For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

MAKSI

STATION INFO

Address: Maksi, Madhya Pradesh 465106, India

Station Code: MKC)MAKS

Station Name: MKC)MAKSI

Zone: WR/Western

Total Unique Trains: 68

Train Frequency Weekly: 211

Station Traffic: High

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
11102GWL PUNE EXP01:0501:072SA2A,3A,SL,GN
19326ASR INDB EXPRESS01:0501:072W,SA2A,3A,SL,GN
19304BPL INDB EXPRESS01:4501:472M,TU,W,TH,F,SA,SU3A,SL,GN
19302YPR DADN EXP02:0202:042W2A,3A,SL,GN
19303INDB BHOPAL EXP02:0902:112M,TU,W,TH,F,SA,SU3A,SL,GN
04119ALD DADN SPL02:2002:222TH2A,3A,SL,GN
11803JHS BDTS EXP03:4003:422SU2A,3A,SL,GN
14318DDN INDB EXP03:4003:422F,SA2A,3A,SL,GN
11103JHS BDTS EXP03:4003:422M,SU3A,SL,GN
12914TRISHATABDI EXP03:5103:521M2A,3A,SL,GN
12924NGP INDORE EXP04:0504:072W2A,3A,SL,GN
11465SMNH JBP EXPRES04:5404:562M,SA1A,2A,3A,SL,GN
11463SMNH JBP EXPRES04:5404:562TU,W,TH,F,SU1A,2A,3A,SL,GN
21126BIX RTM EXP05:0005:022W,SA,SU2A,3A,SL,GN
21801JHS RTM LINK EX05:0005:022M,TU,TH,F3A,SL,GN
11126GWL RTM EXPRESS05:0005:022M,TU,TH,F2A,3A,SL,GN
22909BL PURI S F EXP05:3805:391TH2A,3A,SL,GN
19167SABARMATI EXP06:5306:552M,TU,TH,SA2A,3A,SL,GN
19165SABARMATI EXP06:5306:552W,F,SU2A,3A,SL,GN
18234NARMADA EXP PSG07:0207:042M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
59379INDB MKC PASS07:25Des--M,TU,W,TH,F,SA,SUUNRESERVED
19323INTERCITY EXP08:0508:061M,TU,W,TH,F,SA,SUCC,2S,GN
19711JP BPL EXP08:1808:202M,TU,W,TH,F,SA,SU2A,3A,SL,2S,GN
15045GKP OKHA EXPRES08:2008:222TH2A,3A,SL,GN
14310UJJAIYANI EXP08:2008:222TU,W2A,3A,SL,GN
19054MFP ST EXPRESS08:2008:222SU3A,SL,GN
22192JBP INDB EXP08:2808:302M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
19307CHANDIGARH EXP08:5809:002TH2A,3A,SL,GN
19603AII RMM HUMSAFAR09:1009:122SA3A
22910PURI VALSAD EXP09:2409:262SU2A,3A,SL,GN
59320BPL UJJAIN PASS09:5910:001M,TU,W,TH,F,SA,SUSL,GN
12920MALWA EXPRESS10:0910:101M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59386PANCHVALLEY PA11:3411:362M,TU,W,TH,F,SA,SUFC,3A,SL,GN
59393DHD HBJ FAST PAS12:1212:142M,TU,W,TH,F,SA,SUCC,2S,GN
19604AJMER HUMSAFAR12:1312:152TU3A
59342BINA NAD PASS12:2012:222M,TU,W,TH,F,SA,SUUNRESERVED
22983KOTA INDB SF EXP12:4812:502M,TU,W,TH,F,SA,SUCC,2S,GN
19308CDG INDB EXP14:1014:122F2A,3A,SL,GN
12919MALWA EXPRESS14:4014:411M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59385PANCHVALLEY PASS14:5214:531M,TU,W,TH,F,SA,SU3A,SL,GN
59341NAD BINA PASS14:5815:002M,TU,W,TH,F,SA,SUUNRESERVED
04120DADN ALD SPL15:1615:182F2A,3A,SL,GN
59394HBJ DHD FAST PAS15:2915:301M,TU,W,TH,F,SA,SUCC,2S,GN
14309UJJAINI EXPRESS15:4815:502W,TH2A,3A,SL,GN
15046GORAKHPUR EXP15:4815:502SU2A,3A,SL,GN
19053ST MFP EXPRESS15:4815:502F3A,SL,GN
19166SABARMATI EXP17:0517:072M,W,SA2A,3A,SL,GN
19168SABARMATI EXP17:0517:072TU,TH,F,SU2A,3A,SL,GN
22984INDB KOTA SF EXP17:0817:102M,TU,W,TH,F,SA,SUCC,2S,GN
11101PUNE GWALIOR EXP17:4017:422M2A,3A,SL,GN
19325IND AMRITSAR EXP17:4017:422TU,F2A,3A,SL,GN
14317IND DDN EXPRESS17:4017:422SA,SU2A,3A,SL,GN
59319UJN BPL PASS18:0018:022M,TU,W,TH,F,SA,SUUNRESERVED
11104BDTS JHANSI EXP18:1518:172TU,W3A,SL,GN
11804BDTS JHANSI EXP18:1518:172TU2A,3A,SL,GN
19712BPL JAIPUR EXP19:1119:121M,TU,W,TH,F,SA,SU2A,3A,SL,2S,GN
19324INDB INTERCITY19:2419:251M,TU,W,TH,F,SA,SUCC,2S,GN
22191INDB JBP EXP20:1020:122M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
18233NARMADA EXPRESS20:2820:302M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
11464JBP SOMNATH EXP21:2121:232TU,W,TH,F,SU1A,2A,3A,SL,GN
11466JBP SOMNATH EXP21:2121:232M,SA1A,2A,3A,SL,GN
12913TRISHATABDI EXP23:0023:022SU2A,3A,SL,GN
12923INDB NAGPUR EXP23:0023:022TU2A,3A,SL,GN
21125INDORE BHIND EXP23:1523:172TU,F,SA2A,3A,SL,GN
21802RTM JHS LINK EX23:1523:172M,W,TH,SU3A,SL,GN
11125RTM GWALIOR EXP23:1523:172M,W,TH,SU2A,3A,SL,GN
19301YESHVANTPUR EXP23:2223:231SU2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure
59380MAKSI INDB PASSSrc10:30--M,TU,W,TH,F,SA,SUUNRESERVED



