For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








52 Trains from (SBI)SABARMATI JN to (BHU)Bhandu Motidau


Address: Chimanbhai Patel Bridge, Sabarmati, Ahmedabad, Gujarat 380005, India

Station Code: SBI

Station Name: SABARMATI JN

Zone: WR/Western

Train Frequency Weekly: 1

Station Traffic: Low

Address: Bhandu Motidau vilage,Mahesana district 384120 . Gujarat

Station Code: BHU

Station Name: Bhandu Motidau

Zone: WR/Western

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14708RANAKPUR EXPRESADI00:15MSH01:3825:23M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14708 Status
22663MS JODHPUR EXPADI00:35MSH02:111:36SA2A,3A,SL,GN,22663 Status
19263DELHI SR EXPRESSADI00:50MSH02:141:24TU,SA2A,3A,SL,GN,19263 Status
17037SC HSR EXPADI01:10MSH02:351:25TU,W2A,3A,SL,2S,GN,17037 Status
22476CBE HSR AC EXPADI01:10MSH02:501:40SA1A,2A,3A,22476 Status
59473ADI PTN PASSADI03:30RUJ06:443:14TU,SAUNRESERVED59473 Status
19055BL JODHPUR EXPADI03:45MSH05:542:09TU2A,3A,SL,GN,19055 Status
17623NED SGNR EXPADI03:45MSH05:542:09TH2A,3A,SL,GN,17623 Status
19707AMRAPUR ARAVALIADI04:50UJA06:572:07M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19707 Status
19413KOLKATA EXPRESSADI06:05UJA08:232:18W2A,3A,SL,GN,19413 Status
19403SULTANPUR EXPADI06:05MSH07:271:22TU2A,3A,SL,GN,19403 Status
54804ADI JU PASSADI06:15KMLI09:142:59M,TU,W,TH,F,SA,SUUNRESERVED54804 Status
16532GARIB NAWAZ EXPADI07:05MSH09:062:01F2A,3A,SL,GN,16532 Status
16508JODHPUR EXPRESSADI07:05MSH09:062:01M,W1A,2A,3A,SL,GN,16508 Status
16210AJMER EXPRESSADI07:05MSH09:062:01TU,TH2A,3A,SL,GN,16210 Status
16312KCVL SGNR EXPADI07:25MSH09:061:41SA2A,3A,SL,GN,16312 Status
11090PUNE BGKT EXPMAN07:27MSH09:342:07SU1A,2A,3A,SL,GN,11090 Status
22965BDTS BGKT EXPADI08:05MSH09:581:53F2A,3A,SL,GN,22965 Status
12959DADAR BHUJ EXPADI08:15MSH09:341:19W,SA2A,3A,SL,GN,12959 Status
19411AJMER INTERCITYSBIB09:40UJA10:491:09M,TU,W,TH,F,SA,SUCC,2S,GN,19411 Status
19031HARIDWAR MAILADI09:55UJA12:082:13M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19031 Status
79435ADI PTN DMUSBIB10:50RUJ13:002:10M,TU,W,TH,F,SAUNRESERVED79435 Status
19223ADI JAT EXPRESSADI11:20UJA13:001:40M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19223 Status
18421PURI AJMER EXPADI11:35MSH12:561:21M,TH2A,3A,SL,GN,18421 Status
19401ADI LUCKNOW EXPADI11:35MSH13:001:25M2A,3A,SL,GN,19401 Status
19409GORAKHPUR EXPADI11:35MSH13:001:25TH,F2A,3A,SL,GN,19409 Status
79431ADI MSH DMUSBIB15:35MSH16:551:20M,TU,W,TH,F,SA,SUUNRESERVED79431 Status
16587YPR BKN EXPADI16:15MSH17:341:19F,SU2A,3A,SL,GN,16587 Status
15270JANSADHARAN EXPADI16:30MSH17:341:04SUUNRESERVED15270 Status
12548ADI AGC SF EXPADI16:55MSH17:581:03M,W,TH,SU2A,3A,SL,GN,12548 Status
22548ADI GWL SF EXPADI16:55MSH17:581:03TU,F,SA2A,3A,SL,GN,22548 Status
12957SWARNA J RAJ EXADI17:40MSH18:461:06M,TU,W,TH,F,SA,SU1A,2A,3A,12957 Status
12915ASHRAM EXPRESSADI18:30UJA20:131:43M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12915 Status
19415ADI SVDK EXPRESSADI19:05MSH20:361:31SU2A,3A,SL,GN,19415 Status
79433ADI PTN DMUSBIB19:15RUJ21:312:16M,TU,W,TH,F,SA,SUUNRESERVED79433 Status
14805BARMER AC EXPADI19:20UJA20:581:38M1A,2A,3A,14805 Status
22498SGNR HUMSAFAR SFADI19:20MSH20:371:17F3A22498 Status
12216DEE GARIBRATHADI19:40MSH21:151:35TU,W,F,SU3A12216 Status
22451CDG SUP FASTADI19:55MSH21:201:25M,TH2A,3A,SL,GN,22451 Status
19027VIVEK EXPRESSADI19:55MSH21:151:20SA2A,3A,SL,GN,19027 Status
14312ALA HAZRAT EXPADI20:20MSH21:381:18M,TU,TH2A,3A,SL,GN,14312 Status
22949BDTS DEE EXPRESSADI21:00MSH22:111:11W2A,3A,SL,GN,22949 Status
19407ADI VARANASI EXPADI21:00MSH22:111:11TH2A,3A,SL,GN,19407 Status
22915BDTS HSR SF EXPADI21:00MSH22:111:11M2A,3A,SL,GN,22915 Status
14804ADI BGKT EXPRESSADI21:00UJA22:331:33F2A,3A,SL,GN,14804 Status
04818BDTS BGKT SPLADI21:15MSH22:241:09M,TH2A,3A,SL,GN,04818 Status
12480SURYANAGARI EXPADI21:25MSH22:281:03M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12480 Status
12490DDR BIKANER EXPADI22:25MSH23:401:15W,SU1A,2A,3A,SL,GN,12490 Status
12989AJMER EXPRESSADI22:25UJA00:021:37M,TH,SA2A,3A,SL,GN,12989 Status
22474BDTS BKN SUP EXPADI22:25UJA00:021:37TU2A,3A,SL,GN,22474 Status
22931BDTS JSM EXPADI22:25UJA00:021:37F2A,3A,SL,GN,22931 Status
54805JAIPUR PASSENGERADI23:30KMLI02:062:36M,TU,W,TH,F,SA,SUSL,GN,54805 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
WR Press Release No.2023/0608-06-2023
Mumbai
WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN ON SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR

WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN o­n SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR

For the convenience of passengers and with a view to meet the travel demand, Western Railway has decided to run summer special train o­n Special fare between Udhna - Bhagat Ki Kothi and between Bandra Terminus - Gorakhpur.

According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of the train are as under:

1.Train No. 04814/04813 Udhna – Bhagat Ki Kothi Superfast Special [8 TRIPS]

Train No. 04814 Udhna – Bhagat Ki Kothi Special will depart from Udhna every Sunday at 05.50 hrs. & will reach Bhagat Ki Kothi at 18.00 hrs. the same day. This train will run from 11th June, 2023 to 02nd July, 2023. Similarly, Train No. 04813 Bhagat Ki Kothi – Udhna Superfast Special will depart from Bhagat Ki Kothi every Saturday at 16.00 hrs. & will reach Udhna at 04.00 hrs. the next day. This train will run from 10th June, 2023 to 01st July, 2023.

Enroute this train will halt at Bharuch, Vadodara, Anand, Ahmedabad, Sabarmati, Mahesana, Palanpur, Abu Road, Falna, Marwar, Pali Marwar and Luni stations in both directions. This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second-Class Coaches.

2.Train No. 05054/05053 Bandra Terminus - Gorakhpur Special [2 Trips]

Train No. 05054 Bandra Terminus – Gorakhpur Special will depart from Bandra Terminus o­n Saturday, 10th June, 2023 at 22.45 and reach Gorakhpur at 06.25 hrs o­n Monday. Similarly, Train No. 05053 will depart from Gorakhpur o­n Friday, 9th June, 2023 at 09.30 hrs and arrive Bandra Terminus at 16.00 hrs, the next day. 

 Enroute this train will halt at Borivali, Vapi, Surat, Vadodara, Ratlam, Kota, Gangapur City, Agra fort, Tundla, Kanpur Central, Aishbag, Badshah Nagar, Gonda, Basti and  Khalilabad stations in both directions.

This train comprises General Second Class coaches.

The booking for Train No. 04814 will open from 09.06.2023 at all PRS Counters and o­n IRCTC website. The above trains will run as special train o­n special fare. For detailed information regarding timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in.

*********





2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit