For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

KUDACHI

STATION INFO

Address: Kudchi Railway Station, Kudchi, Karnataka 591311, India

Station Code: KUD)KUDACH

Station Name: KUD)KUDACHI

Zone: SWR/South Western

Total Unique Trains: 26

Train Frequency Weekly: 131

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
11047MIRAJ UBL EXP00:4700:481M,TU,W,TH,F,SA,SUSL,GN
11048UBL MRJ EXPRESS03:5904:001M,TU,W,TH,F,SA,SUSL,GN
17318LTT HUBLI EXP05:5906:001M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51431MRJ LD PASSENGER06:4706:481M,TU,W,TH,F,SA,SUUNRESERVED
11035SHARAVATHI EXP07:1307:152TH2A,3A,SL,GN
11005PUDUCHERRY EXP07:1407:151M,F,SU2A,3A,SL,GN
11021TIRUNELVELI EXP07:1407:151TU,W,SA2A,3A,SL,GN
51462BGM MRJ PASS07:5908:001M,TU,W,TH,F,SA,SUUNRESERVED
51419MRJ UBL PASS08:0708:081M,TU,W,TH,F,SA,SUUNRESERVED
11304KOP MUGR EXPRESS09:3109:321M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51406CLR MRJ PASS10:0410:051M,TU,W,TH,F,SA,SUUNRESERVED
51461MRJ BGM PASSENGR10:2910:301M,TU,W,TH,F,SA,SUUNRESERVED
16589RANI CHENNAMMA10:4910:501M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
17415HARIPRIYA EXP13:2913:301M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
17416HARIPRIYA EXP13:5313:552M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
51432LD MRJ PASS14:5714:581M,TU,W,TH,F,SA,SUUNRESERVED
16590RANICHENNAMA EX16:0916:101M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
51464BGM MRJ PASS16:2916:301M,TU,W,TH,F,SA,SUUNRESERVED
51405MRJ CLR PASS18:0518:061M,TU,W,TH,F,SA,SUUNRESERVED
51420UBL MRJ PASS18:4918:501M,TU,W,TH,F,SA,SUUNRESERVED
11303MUGR KOP EXPRESS19:1919:201M,TU,W,TH,F,SA,SU2A,3A,SL,GN
11036SHARAVATI EXP19:4419:451SU2A,3A,SL,GN
11022CHALUKYA EXP19:4419:451M,TH,F2A,3A,SL,GN
11006CHALUKYA EXP19:4419:451TU,W,SU2A,3A,SL,GN
17317LOKAMANYA TT EXP20:0820:102M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51463MRJ BGM PASSENGR20:0920:101M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 19721-08-2020
Hubballi
Press Release No. 197, SHRI ARVIND MALKHEDE, DIVISIONAL RAILWAY MANAGER CONDUCTS PRESS CONFERENCE THROUGH VIDEO LINK

प्रेस विज्ञप्तिPress Release No. 197  Dt: 18.08.2020

SHRI ARVIND MALKHEDE, DIVISIONAL RAILWAY MANAGER CONDUCTS PRESS CONFERENCE THROUGH VIDEO LINK

Shri Arvind Malkhede, Divisional Railway Manager of Hubballi Division conducted a press conference today o­n 18.08.2020 to brief about the various achievements and good works done by the Division during COVID period through video link. Smt. E. Vijaya, Deputy General Manager and Chief Public Relations Officer was also present in the press meet.

Shri Arvind Malkhede said that during the lockdown, though passenger train services were cancelled, goods trains and parcel trains continued to run.  Railway staff like guards, loco pilots, maintenance staff, control staff and others contributed immensely in ensuring uninterrupted supply of essential commodities across the country during lockdown.  Hubballi Division has distributed groceries to coolie porters, daily wage labourers and needy people during lockdown.   It has also distributed more than 76 thousand meals to the needy during lock down.  Hubballi Division has handled  188 rakes of fertilizers equal to 47 lakh quintals and  230 rakes of food grains equal to  57 lakh quintals during this period.

Hubballi Division has run 21 Shramik Specials carrying 30 thousand migrant workers and overall SWR has run 267 Shramik Specials enabling 3.9 lakh migrant people to reach their home.  He said that the Division has manufactured 15,397 face masks and 6090 litres of hand sanitizers for the use of railway staff.   Hubballi Division has converted 35 ICF coaches in to Isolation coaches for COVID patients.  Overall in SWR 320 coaches were converted as Isolation coaches, he said.    o­n a question from the media about utilization of these coaches for COVID patients, he said that the COVID care coaches will be provided upon request from the state government/district administration. o­n a question about resumption of passenger train services, he said that decision in such matter will be taken by the Ministry of Railways in consultation with Ministry of Home Affairs and Ministry of Health. 

