains o­n the route by availing traffic block.

After regirdering, the strength and load-bearing capacity of the bridge has been enhanced This will enable Railways to operate freight trains with 25 tonne axle loads, and more freight can be transported. 


                                                                      Aneesh Hegde

                                                                                        Chief Public Relations Officer          

                                                                                      South Western Railway, Hubballi





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit