For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

ALNAVAR JN

STATION INFO

Address: Alnavar Junction, Alnavar, Karnataka, India

Station Code: LWR)ALNAVAR J

Station Name: LWR)ALNAVAR JN

Zone: SWR/South Western

Total Unique Trains: 30

Train Frequency Weekly: 125

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
11048UBL MRJ EXPRESS00:2300:252M,TU,W,TH,F,SA,SUSL,GN
06948UBL VSG LINK EXP00:2400:251M,TU,W,TH,F,SA,SU3A,SL,GN
17021HYB VSG EXPRESS00:4900:501TH2A,3A,SL,GN
17309YPR VASCO EXP00:4900:501TU,SU2A,3A,SL,GN
17419TPTY VSG EXP00:4900:501TH2A,3A,SL,GN
17310YPR BIWEEKLY EX01:3101:321M,SA2A,3A,SL,GN
11047MIRAJ UBL EXP04:1804:202M,TU,W,TH,F,SA,SUSL,GN
12780GOA EXPRESS04:1804:202M,TU,W,TH,F,SA,SU2A,3A,SL,GN
16589RANI CHENNAMMA06:4906:501M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
56922BGM UBL FAST PASS07:4907:501M,TU,W,TH,F,SA,SUUNRESERVED
17318LTT HUBLI EXP09:2509:261M,TU,W,TH,F,SA,SU2A,3A,SL,GN
17415HARIPRIYA EXP09:3909:401M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
11021TIRUNELVELI EXP10:3810:402TU,W,SA2A,3A,SL,GN
11035SHARAVATHI EXP10:3910:401TH2A,3A,SL,GN
11005PUDUCHERRY EXP10:3910:401M,F,SU2A,3A,SL,GN
17420VSG TPTY EXP12:4912:501F2A,3A,SL,GN
17022VSG HYB EXP12:4912:501F2A,3A,SL,GN
51419MRJ UBL PASS12:5312:552M,TU,W,TH,F,SA,SUUNRESERVED
11304KOP MUGR EXPRESS13:4413:451M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51420UBL MRJ PASS13:5113:521M,TU,W,TH,F,SA,SUUNRESERVED
11303MUGR KOP EXPRESS14:4914:501M,TU,W,TH,F,SA,SU2A,3A,SL,GN
11036SHARAVATI EXP16:1416:151SU2A,3A,SL,GN
11022CHALUKYA EXP16:1416:151M,TH,F2A,3A,SL,GN
11006CHALUKYA EXP16:1416:151TU,W,SU2A,3A,SL,GN
17317LOKAMANYA TT EXP16:4316:452M,TU,W,TH,F,SA,SU2A,3A,SL,GN
17416HARIPRIYA EXP17:3917:401M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
17305NZM LINK EXP17:4317:452M,TU,W,TH,F,SA,SU1A,2A,SL,GN
56921UBL BGM PASS19:0919:101M,TU,W,TH,F,SA,SUUNRESERVED
16590RANICHENNAMA EX20:4320:452M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
02779VSG SBC LINK EXP20:4320:452M,TU,W,TH,F,SA,SU3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 41015-11-2021
Hubballi
Press Release No. 410, RAILWAY ELECTRIFICATION WORK IN FULL SWING IN SOUTH WESTERN RAILWAY

              दक्षिण पश्चिम रेलवे / SOUTH WESTERN RAILWAY                प्रेस विज्ञप्ति / Press Release No. 410 Dt: 07.11.2021

RAILWAY ELECTRIFICATION WORK IN FULL SWING IN SOUTH WESTERN RAILWAY

ØWith more than 598.7 RKM of Electrification, South Western Railway log highest ever figure in Electrification of route in last 16 months

Ø 692 RKM more targeted for electrification by Mar 2022 in SWR

ØFrom 208 RKM in 2016 (5% of SWR network), Electrified track saw astonishing rise to 1233 RKM (34% of SWR network) presently upto March 2021

Indian Railway is marching ahead towards achieving the goal of Net Zero Carbon Emission. 

Several green initiatives are being implemented to achieve the same.  Railway is electrifying its entire rail network to provide greener transport and reduce carbon footprint.   In South Western Railway, Electrification work is in full swing.  Rail Vikas Nigam Ltd. (RVNL) and Central Organization for Railway Electrification (CORE) are executing the Electrification works in jurisdiction of   South Western Railway.

In the period from July 2020 to Mar. 2021, 477 Route Kilo Metres (RKM) of Electrification work has been completed in SWR and authorization of Commissioner of Railway Safety has also been received.

It includes 99 RKM between Rayadurga-Thalaku-Chitradurga, 103 RKM between Kariganuru-Harlapur-Hulkoti, 65 RKM between Hubballi and Alnavar, 85 RKM between Anekal-Periyanagathunai-Palakkodu and 125 RKM between Kudgi and Hotgi.

In the current Financial Year from Apr.2021, 122 RKM of Electrification has been completed   so far. It includes 33 RKM between Alnavar and Londa, 33 RKM between Chitradurga-Chikjajur and 56 RKM between Chikbanavar and Tumakuru. Further, 570 RKM of Electrification is targeted for completion in current Financial Year ending by Mar.2022. 

On 04.11.2021, Electric Loco Trial was conducted successfully between Hulkoti and Hubballi Bypass East (39 RKM).

76 RKM between Palakoddu-Sivadi-Omalur, 45 RKM between Yelahanka-Chikballapur, 20 RKM between Kalgurki-Wandal, 11 RKM between Londa-Tinaighat, 113 RKM between Arsikere-Birur-Chikjajur, 61 RKM between Mysuru-Chamarajanagar, 48 RKM between Gadag-Hole Alur, 60 RKM between Tumakuru-Kardi, 47 RKM between Tinaighat-Castlerock and Kulem-Madgaon, and 44 RKM between Bangarpet- Srinivaspur are also targeted for Electrification in the current Financial Year.

Before 2017, o­nly 208 RKM between Bengaluru and Jolarpettai was electrified in SWR.  In the year 2016-17 electrification of 259 RKM, in 2017-18 electrification of 95 RKM, in 2018-19 electrification of 41.6 RKM and in 2019-20 electrification of 143.1 RKM have been completed. 

Electrification has now been completed between Hubballi-Ballari and Ballari Rayadurga fully.  The Electrification between Hubballi and Bengaluru line is expected to be completed by March 2023.  As per targets, by December 2023, all the major routes of SWR will be electrified. 

Recently, o­n 4th November, 2021 Shri Sanjeev Kishore, GM/SWR along with Shri P.K. Mishra, Additional General Manager & Shri Manoj Mahajan, Principal Chief Electrical Engineer conducted a meeting through Video Conference with DRMs of all the 3 Divisions, top officials of RVNL & CORE and directed them to give top priority to complete the Railway Electrification works as per targets. He reviewed the progress of works of foundation of masts, erection, wiring etc. as per action plan. He advised them to plan works targeted for current financial year for completion by Jan/Feb.2022.

Electrification of Railway lines besides being environment friendly, will also save foreign exchange reserves spent o­n High-Speed Diesel Oil.

In addition to above, passenger trains with higher speed & heavier goods trains can be run after Electrification of tracks

                                                                              

                                                                                        Chief Public Relations Officer          

                                                                                      South Western Railway, Hubballi




2
Press Release No. 30329-08-2021
Hubballi
Press Release No. 303, SPEEDING UP AND REVISION IN TIMINGS OF TRAINS.

               दक्षिण पश्चिम रेलवे/ SOUTH WESTERN RAILWAY               प्रेस विज्ञप्ति/ Press Release No. 303 Dt: 29.08.2021

I.             SPEEDING UP AND REVISION IN TIMINGS OF TRAINS

South Western Railway has completed number of doubling and traffic facility works in recent past which resulted in improved mobility and thereby  these trains could be speeded up.

 One more train of SWR has been speeded up from 01.09.2021 as detailed below:-

Train No. 02089 KSR Bengaluru – Shivamogga Town Janashatabdi Express Special will be speeded up by 15 minutes, which will help passengers to  reach Shivamogga 15 minutes early, due to speeding up arrival/departure timings at enroute stations have been revised as under:-

1.Train No. 02089 KSR Bengaluru – Shivamogga Town Janashatabdi Express Special:-

Station

A/D

T.No.02089 SBC-SMET Exp Spl

Existing timings

Revised timings

KSR Bengaluru

D

17.15

17.15

Yesvantpur

A/D

17.25/17.27

17.25/17.27

Tumakuru

A/D

18.21/18.23

18.13/18.15

Arsikere

A/D

19.38/19.40

19.33/19.35

Kadur

A/D

20.09/20.10

20.04/20.05

Birur

A/D

20.21/20.22

20.13/20.15

Tarikere

A/D

20.45/20.46

20.39/20.40

Bhadravati

A/D

21.04/21.05

20.58/21.00

Shivamogga Town

A

21.55

21.40

II.REVISION IN TIMINGS OF TRAINS

Sl.No

Train. No.

From-To

Remarks

With effect commencing journey from

2.

06529

KSR Bengaluru – Talguppa

Revision in timings

01.09.2021

3.

01005

Dadar- Puducherry

Revision in timings

03.09.2021

4.

01021

Dadar - Tirunelveli

Revision in timings

01.09.2021

5.

01035

Dadar - Mysuru

Revision in timings

02.09.2021

6.

01006

Puducherry - Dadar

Revision in timings

01.09.2021

7.

01022

Tirunelveli - Dadar

Revision in timings

02.09.2021

8.

01036

Mysuru - Dadar

Revision in timings

05.09.2021

2.Train No. 06529 KSR Bengaluru – Talguppa Express Special:-





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit

Station

A/D

T. No. 06529 SBC-TLGP Exp Spl

Existing timings

Revised timings

KSR Bengaluru

D

15.00

15.00

Yesvantpur

A/D

15.10/15.12

15.10/15.12

Tumaluru

A/D

16.00/16.02

16.00/16.02

Tiptur

A/D

16.58/17.00

16.58/17.00

Arsikere

A/D

17.20/17.25

17.25/17.30

Kadur

A/D

17.59/18.00

17.59/18.00

Birur

A/D

18.08/18.10

18.10/18.12

Tarikere

A/D

18.34/18.35

18.36/18.37

Bhadravati

A/D

18.54/18.55

18.54/18.55

Shivamogga

A/D

19.09/19.10

19.09/19.10

Shivamogga Town

A/D

19.40/19.45

19.40/19.45

Anandapuram

A/D

20.33/20.35

20.43/20.45

Sagara Jambagaru

A/D