For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

KHANAPUR

STATION INFO

Address: 591302, India

Station Code: KNP)KHANAPU

Station Name: KNP)KHANAPUR

Zone: SWR/South Western

Total Unique Trains: 15

Train Frequency Weekly: 73

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
01663DWR HBJ EXP00:5700:581SA1A,2A,3A,SL,GN
56922BGM UBL FAST PASS06:2406:251M,TU,W,TH,F,SA,SUUNRESERVED
51406CLR MRJ PASS07:0907:101M,TU,W,TH,F,SA,SUUNRESERVED
16589RANI CHENNAMMA07:5908:001M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
11005PUDUCHERRY EXP09:2909:301M,F,SU2A,3A,SL,GN
17415HARIPRIYA EXP10:4910:501M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
51419MRJ UBL PASS11:1111:121M,TU,W,TH,F,SA,SUUNRESERVED
51432LD MRJ PASS12:1112:121M,TU,W,TH,F,SA,SUUNRESERVED
51420UBL MRJ PASS15:2415:251M,TU,W,TH,F,SA,SUUNRESERVED
17416HARIPRIYA EXP16:1416:151M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
11006CHALUKYA EXP17:2917:301TU,W,SU2A,3A,SL,GN
01664HBJ DHARWAR EXP17:3417:351F1A,2A,3A,SL,GN
16590RANICHENNAMA EX18:5919:001M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
56921UBL BGM PASS20:4420:451M,TU,W,TH,F,SA,SUUNRESERVED
51405MRJ CLR PASS21:1421:151M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 19925-08-2020
Hubballi
Press Release No. 199, TRACK ON ROAD NO.4 OF SHIVATHAN RAILWAY STATION UP LINE RESTORED ON 19.08.2020

प्रेस विज्ञप्तिPress Release No. 199  Dt: 20.08.2020

TRACK o­n ROAD NO.4 OF SHIVATHAN RAILWAY STATION UP LINE RESTORED o­n 19.08.2020

Torrential rain in and around Khanapur region has seen a rise in Pandari river which triggered a mudslide near Shivathan railway station and Road No.4 at the station area beside UP loop line got washed out.  Though retaining wall at this location was constructed 3 to 5 months back, the rise in water level was so high that the track at Road No.4 got washed away.

To ensure quick restoration of track at his location monsoon Rake at Tinai Ghat station was moved to Shivathan station and essential materials like rails and Poclain from Londa.  Road No.4 at Shivathan was immediately suspended and monsoon rakes for restoration of Road 4 was dealt o­n Road no.3. o­ne Rake filled with 40 no's Rails, 01 BFR with Poclain machine and Motor Trolley with labourers was ordered from both Londa and Hubballi direction.

Shivathan Wash out location work was immediately taken up by restoration at the breach for a length of 70 meters x 20 meters width and 6 meter height where about 8000 to 9000 cum of earth had been washed out due to heavy flow in Panda river up to Road No. 4 UP loop line in the morning hours of 17.08.2020. Work of restoration started at around 11:00 am after mobilization of all the machineries, manpower, material and supervisor at site.  The embankment breach location were filled up with boulders unloaded from monsoon reserve rake and road 4 was restored o­n 19.08.2020.

Shivathan Station is not having any accessibility by road and thus mobilization of the manpower and materials for restoration was a very tedious and cumbersome task rendering it difficult to attend the restoration in incessant rainfall in the region. Batch of 60 no's of contractual labourers, 30 departmental manpower, 03 contractual supervisor and 02 Sr.Section Engineers worked in 08 hours shift for the 24 hours.

Shri Ajay Kumar Singh, General Manager/South Western Railway commended the restoration work taken up by Hubballi division and said that the section was prone to torrential rains during monsoon due to the topography of the region.  Shri Arvind Malkhede, Divisional Railway Manager/Hubballi monitored the restoration works and Shri Neeraj Bapna, Sr. Divisional Engineer/West/Hubballi had ensured supply of men and materials for restoration of track o­n a war footing.

 

                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
Press Release No. 17021-07-2020
Hubballi
Press Release No. 170, SHRI SURESH ANGADI, HON’BLE MINISTER OF STATE OF RAILWAYS REVIEWS LONDA-MIRAJ AND GADAG-HOTGI DOUBLING PROJECT

प्रेस विज्ञप्तिPress Release No. 170  Dt: 19.07.2020

SHRI SURESH ANGADI, HON’BLE MINISTER OF STATE

 OF RAILWAYS REVIEWS LONDA-MIRAJ AND GADAG-

HOTGI DOUBLING PROJECT

Shri Suresh Angadi, Hon’ble Minister of State of Railways conducted a review meeting with General Managers and other officials of South Western Railway, Central Railway and South Central Railway through Video Conference o­n 17.07.2020. 

During the meeting, Shri Angadi reviewed the progress of Miraj-Londa and Gadag-Hotgi double line project. 

The 186 Km of Londa-Miraj doubling project is being executed in 7 phases.  In Phase-I, 16 Km of doubling between Ghataprabha and Chikkodi Road has been completed and commissioned during December, 2019.

 In Phase-II, the doubling  of 31 Km between Chikkodi Road-Raybag-Chinchli-Kudachi, in Phase-III, 25 Km of Khanapur-Desur-Belagavi doubling, in Phase-IV 25 Km of Londa-Khanapur doubling, in Phase-V, 27 Km of Belagavi-Suldhal doubling, in Phase-VI, 30 Km of Suldhal- Ghataprabha doubling,  in Phase-VII, 33 Km of Kudachi-Miraj doubling works are being executed. Due to COVID-19, work has slowed down from March, 2020. Work recommenced from last week of June, 2020 with limited number of manpower, so as to maintain social distancing. 

Shri Suresh Angadi instructed the Officials to expedite this double line project along with electrification and to complete in two years.

          Road Over Bridge works at Belagavi and Raybag area were also reviewed and Hon’ble MoSR instructed to complete the works in time bound manner.   

Shri Suresh Angadi also reviewed the 284 Km doubling work of Gadag-Hotgi.  Already 115 Km of doubling has been completed.  Another 33 Km between Lachyan and Hotgi doubling is also expected to be commissioned shortly.   o­nce this 33 Km is commissioned a total 148 Km of line from Hotgi to Wandal will become double line.   Shri Suresh Angadi instructed the Officials to complete the remaining  double line work by 2022. 

Shri Ajay Kumar Singh, GM/SWR; hri K.C. Swami, Chief Administrative Officer, Construction; Shri B.G. Mallya, Principal Chief Electrical Engineer; Shri Prem Narayan, Chief Engineer, Construction and Shri T.V. Bhushan, Chief Engineer, Construction, Hubballi from South Western Railway have  attended the Video Conference.


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi