For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








52 Trains from (BHU)Bhandu Motidau to (SBI)SABARMATI JN


Address: Bhandu Motidau vilage,Mahesana district 384120 . Gujarat

Station Code: BHU

Station Name: Bhandu Motidau

Zone: WR/Western

Train Frequency Weekly: 37

Station Traffic: Low

Address: Chimanbhai Patel Bridge, Sabarmati, Ahmedabad, Gujarat 380005, India

Station Code: SBI

Station Name: SABARMATI JN

Zone: WR/Western

Train Frequency Weekly: 1

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19402LKO ADI EXPMSH00:13ADI02:402:27TU2A,3A,SL,GN,19402 Status
19264DEE PORBNDR EXPMSH00:13ADI02:051:52M,TH2A,3A,SL,GN,19264 Status
19056JU BL EXPRESSMSH00:55ADI03:002:05W2A,3A,SL,GN,19056 Status
18422AII PURI EXPMSH00:55ADI03:002:05TU,F2A,3A,SL,GN,18422 Status
12479SURYA NAGRI EXPMSH01:51ADI03:301:39M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12479 Status
12960BHUJ DADAR EXPMSH02:13ADI04:001:47M,TH2A,3A,SL,GN,12960 Status
12489BKN DDR SF EXPMSH02:24ADI04:001:36TU,SA1A,2A,3A,SL,GN,12489 Status
12990AII DDR EXPRESSUJA02:45ADI04:351:50W,F,SU2A,3A,SL,GN,12990 Status
22473BKN BDTS SF EXPUJA02:45ADI04:351:50M2A,3A,SL,2S,GN,22473 Status
22966BGKT BDTS SF EXPMSH03:07ADI04:351:28SA2A,3A,SL,GN,22966 Status
14311ALA HAZRAT EXPMSH03:45ADI06:152:30TU,TH,SA2A,3A,SL,GN,14311 Status
17624SGNR NED EXPMSH04:20ADI06:352:15SA2A,3A,SL,GN,17624 Status
22664JU MS SF EXPRESSMSH04:20ADI06:352:15M2A,3A,SL,GN,22664 Status
17038HSR SC EXPRESSMSH04:20ADI06:352:15F,SU2A,3A,SL,2S,GN,17038 Status
12916ASHRAM EXPRESSUJA05:36ADI07:402:04M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12916 Status
79434PTN ADI DMURUJ06:15SBIB08:152:00M,TU,W,TH,F,SA,SUUNRESERVED79434 Status
22932JSM BDTS SFUJA06:35ADI09:002:25SA2A,3A,SL,GN,22932 Status
15269JANSADHARAN EXPMSH06:57ADI09:002:03THUNRESERVED15269 Status
22950DEE BDTS SF EXPMSH06:57ADI09:002:03TH2A,3A,SL,GN,22950 Status
22916HSR BDTS S F EXPMSH06:57ADI09:002:03TU2A,3A,SL,GN,22916 Status
79432MSH ADI DMUMSH07:55SBIB09:351:40M,TU,W,TH,F,SA,SUUNRESERVED79432 Status
12958ADI SJ RAJDHANIMSH08:03ADI09:401:37M,TU,W,TH,F,SA,SU1A,2A,3A,12958 Status
16311SGNR KCVL EXPMSH10:20ADI12:302:10TU2A,3A,SL,GN,16311 Status
19410GKP ADI EXPMSH10:29ADI12:452:16SA,SU2A,3A,SL,GN,19410 Status
14806BME YPR AC EXPUJA10:40ADI13:102:30F1A,2A,3A,14806 Status
16588BKN YPR EXPRESSMSH11:06ADI13:031:57TU,SU2A,3A,SL,GN,16588 Status
19028VIVEK EXPRESSMSH11:13ADI13:101:57M2A,3A,SL,GN,19028 Status
22547GWL ADI SUPMSH11:48ADI13:401:52W,SA,SU2A,3A,SL,GN,22547 Status
12547AGC ADI SF EXPMSH11:48ADI13:401:52M,TU,TH,F2A,3A,SL,GN,12547 Status
19224JAT ADI EXPRESSUJA12:57ADI15:052:08M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19224 Status
16507JU SBC EXPMSH13:02ADI14:451:43TH,SA1A,2A,3A,SL,GN,16507 Status
16531SBC GARIB NAWAJMSH13:07ADI14:351:28M2A,3A,SL,GN,16531 Status
16209AII MYS EXPRESSMSH13:07ADI14:351:28F,SU2A,3A,SL,GN,16209 Status
11089BGKTPUNE EXPRESSMSH13:07ADI15:202:13TU1A,2A,3A,SL,GN,11089 Status
16533JU SBC EXPRESSMSH13:09ADI14:351:26W2A,3A,SL,GN,16533 Status
19032YOGA EXPRESSUJA13:56ADI17:103:14M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19032 Status
79436PTN ADI DEMURUJ14:05SBIB16:102:05M,TU,W,TH,F,SAUNRESERVED79436 Status
19414KOAA ADI EXPRESSUJA16:38ADI19:162:38SA2A,3A,SL,GN,19414 Status
14803BGKT ADI EXPRESSUJA17:29ADI20:002:31F2A,3A,SL,2S,GN,14803 Status
22497TPJ HUMSAFAR SUPMSH18:00ADI19:351:35TU3A22497 Status
22475HSR CBE AC S FMSH18:00ADI19:351:35TH1A,2A,3A,22475 Status
54803JU ADI PASSBHU19:18ADI21:352:17M,TU,W,TH,F,SA,SUUNRESERVED54803 Status
19708ARAVALI EXPRESSUJA19:19ADI22:002:41M,TU,W,TH,F,SA,SU2A,3A,SL,2S,GN,19708 Status
59474PTN ADI PASSRUJ20:15ADI23:553:40M,FUNRESERVED59474 Status
19404SLN ADI EXPMSH21:45ADI23:552:10W2A,3A,SL,GN,19404 Status
19408BSB ADI EXPMSH21:45ADI23:552:10SA2A,3A,SL,GN,19408 Status
19416SVDK ADI EXPMSH21:45ADI23:552:10TU2A,3A,SL,GN,19416 Status
14707RANAKPUR EXPRESMSH22:38ADI00:351:57M,TU,W,TH,F,SA,SU2A,3A,SL,2S,GN,14707 Status
22452CDG BDTS SF EXPMSH23:08ADI01:051:57W,SU2A,3A,SL,GN,22452 Status
12215DEE BDTS G RATHMSH23:08ADI01:051:57M,TU,TH,SA3A12215 Status
54806JP ADI PASSNGERBHU23:23ADI02:303:07M,TU,W,TH,F,SA,SUSL,GN,54806 Status
04817BGKT BDTS SPLMSH23:55ADI01:401:45W,SU2A,3A,SL,GN,04817 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
WR Press Release No.2023/0608-06-2023
Mumbai
WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN ON SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR

WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN o­n SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR

For the convenience of passengers and with a view to meet the travel demand, Western Railway has decided to run summer special train o­n Special fare between Udhna - Bhagat Ki Kothi and between Bandra Terminus - Gorakhpur.

According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of the train are as under:

1.Train No. 04814/04813 Udhna – Bhagat Ki Kothi Superfast Special [8 TRIPS]

Train No. 04814 Udhna – Bhagat Ki Kothi Special will depart from Udhna every Sunday at 05.50 hrs. & will reach Bhagat Ki Kothi at 18.00 hrs. the same day. This train will run from 11th June, 2023 to 02nd July, 2023. Similarly, Train No. 04813 Bhagat Ki Kothi – Udhna Superfast Special will depart from Bhagat Ki Kothi every Saturday at 16.00 hrs. & will reach Udhna at 04.00 hrs. the next day. This train will run from 10th June, 2023 to 01st July, 2023.

Enroute this train will halt at Bharuch, Vadodara, Anand, Ahmedabad, Sabarmati, Mahesana, Palanpur, Abu Road, Falna, Marwar, Pali Marwar and Luni stations in both directions. This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second-Class Coaches.

2.Train No. 05054/05053 Bandra Terminus - Gorakhpur Special [2 Trips]

Train No. 05054 Bandra Terminus – Gorakhpur Special will depart from Bandra Terminus o­n Saturday, 10th June, 2023 at 22.45 and reach Gorakhpur at 06.25 hrs o­n Monday. Similarly, Train No. 05053 will depart from Gorakhpur o­n Friday, 9th June, 2023 at 09.30 hrs and arrive Bandra Terminus at 16.00 hrs, the next day. 

 Enroute this train will halt at Borivali, Vapi, Surat, Vadodara, Ratlam, Kota, Gangapur City, Agra fort, Tundla, Kanpur Central, Aishbag, Badshah Nagar, Gonda, Basti and  Khalilabad stations in both directions.

This train comprises General Second Class coaches.

The booking for Train No. 04814 will open from 09.06.2023 at all PRS Counters and o­n IRCTC website. The above trains will run as special train o­n special fare. For detailed information regarding timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in.

*********





2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer