For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

16589 RANI CHENNAMMA

Train Schedule & Fare
16589-RANI CHENNAMMA
Ksr bangalore cy jn to C shahumharaj t | Distance-795Kms | Travel Time 16:25Hrs | Avg Speed 49Km/Hr

Runs On- MON,TUE,WED,THU,FRI,SAT,SUN
Fare Approx
1AC2AC3ACCCFCSL2S3E
22751340930XX345XX


S.noCodeStn NameArr.Dep.HaltDisDay
1SBCKSR BANGALORE CY JNSource21:1501
2YPRYESVANTPUR JN21:2521:272:0061
3DBLDODBELE21:4621:471:00371
4TKTUMKUR22:2522:272:00701
5AMSAAMMASANDRA23:0523:061:001141
6TTRTIPTUR23:3323:352:001401
7ASKARSIKERE JN00:0500:105:001662
8DRUKADUR00:4300:452:002052
9RRBBIRUR JN00:5400:562:002112
10DVGDAVANGERE02:3302:352:003262
11HRRHARIHAR02:5302:552:003392
12RNRRANIBENNUR03:2003:222:003622
13HVRHAVERI03:4803:502:003942
14UBLHUBLI JN05:3505:4510:004702
15DWRDHARWAR06:0806:102:004902
16LWRALNAVAR JN06:4906:501:005262
17LDLONDA JN07:2807:302:005602
18KNPKHANAPUR07:5908:001:005852
19BGMBELAGAVI08:2508:305:006112
20PCHPACHHAPUR09:1909:201:006472
21GKKGOKAK ROAD09:3909:401:006632
22GPBGHATPRABHA09:4909:501:006692
23CKRCHIKODI ROAD10:0910:101:006842
24RBGRAYBAG10:2910:301:006982
25CNCCHINCHLI10:3910:401:007092
26KUDKUDACHI10:4910:501:007152
27UGRUGAR KHURD11:0411:051:007222
28MRJMIRAJ JN12:0012:1515:007482
29KOPC SHAHUMHARAJ T13:40Destination7952
Popular Station Combinations
29 results in 0.04 seconds

RECENT NEWS

1
Press Release No. 9123-05-2023
Hubballi
Press Release No. 91, SWR ACHIEVES HIGHEST MOBILITY IMPROVEMENT AMONG ALL ZONES

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 91 Dt: 23.05.2023

SWR ACHIEVES HIGHEST MOBILITY IMPROVEMENT AMONG ALL ZONES

Indian Railways is termed as the lifeline of the nation. It plays a very important role in keeping the supply chain of essential commodities intact, ensuring timely supplying of raw materials to industries, power plants as well as enabling timely transport of finished goods, food grains and other products

SWR has been making pioneering efforts to enhance railway connectivity in the jurisdiction it serves.

In the last financial year i.e., 2022-23, SWR has made focussed efforts to improve the mobility of trains through various measures. Among all the zones of IR, SWR has achieved a visible improvement in mobility by 53% - the average speed of goods trains (including stabling and yarding) increased from 13.97 kmph in April 2022 to 21.6 kmph in April 2023. This tremendous improvement has been possible through implementation of various works such as:

1.Commissioning of Gadag Byepass in March 2022

The construction of byepass at Gadag saved the time lost in reversal of engines of goods trains coming from Goa/Hubballi towards Vijayapura. This also eliminated the need for goods trains to enter Gadag Jn.  The Hubballi Bye pass, commissioned since Sept 2019 has avoided detention of goods trains while entering Hubballi Station, improved the punctuality of several Mail/Express trains traversing through Hubballi Jn.

2.Highest ever Electrification

In 2022-23, SWR has achieved the highest ever Electrification of 874 RKM. All major routes of SWR are being electrified. This has not o­nly saved Rs.205 Crore o­n diesel expenditure in 2022-23 but also eliminated the need for traction change enroute. 24 trains were converted to electric traction in 2022-23.

3.Highest ever commissioning of Doubling and New Line

In FY 2022-23, SWR achieved the highest ever commissioning of Doubling and New Line of 228.5 km. A record New Line and Doubling was achieved in 2022-23 (228 km). Doubling of critical routes such as Yelahanka - Penukonda (120 Km) and Hubballi - Bengaluru (469 km) also contributed to the improvement of punctuality.

4.Upgradation of sectional speed

Concerted efforts were made to enhance speed by removing the curves and removing the PSRs at 18 locations. o­n 732 km, maximum permissible speed was raised to 110 kmph, and o­n 91.6 km speeds were raised to 100 kmph, and o­n loop lines, the speeds were raised from 10/15 kmph to 30 kmph o­n 437 km over SWR territory.

116 trains have been speeded up in 2022-23 saving a cumulative 2718 minutes. For eg. Rani Chennamma (16589) between Bengaluru and Hubballi used to take about 7.5 hours earlier, but now it takes just 6.5 hours. In 2021-22 Rani Chennamma was speeded up by 39 minutes (end-to-end) and in 2022-23 by 45 minutes.

5.Running of Crack trains

Further with doubling of tracks of Goods trains were run as ‘Cracks’- meaning the trains would run end-to-end without any stoppages in between – thereby achieving a higher average speed, and effectively reducing the transit time. For eg. in 2021-22 we ran 2503 Crack trains and in 2022-23 we ran 6077 Crack trains transporting greater amount of cargo over longer distances in lesser time.

This improved throughput and enhanced section capacity has resulted in better turn-round of goods wagons. This enabled SWR to register its highest ever loading of 46.7 million tonnes, the previous record was in 2007-08 i.e., of 46.24 million tonnes.

General Manager Shri Sanjeev Kishore stated that there is now an unprecedented thrust as well as capital investment o­n augmentation of railway infrastructure in SWR jurisdiction. In the days to come-railway will emerge as a ‘transporter of choice’ for the industry as well as the passengers.

                                                                                                                               Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
2023/01/2620-01-2023
Change of Composition of Miraj-Bengaluru and Solapur-Mysuru Express


Change of Composition of Miraj-Bengaluru and Solapur-Mysuru Express

Railways have decided to change the composition of the following trains as per details given below:
 
16589 KSR Bengaluru City Jn-Miraj Rani Chennamma Express with effect from 20.1.2023
16590 Miraj-KSR Bengaluru City Jn Rani Chennamma Express with effect from 21.1.2023

Revised Composition: o­ne First AC, o­ne AC-2 Tier, 4 AC-3 Tier, 10 Sleeper Class, 3 General Second Class and two Generator Vans

16535 Mysuru Jn-Solapur Jn Golgumbaz Express with effect from 21.1.2023
16536 Solapur Jn-Mysuru Jn Golgumbaz Express with effect from 22.1.2023
 
Revised Composition: o­ne AC First cum AC-2 Tier, 5 AC-3 Tier, 10 Sleeper Class, 3 General Second Class and two Generator Vans
 
Passengers are requested to check the status of their waitlisted tickets before undertaking the journey.
For detailed timings at halts of these trains please visit www.enquiry.indianrail.gov.in or download NTES App
Passengers are advised to follow covid appropriate behaviour for their and other's safety.
--- --- ---
Date: January 20, 2023
PR No. 2023/01/26
This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivaji Sutar)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search