Many major works have been completed during COVID period. Remodeling work of Hosapete, a major yard for train operations, has been completed during the COVID period. Yard remodeling has enabled simultaneous reception/dispatch of trains from both directions. This gives flexibility in train operations. Another major work completed by Hubballi Division during COVID period is Kudgi Canal Crossing work of Krishna Bhagya Jal Nigam Ltd. (KBJNL).  This has enabled in irrigating 1.66 Lakh hectares of land and benefitted large number of farmers. Lachyan-Hotgi (33 Km) doubling with 670 m long Bhima Bridge has been completed during the period.  28 Km new line between Gangavati and Karatagi has also been completed.  Hubballi Division has taken up speed enhancement work over the division.  Sectional speed between Majorda and Vasco Da Gama is increased from 75 KMPH to 100 KMPH. Permanent Speed Restrictions have been removed at six locations over Hubballi-Londa section by carrying out upgradation works.  Speed between Ghataprabha and Chikkodi road station has been enhanced to 110 KMPH.

 Doubling works are going o­n in full swing. 16.39 KM doubling between Unkal and Dharwad is expected to be completed by September 2020.   Doubling work is going o­n in various sections.  The doubling work of Gadag to Hole Alur is expected to be completed by January 2021. Doubling between Chikkodi Road-Kudachi is likely to  be completed by December, 2020.  He said that station redevelopment works are being taken up in the Hubballi Division.  Bagalkot, Vijayapura, Dharwad, Belagavi, Hosapete station buildings are being reconstructed.  A new goods shed at Khajjidoni is being developed.  New Goods Shed at Navanagar in Bagalkot, Aliyabad in Vijayapura are also being constructed.  Electrification work between Kariganur-Harlapur is completed. 

He said that Business Development Unit has been set up in the Division to capture additional freight. The BDU has conducted 10 meetings through Video Conference and direct meetings so far. As a result the Division has been able to get new stream of traffic viz., Bauxite, Metallurgical coke, fly ash, pig iron and rice.  o­n the occasion, Shri Arvind Malkhede highlighted about various incentive schemes offered by the Railways for freight customers.   He said that for round trip freight loading, i.e. if a consignor commits to transport ‘A’ class goods in a particular direction, and ‘B’ class goods in the return direction, the consignor will be offered a discount. Similarly, concessions are also being given to short lead traffic, long lead traffic and traffic in traditional empty flow direction. 

 

                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
Press Release No. 17021-07-2020
Hubballi
Press Release No. 170, SHRI SURESH ANGADI, HON’BLE MINISTER OF STATE OF RAILWAYS REVIEWS LONDA-MIRAJ AND GADAG-HOTGI DOUBLING PROJECT

प्रेस विज्ञप्तिPress Release No. 170  Dt: 19.07.2020

SHRI SURESH ANGADI, HON’BLE MINISTER OF STATE

 OF RAILWAYS REVIEWS LONDA-MIRAJ AND GADAG-

HOTGI DOUBLING PROJECT

Shri Suresh Angadi, Hon’ble Minister of State of Railways conducted a review meeting with General Managers and other officials of South Western Railway, Central Railway and South Central Railway through Video Conference o­n 17.07.2020. 

During the meeting, Shri Angadi reviewed the progress of Miraj-Londa and Gadag-Hotgi double line project. 

The 186 Km of Londa-Miraj doubling project is being executed in 7 phases.  In Phase-I, 16 Km of doubling between Ghataprabha and Chikkodi Road has been completed and commissioned during December, 2019.

 In Phase-II, the doubling  of 31 Km between Chikkodi Road-Raybag-Chinchli-Kudachi, in Phase-III, 25 Km of Khanapur-Desur-Belagavi doubling, in Phase-IV 25 Km of Londa-Khanapur doubling, in Phase-V, 27 Km of Belagavi-Suldhal doubling, in Phase-VI, 30 Km of Suldhal- Ghataprabha doubling,  in Phase-VII, 33 Km of Kudachi-Miraj doubling works are being executed. Due to COVID-19, work has slowed down from March, 2020. Work recommenced from last week of June, 2020 with limited number of manpower, so as to maintain social distancing. 

Shri Suresh Angadi instructed the Officials to expedite this double line project along with electrification and to complete in two years.

          Road Over Bridge works at Belagavi and Raybag area were also reviewed and Hon’ble MoSR instructed to complete the works in time bound manner.   

Shri Suresh Angadi also reviewed the 284 Km doubling work of Gadag-Hotgi.  Already 115 Km of doubling has been completed.  Another 33 Km between Lachyan and Hotgi doubling is also expected to be commissioned shortly.   o­nce this 33 Km is commissioned a total 148 Km of line from Hotgi to Wandal will become double line.   Shri Suresh Angadi instructed the Officials to complete the remaining  double line work by 2022. 

Shri Ajay Kumar Singh, GM/SWR; hri K.C. Swami, Chief Administrative Officer, Construction; Shri B.G. Mallya, Principal Chief Electrical Engineer; Shri Prem Narayan, Chief Engineer, Construction and Shri T.V. Bhushan, Chief Engineer, Construction, Hubballi from South Western Railway have  attended the Video Conference.


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search