For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

KHED

STATION INFO

Address: Sai Nagar, Khed, Maharashtra, India

Station Code: KHED)KHE

Station Name: KHED)KHED

Zone: KR/Konkan

Total Unique Trains: 61

Train Frequency Weekly: 143

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
10112KONKAN KANYA EXP00:1300:141M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
01431PUNE RN SPECIAL00:2800:302TH2A,3A,SL,GN
09417THVM ADI SPL00:3000:322SA2A,3A,SL,GN
09008THVM MMCT SPL00:3000:322TU,F2A,3A,SL,GN
01013PNVL THIVIM SPL00:4800:502SA2A,3A,SL,GN
01034RN PNVL SPL01:0001:022M,TU,W,TH,F,SA,SU3A,SL,GN
16333VRL TVC EXPRESS01:2801:302TH2A,3A,SL,GN
01043PNVL SWV SPECIAL02:5002:522F2A,3A,SL,GN
09106BRC SWV SPL03:2003:222SU2A,3A,SL,GN
10111KONKAN KANYA EX03:4603:471M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
11003TUTARI EXPRESS04:3004:322M,TU,W,TH,F,SA,SU2A,3A,SL,GN
01036SWV CSMT SPL05:1005:122M,TU,W,TH,F,SA,SU3A,SL,GN
01001CSMT SWV SPL05:2405:262M,TU,W,F,SU3A,SL,GN
11099MAO DOUBLEDECKER05:3605:382SACC
01007CSMT SWV SPL06:0006:022TH,SA3A,SL,GN
01039LTT ZARAP SPL06:0006:022M2A,3A,SL,GN
01069LTT PERN SPL06:0006:022F2A,3A,SL,GN
02198JBP CBE SUP SPL06:3806:402SA2A,3A,SL,GN
09418ADI THVM SPL06:4206:442F2A,3A,SL,GN
09011BDTS MAJN AC SPL06:4206:442SU2A,3A,CC
09009BDTS MAJN SPL06:4206:442TU2A,3A,SL,GN
09007MMCT THVM SPL06:4206:442M,TH2A,3A,SL,GN
09001MMCT MAJN SPL06:4206:442W2A,3A,SL,GN
50104RN DADAR PASS07:5107:521M,TU,W,TH,F,SA,SU2S,GN
11085MAO DOUBLEDECKR09:4009:422M,WCC
01432RN PUNE SPECIAL10:4010:422F2A,3A,SL,GN
50105DIVA SWV PASS11:0411:051M,TU,W,TH,F,SA,SU2S,GN
09415SWV ADI SPL12:0012:022W2A,3A,SL,GN
10103MANDOVI EXPRESS12:0512:072M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN
11086LTT DOUBLEDECKER12:3312:352TU,THCC
01434SWV PNVL SPL12:4612:482SU3A,SL,GN
01448KRMI PNVL SPL12:4612:482SA3A,SL,GN
01048SWV LTT SPL12:4612:482M3A,SL,GN
01035PNVL SWV SPL13:2013:222M,TU,W,TH,F,SA,SU3A,SL,GN
09010MAJN BDTS EXP13:4213:442W2A,3A,SL,GN
09012MAJN BDTS EXP13:4213:442M2A,3A,CC
09002MAJN MMCT EXP13:4213:442TH2A,3A,SL,GN
22907MAO HAPA SUP EXP14:1214:142F2A,3A,SL,GN
50106SWV DIVA PASS14:2214:231M,TU,W,TH,F,SA,SU2S,GN
09105SWV BRC SPL15:2815:302M2A,3A,SL,GN
01044SWV PNVL SPECIAL15:2815:302SA2A,3A,SL,GN
10104MANDOVI EXPRESS15:4315:452M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN
16334VERAVAL EXPRESS17:1017:122M2A,3A,SL,GN
02197CBE JBP EXPRESS17:2017:222M2A,3A,SL,GN
01033CSMT RN SPL18:0018:022M,TU,W,TH,F,SA,SU3A,SL,GN
01042ZARP PNVL SPL18:2818:302F2A,3A,SL,GN
11100LTT DOUBLEDECKER19:0219:042SUCC
01014THIVIM LTT SPL19:4019:422SU2A,3A,SL,GN
12619MATSYAGANDHA EXP19:4819:502M,TU,W,TH,F,SA,SU2A,3A,SL,GN
01447PUNE KRMI SPL20:3420:362F3A,SL,GN
01008SWV CSMT SPL20:5821:002TH,SA3A,SL,GN
01002SWV CSMT SPL20:5821:002M,TU,W,F,SU3A,SL,GN
22908HAPA MADGAON EXP21:1021:122TH2A,3A,SL,GN
50103RATNAGIRI PASS21:2921:301M,TU,W,TH,F,SA,SU2S,GN
01041LTT ZARP SPL22:0822:102TH2A,3A,SL,GN
09416ADI SWV SPECIAL22:1222:142TU2A,3A,SL,GN
01040ZARP LTT SPL22:2822:302M2A,3A,SL,GN
01070PERN LTT SPECIAL22:2822:302F2A,3A,SL,GN
01433PNVL SWV SPL22:3022:322SA3A,SL,GN
01047PNVL SWV SPL23:0823:102SU3A,SL,GN
11004TUTARI EXPRESS23:5023:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 14419-06-2020
Hubballi
Press Release No. 144, SWR REBUILT 4 BRIDGES ON LONDA - MIRAJ RAILWAY TRACK IN LOCKDOWN PERIOD

प्रेस विज्ञप्तिPress Release No. 144  Dt: 19.06.2020

SWR REBUILT 4 BRIDGES o­n LONDA - MIRAJ RAILWAY TRACK IN LOCKDOWN PERIOD

South Western Railway has taken major steps for many safety related maintenance works during Lockdown. These maintenance works form the backbone for safe train running.   As o­nly limited number of special trains in selected routes, goods and parcel trains are running now, turning adversity of lockdown due to an opportunity, SWR has reconstructed has many as 4 minor bridges.  This ensures that disruption of train services needed for reconstructing in normal course, won't be needed.  Monitoring and asset maintenance is a continuous activity and railway took advantage of the lockdown to strengthen its rail network without inconvenience to passengers.

Reconstruction of Railway Bridges was taken up in the month of May with special care considering the then about to begin monsoon.  Rehabilitation/rebuilding of 4 bridges o­n the Londa – Miraj section were identified and taken up and completed before the o­nset of the monsoons.  This section carries heavy freight traffic, catering to movement of coal and Iron Ore to and from Goa Port and the sectional capacity is in excess of 100%.

Work o­n Bridge No.28, 33, 35 & 40 in Londa - Miraj was a major intensive work.  2 Nos.100-150 MT Road cranes, two Proclains, two JCBs, o­ne Road Roller were used for lifting, insertion of RCC Boxes, excavation and compacting of dumped earth were used in rebuilding these bridges.   Three Rail cutting, Drilling machines, Hydraulics Weld trimmers and track tampers were used.  o­ne Duomatic machine for packing of the linked track to allow train traffic at restricted speed was also used.  About sixty (60) contractual labourers and thirty (30) departmental staff attended to the track dismantling, linking, packing and restoration works o­n the bridges.  These works were completed at a cost of Rs.1.5 Cr.

In addition regular patch work like epoxy grouting, floor repair, treatment to exposed reinforcement, cement –mortar plastering were done thoroughly using the lockdown period to maximum effect.   Shri Vijay Agrawal, PCE and Shri Arvind Malkhede, DRM/Hubballi led the planning of these bridge works from the forefront.

Shri A. K. Singh, General Manager/SWR said that the Section Engineers and staff are working round the clock to keep safe, secured and well-maintained railway track for train operations which is a highly challenging task during the monsoon season.

                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
Press Release No. 14115-06-2020
Hubballi
Press Release No. 141, SWR PREPARES TRACK IN GHAT SECTION FOR THE MONSOON SEASON

प्रेस विज्ञप्तिPress Release No. 141   Dt: 15.06.2020

SWR PREPARES TRACK IN GHAT SECTION FOR THE MONSOON SEASON

South Western Railway has taken all out efforts for preparedness in the upcoming monsoon season.  All planned safety works in the Ghat section between Castle Rock and Kulem section of Hubballi Division have been taken up.  As all passenger trains except very few special trains are not running now, no disruption of train services was needed for this maintenance.

Special attention has been paid to catch water drain cleaning and inspection of cuttings. During the month of May and June, Utility Track Vehicles machine blocks are being regularly operated in the Ghat section between Castle Rock and Kulem which has ensured removal of 2000 Sleepers from side drains making them effective to cater to the water flow in the ensuing monsoons and preventing overflow of water o­nto the track and endangering the safety of track. By ensuring smooth flow of drainage water, the steepest gradient in ghat section has been cleared which addresses the problem of rain water overflowing.

Rehabilitation work o­n the eight (8) minor bridges o­n the ghat section between Londa – Miraj and Londa Vasco-da-gama section could also be taken up and these bridges have now been rebuilt/rehabilitated effectively & efficiently and ready for safe running of trains.

As a precautionary measure 1000 nos. sand bags have been kept as standby at Caranzol, Dudsagar and Sonalium as monsoon reserves.  Divisional Railway Manager, Hubballi Shri Arvind Malkhede, is monitoring the work done by the Track maintenance departments along with Branch officers of the divisions.

The Railway is not o­nly carrying out regular maintenance but ready for the upcoming monsoon which is the most challenging season in train operations in Ghat sections.  The workers are working day and night to ensure smooth operations of rail services o­nce lockdown is lifted. 

In addition, 1700 MT of Rail scarp lying in the cutting, valleys and high embankment location was trucked out and condemned for further disposal in the ghat sections. As the monsoons have already arrived SWR has also completed its planned safety works.

Shri A. K. Singh, General Manager/SWR said that though it needed mobilization of resources and man power in testing times, Railway team has managed this and taking up these works in lockdown was very beneficial for passenger train services as it eliminated detention/cancellation of passenger trains which was otherwise needed.

In view of Lockdown, Railway could carry out replacing of Sleepers at eleven Level Crossing gates. Due to heavy road traffic o­n these gates, getting the District Commissioners approval and diversion of road traffic in normal course is long process causing inconvenience to the Road and Rail users. During lockdown, maintenance work at LC Gates - work of removal of check rails, paver blocks, excavation of 400 to 500 mm, replacement of sleepers, rails and PWay fittings could be taken up and completed.

Work o­n caution orders restricting speed of train in the range of 20-30 kmph were attended by replacing perished sleepers and missing P Way fittings, ballast cushions was replenished.

All track maintainer staff have been provided with safety equipment to safeguard against the Covid-19 virus. They are also being counseled by branch officers to maintain social distancing, wear face masks and take precautions to prevent the spread of Covid-19 virus.

       

                                                                                          Chief Public Relations Officer

                                                                              South Western Railway, Hubballi








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search