For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

AMMASANDRA

STATION INFO

Address: National Highway 25, Alambagh, Lucknow, Uttar Pradesh 226008, India

Station Code: AMSA)AMMASANDR

Station Name: AMSA)AMMASANDRA

Zone: SWR/South Western

Total Unique Trains: 21

Train Frequency Weekly: 127

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
56909HOSPET PASSR00:2400:251M,TU,W,TH,F,SA,SUSL,GN
56911SBC UBL PASS00:2400:251M,TU,W,TH,F,SA,SUUNRESERVED
56910SBC FAST PSGN02:1402:151M,TU,W,TH,F,SA,SUSL,GN
56912SBC FAST PSGN02:1402:151M,TU,W,TH,F,SA,SUSL,GN
16590RANICHENNAMA EX04:2404:251M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
02779VSG SBC LINK EXP04:2404:251M,TU,W,TH,F,SA,SU3A,SL,GN
56224ASK SBC PASS05:5906:001M,TU,W,TH,F,SA,SUUNRESERVED
56228SMET SBC PASS07:3407:351M,TU,W,TH,F,SA,SUUNRESERVED
56917SBC SMET PASS08:3708:381M,TU,W,TH,F,SA,SUUNRESERVED
56913SBC UBL PASS08:3708:381M,TU,W,TH,F,SA,SUUNRESERVED
56519SBC CTA PASS10:0910:101M,TU,W,TH,F,SA,SUUNRESERVED
56515SBC UBL PASS10:2410:251M,TU,W,TH,F,SA,SUUNRESERVED
56277CMGR YPR PASS10:4910:501M,TU,W,TH,F,SA,SUUNRESERVED
56516UBL SBC PASS16:4916:501M,TU,W,TH,F,SA,SUUNRESERVED
56520CTA SBC PASS16:5716:581M,TU,W,TH,F,SA,SUUNRESERVED
56278YPR CMGR PASS17:2917:301M,TU,W,TH,F,SA,SUUNRESERVED
56914UBL SBC PASS18:0118:021M,TU,W,TH,F,SA,SUUNRESERVED
56918SMET SBC PASS18:1118:121M,TU,W,TH,F,SA,SUUNRESERVED
56227SBC SMET PASS18:5919:001M,TU,W,TH,F,SA,SUUNRESERVED
56223SBC ASK PASS21:0421:051M,TU,W,TH,F,SA,SUUNRESERVED
16589RANI CHENNAMMA23:0523:061M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 5325-05-2022
Hubballi
Press Release No. 53, SPEEDING UP AND REVISION IN TIMINGS OF TRAINs

 à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 53 Dt: 24.05.2022

I. SPEEDING UP AND REVISION IN TIMINGS OF TRAIN No. 07369

South Western Railway has decided to speed up and revise the timings of Train No. 07369 Chikkamagaluru – Yesvantpur Daily Passenger Special at some stations with effect journey commencing from Chikkamagaluru from 26.05.2022, as detailed below: -


Station

Train No. 07369 Chikkamagaluru – Yesvantpur Daily Passenger Special

Existing Timings

Revised Timings

Chikkamagaluru

07:50 AM (Dep)

08:00 AM (Dep)

KaniveHalli

08:04/08:05 AM

08:14/08:15 AM

Sakharayapatna

08:19/08:20 AM

08:29/08:30 AM

Kadur

08:55/09:10 AM

09:05/09:20 AM

Devanur

09:25/09:26 AM

09:35/09:36 AM

Banavar

09:36/09:37 AM

09:46/09:47 AM

Arsikere

09:55/10:00 AM

10:05/10:10 AM

Honnavalli Road

10:14/10:15 AM

10:24/10:25 AM

Tiptur

10:25/10:27 AM

10:35/10:37 AM

Kardi

10:37/10:38 AM

10:47/10:48 AM

Banasandra

10:49/10:50 AM

10:59/11:00 AM

Ammasandra

10:57/10:58 AM

11:07/11:08 AM

There will be no change in timings from Sampige Road to Yesvantpur Stations

II. REVISION IN TIMINGS OF TRAIN No. 11311/11312 & 22679/22680

South Western Railway has decided to revise the timings of the following trains with effect from 31.05.2022, as per the details given below: -

1. Train No. 11311/11312 Solapur – Hassan – Solapur Daily Express, journey commencing from both side with effect from 31.05.2022.


Train No. 11311 

Solapur – Hassan Daily Express

Station

Train No.11312

 Hassan – Solapur Daily Express

Existing Timings

Revised Timings

Existing Timings

Revised Timings

06:13/06:15 AM

06:00/06:02 AM

Yelahanka

09:09/09:10 PM

No Change

06:50/07:25 AM

06:50/07:15 AM

Yesvantpur

07:55/08:50 PM

07.50/08.50 PM

07:35/07:37 AM

07:25/07:27 AM

Chikbanavar

-- 

 --

08:25/08:26 AM

08:15/08:16 AM

Kunigal

05:39/05:40 PM

No Change

08:37/08:38 AM

08:27/08:28 AM

Yediyuru

05:25/05:26 PM

08:55/08:56 AM

08:45/08:46 AM

B.G. Nagar

05:09/05:10 PM

09:22/09:23 AM

09:12/09:13 AM

Shravanabelagola

04:44/04:45 PM

11:00 AM (Arr)

11:00AM (Arr)

Hassan

2
Press Release No. 55802-03-2022
Hubballi
Press Release No. 558, NITTURU - BANASANDRA DOUBLE LINE ON TUMAKURU - ARSIKERE SECTION COMMISSIONED

 à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 558 Dt: 02.03.2022


NITTURU - BANASANDRA DOUBLE LINE o­n TUMAKURU - ARSIKERE SECTION COMMISSIONED


            Doubling of Railway track between Nittur – Banasandra which is a part of Tumakuru – Arsikere Doubling Project was commissioned o­n 25. 02. 2022. This line of 22 kms stretch was taken up at a cost of Rs.75.5 Crores. It consists of 5 major bridges and 2 newly constructed Road Under Bridges. Tumakuru – Arsikere Doubling Project of 96 Kms o­n Bengaluru-Hubballi line was sanctioned during 2015.

It is an important milestone in the doubling of Hubballi – Bengaluru route. This completed and commissioned track doubling will increase the line capacity of this important line connecting Bengaluru to Hubballi, Belagavi and Mumbai. It will also give impetus to rail infrastructure in the region of Arsikere – Tumakuru and improve intercity connectivity.

With the commissioning of this section, the doubling between Tumakuru – Arsikere stands fully completed and commissioned. Nittur – Banasandra track Doubling involved 6 cut & connections in mid-section and 2 cut & connections including slewing and aligning 500meters length in curve in Ammasandra yard having both constraints of site and labour. This is o­ne of the few projects o­n Indian Railways having a length of nearly 100 Kms getting completed despite the challenges of COVID 19 and heavy rains between 2019 – 2021.


                                                       Chief Public Relations Officer          
                                            South Western Railway, Hubballi 








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit