For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

NALHATI JN

STATION INFO

Address: Nalhati, West Bengal, India

Station Code: NHT)NALHATI J

Station Name: NHT)NALHATI JN

Zone: ER/Eastern

Total Unique Trains: 47

Train Frequency Weekly: 267

Station Traffic: High

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
13148UTTAR BANGA EXP00:2800:302M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13119SDAH ANVT EXP01:3401:362TH,SU3A,SL,GN
13133SDAH BSB EXP01:3401:362M,TU,W,F,SA3A,SL,GN
53044RGD HWH PASS02:5602:582M,TU,W,TH,F,SA,SUUNRESERVED
13027KAVI GURU EXP02:5803:002M,TU,W,TH,F,SA,SUSL,GN
13153GOUR EXPRESS03:2003:222M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
53076BHW RPH PASS03:4103:432M,TU,W,TH,F,SA,SUUNRESERVED
13403VANANCHAL EXP04:2504:272M,TU,W,TH,F,SA,SU2A,3A,SL,GN
53137RPH BHW PASS04:5604:571M,TU,W,TH,F,SA,SUUNRESERVED
13120ANVT SDAH EXP05:0605:082TU,SA3A,SL,GN
13134BSB SDAH EXPRESS05:0605:082M,TU,TH,F,SA3A,SL,GN
53403RPH GAYA PASS05:5605:582M,TU,W,TH,F,SA,SUUNRESERVED
13012MLDT HWH INT EXP06:3206:331M,TU,W,TH,F,SA,SUCC,2S,GN
73021AZ RPH DEMU06:4206:442M,TU,W,TH,F,SAUNRESERVED
53023AZ RPH PASS07:0507:072M,TU,W,TH,F,SA,SUUNRESERVED
53074SBG RPH PASS07:4107:421M,TU,W,TH,F,SA,SUUNRESERVED
53405RPH SBG PASS07:4607:471M,TU,W,TH,F,SA,SUUNRESERVED
53417BWN MLDT PASS08:0008:011M,TU,W,TH,F,SA,SUUNRESERVED
13028KAVI GURU EXP08:5408:562M,TU,W,TH,F,SA,SUSL,GN
53008RPH KWAE PASS09:1809:202M,TU,W,TH,F,SA,SUUNRESERVED
53063BWN TPH PASS09:3209:342M,TU,W,TH,F,SA,SUUNRESERVED
13017GANADEVTA EXP10:3110:332M,TU,W,TH,F,SA,SUCC,2S,GN
53025AZ RPH PASS10:4010:422M,TU,W,TH,F,SA,SUUNRESERVED
53138BHW RPH PASS11:1311:152M,TU,W,TH,F,SA,SUUNRESERVED
53007KWAE RPH PASS12:5913:012M,TU,W,TH,F,SA,SUUNRESERVED
53041HWH JYG PGR13:2613:282M,TU,W,TH,F,SA,SUUNRESERVED
53042JYG HWH PASS14:1614:182M,TU,W,TH,F,SA,SUUNRESERVED
53034RPH AZ PASS16:0216:042M,TU,W,TH,F,SA,SUUNRESERVED
53064BHW BWN PASS16:0816:102M,TU,W,TH,F,SA,SUUNRESERVED
53043HWH RGD PASS16:2416:262M,TU,W,TH,F,SA,SUUNRESERVED
13018GANADEVTA EXP16:4616:482M,TU,W,TH,F,SA,SUCC,2S,GN
53418MLDT BWN PASS17:3917:412M,TU,W,TH,F,SA,SUUNRESERVED
53026RPH AZ PASS18:0818:135M,TU,W,TH,F,SA,SUUNRESERVED
53031AZ RPH PASS19:4319:463M,TU,W,TH,F,SA,SUUNRESERVED
73022RPH AZ DEMU19:4719:492M,TU,W,TH,F,SUUNRESERVED
13011HWH MLDT INT EX20:0020:011M,TU,W,TH,F,SA,SUCC,2S,GN
53073RPH SBG PASS21:0021:022M,TU,W,TH,F,SA,SUUNRESERVED
53408JMP RPH PASS21:2321:241M,TU,W,TH,F,SA,SUUNRESERVED
53406SBG RPH PASS22:1622:182M,TU,W,TH,F,SA,SUUNRESERVED
53024RPH AZ PASS22:4222:464M,TU,W,TH,F,SA,SUUNRESERVED
13404VANANCHAL EXP23:1323:152M,TU,W,TH,F,SA,SU2A,3A,SL,GN
53075RPH BHW PASS23:1623:182M,TU,W,TH,F,SA,SUUNRESERVED
23154GOUR EXP23:4123:432M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13154GOUR EXP23:4123:432M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
73033AZ NHT PASS23:45Des--M,TU,W,TH,F,SA,SUUNRESERVED
13147UTTAR BANGA EXP23:5023:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure
73034NHT AZ PASSSrc05:24--M,TU,W,TH,F,SA,SUUNRESERVED



RECENT NEWS

1
05-03-2021
Press Release:REGULATION OF TRAINS FOR PRE- NON INTERLOCKING / NON INTERLOCKING WORK IN CONNECTION WITH DOUBLING BETWEEN KATWA& GANGATIKURI AND BAZARSAU & KARNASUBARNA STATIONS



REGULATION OF TRAINS FOR PRE- NON INTERLOCKING / NON INTERLOCKING WORK IN CONNECTION WITH DOUBLING  BETWEEN KATWA& GANGATIKURI AND BAZARSAU & KARNASUBARNA STATIONS.

Kolkata, March 04, 2021:

      In connection with doubling work between Katwa & Gangatikuri and Bazarsau & Karnasubarna stations, 12 days Pre-Non Interlocking  and 04 days Non Interlocking  at Katwa station,  01 day Pre- Non Interlocking  and 03 days Non Interlocking  at Gangatikuri station, 05 days Pre- Non Interlocking  and 02 days Non Interlocking  at Karnasubarna station and 04 days Pre- Non Interlocking  and 02 days Non Interlocking  at Chowrigachha  station will be simultaneously done from 05.03.2021 (Friday) to 20.03.2021 (Saturday) with following train arrangements :

I.EMU Train Arrangement : • Cancellation : (1) From 05.03.2021 (Friday) to 19.03.2021 (Friday) [Excluding o­n 13.03.2021(Saturday)]  : From Bandel – 37753. From Katwa – 37922, 37746, 37748 and 37754. (2) o­n 13.03.2021(Saturday) : From Howrah –  37915, 37919, 37925 and 37927. From Bandel – 37749, 37751 and 37755. From Katwa – 37922, 37746, 37748, 37924, 37926 (but will short originated from Bandel), 37750, 37752 and 37928. (3) o­n 14.03.2021(Sunday) : From Katwa – 37912, 37742 and 37914. • Short Termination & Short Origination from 05.03.2021 (Friday) to 19.03.2021 (Friday) [Excluding o­n 13.03.2021(Saturday)] : (1) 37747 will be short terminated at Dainhat and will be short originated as Passenger Special for Bandel at 11.20 hrs. (2) 37913 (rescheduled from Howrah, departure time 08.30 hrs.) will be short terminated at Dainhat and will be short originated as Passenger Special for Bandel at 13.08 hrs. from Dainhat. (3) 31111 will be short terminated at Dainhat and will be short originated as 31112 at 15.58 hrs. • Short Termination & Short Origination o­n 13.03.2021 (Saturday) : (1) 37747 will be short terminated  at Dainhat and will be short originated as Passenger Special for Bandel at 11.20 hrs. (2) 37913 (rescheduled from Howrah, departure time 08.30 hrs.) will be short terminated at Dainhat and will be short originated as Passenger Special for Bandel at 13.08 hrs. from Dainhat. (3) 31111 will be short terminated at Dainhat and will be short originated as 31112 at 15.57 hrs. (4) 37753 will be short terminated at Dainhat and 37754 will be short originated from Dainhat. (5) 37921 will be short terminated at Dainhat and will be short originated as 37756 at 20.57 hrs. (6) 37923 will be short terminated at Dainhat and will be short originated as 37758 at 22.07 hrs. (7) 37917 will be short terminated at Bandel. (8) 37926 will be short originated from Bandel. • Rescheduling from 05.03.2021 (Friday) to 19.03.2021 (Friday) [Excluding o­n 13.03.2021(Saturday)] : (1) 37913 will leave Howrah at 08.30 hrs. instead of its departure time at 08.00 hrs. (2) 37915 will leave Howrah at 11.00 hrs. instead of its departure time at 10.00 hrs. (3) 37750 will leave Katwa at 17.50 hrs. instead of its departure time at 17.35 hrs. 
• Rescheduling o­n 13.03.2021 (Saturday) : 37913 will leave Howrah at 08.30 hrs. instead of its departure time at 08.00 hrs. • Controlling from 05.03.2021 (Friday) to 19.03.2021 (Friday) [Excluding o­n 13.03.2021(Saturday)] :  37749 will be controlled for 15 minutes enroute. • Passenger Special from 05.03.2021 (Friday) to 19.03.2021 (Friday) :  Down Passenger Special for Howrah will leave Katwa at 09.50 hrs. 

II. Arrangement of Azimganj - Katwa and Katwa - Ahmedpur Passenger train : • Cancellation from 05.03.2021 (Friday) to 20.03.2021 (Saturday) :  From Azimganj  – 53006, 53014, 63032 and 63020. From Katwa –  53005, 53011, 63031 and 63019. • Cancellation from 05.03.2021 (Friday) to 21.03.2021 (Sunday) : From Katwa – 03055. From Ahmedpur – 03056. • Short Termination and Short Origination from 05.03.2021 (Friday) to 21.03.2021 (Sunday) : 03060 will be short terminated  at Azimganj and 03059 will be short originated from Azimganj instead of Katwa. • The following Passenger Special trains with MEMU rake and stoppage at all stations enroute, will run in between Azimganj and Katwa : (1) From 05.03.2021 (Friday) to 20.03.2021 (Saturday) [Excluding 13.03.2021 (Saturday)] :  From Azimganj – Dep. 04.40 hrs., 07.30 hrs. and 16.40 hrs. From Katwa  – Dep. 07.30 hrs., 15.55 hrs. and 19.20 hrs. (2) o­n 13.03.2021 (Saturday) :  From Azimganj – Dep. 04.40 & 07.30 hrs.  From Katwa –  Dep. 07.30 hrs. 

III.Arrangement of Mail/Express trains : • Diversion : The  following  trains  will  be  diverted  via  Bandel – Barddhaman – Rampurhat – Nalhati – Azimganj  with  stoppage  at  Ahmedpur, Rampurhat and Nalhati o­n Up and Dn Direction accordingly : (1) 03141 Sealdah – New Alipurduar Festival Express (Journey commencing 10.03.2021 to 20.03.2021). (2) 03142 New Alipurduar – Sealdah Festival Express (Journey commencing o­n10.03.2021 to 20.03.2021). (3) 03163 Hatebazara  Express (Journey commencing o­n10.03,  12.03, 13.03, 14.03, 15.03, 17.03, 19.03 and 20.03.2021). (4) 03164 Hatebazara Express (Journey commencing o­n11.03, 13.03, 14.03, 15.03, 16.03, 18.03 and 20.03.2021). (5) 03169 Hatebazare Express (Journey commencing o­n 11.03, 16.03, and 18.03.2021). (6) 03170 Hatebazare Express (Journey commencing o­n10.03, 12.03, 17.03 and 19.03.2021). (7) 05959 Howrah – Dibrugarh Special Express (Journey commencing o­n 13.03.2021). (8)  05960 Dibrugarh – Howrah Special (Journey commencing o­n 12.03.2021). (9) 03145 Kolkata – Radhikapur Special Express (Journey commencing o­n 13.03.2021). (10)  03146  Radhikapur – Kolkata Special Express (Journey commencing o­n 13.03.2021). • Cancellation : (1) 03466 Malda – Howrah Special Express (Journey commencing o­n 10.03.2021 to 20.03.2021) and 03465 Howrah – Malda Special Express  (Journey commencing o­n10.03.2021 to 20.03.2021). (2) 03422 Malda – Nabadwip Dham Special Express (Journey commencing o­n 09.03.2021 to 20.03.2021) and 03421 Nabadwip Dham – Malda Special Express (Journey commencing o­n10.03.2021 to 21.03.2021).

 IV. Additional Train Arrangement from 17.03.2021 (Wednesday) to 20.03.2021 (Saturday).
• Cancellation : (1) From Howrah : 37919, 37925 and 37927 (from 17.03.2021 to 20.03.2021) and 37913 (on 20.03.2021). (2) From Bandel :  37753 (from 17.03.2021 to 20.03.2021). From Katwa : 37928, 37912, 37914, 37754 (from 17.03.2021 to 20.03.2021) and 37926 (on 20.03.2021) . Passengers are requested to follow the Public Address System of stations. InconveNon Interlockingence is regretted.




2
09-02-2021
Press Release:EASTERN RAILWAY ACHIEVED 100 % ELECTRIFICATION OVER ITS JURISDICTION



EASTERN RAILWAY ACHIEVED 100 % ELECTRIFICATION OVER ITS JURISDICTION 

Kolkata, February 06, 2021:


Successful Loco trial run of the Nimtita – New Farakka section ( Route Kilometer  24 )  has been completed o­n February 04, 2021. It was the fifth phase of the Nalhati – Azimganj, Katwa- Azimganj & Azimganj- New Farakka electrification project.
   
Previously the first phase of the electrification of the Azimganj- Nalhati section  ( Route Kilometer 45.07), the second phase i.e. Katwa - Azimganj section  ( Route kelometer 70), the third phase i.e. Azimganj- Manigram section ( Route kelometer 20) and the fourth phase i.e.  Manigram-Nimtita section including both Sagardighi thermal Power Station and Sonar Bangla Cement Siding ( Route kelometer 35) have been completed .

With the electrification Nimtita- New Farakka section, Eastern Railway achieved 100 % electrification in Nalhati_ Azimganj, Katwa- Azimganj and Azimganj- New Farakka sections. With the electrification of these sections, Eastern Railway achieved fully electrified route kelometer over its jurisdiction.

100 % electrification over Eastern Railway has provided faster and hassle free train operation and enabled railway to transport freight and passenger traffic with much greater ease. Electrification has also provided environment friendly mode of transportation. It led to  savings in Diesel consumption and facilitate unit traction system with reduced carbon footprint.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search