RECENT NEWS

1
WR Press Release No.2020/ 8 02-09-2020
MUMBAI
WESTERN RAILWAY INSTALLED ROOFTOP SOLAR PANELS OF 5601.69 KWp CAPACITY AT 75 STATIONS

                                                                                      

WESTERN RAILWAY INSTALLED ROOFTOP SOLAR PANELS OF 5601.69 KWp CAPACITY AT 75 STATIONS

 

 

 

 

 

 

 

 

 

 

Photo caption :- A view of the solar power panels installed o­n rooftop of a railway station.

In order to achieve the objective of Indian Railways to become 100% self sustainable for all it's power needs and also to contribute to national solar power goals, Western Railway has solarised its 75 stations till date. The use of solar power will accelerate the Railway's mission to achieve the goal of becoming “Net Zero Carbon Emission Railway”before 2030.

According to a press release issued by Shri Sumit Thakur - Chief Public Relations Officer of Western Railway, suitable Rooftop Solar Panels have been installed at 75 stations over Western Rly. 8.67 MWpcapacity rooftop solar plants have been provided at various railway stations and office buildings. These plants have been commissioned and connected to grid and as a result, there is a saving ofRs. 3 crore is accrued during the financial year.

Shri Thakur informed that Solar Plants have been installed at 22 stations in Mumbai Division, 34 stations in Ratlam Division, 6 stations of Vadodara Division & 8 stations in Rajkot Division. Similarly, in Ahmedabad Division, solar plants have been installed at Sabarmati & Ambli Road stations as well as Ahmedabad station building whereas in Bhavnagar Division at Bhavnagar station & Somnath station building. In Mumbai Division, the rooftop Solar Plants have been installed at Churchgate, Grant Road, Matunga Road, Andheri, Mumbai Central, Lower Parel, Mahim, Khar Road, Santacruz, Ram Mandir, Malad, Kandivali, Borivali, Dahisar, Mira Road, Bhayander, Naigaon, Vasai Road, Nallasopara, Dahanu Road stations, while atDadar as well as at Bandra Terminus, station buildings & platforms. In Ratlam Division, rooftop Solar Plants have been installed at Chanderiya, Nimbhera, Gambhiri, Jawad Road, MangliyaGaon, Ajnod, Lakshmibai Nagar, Ranyal, Jasmiya, Pipliya, Mandsaur, Nauganwan, Runija, Bangrod, Sehore, Kalapipla, Pachwan, Maksi, Vikramnagar station buildings, Indore, Ujjain, Dewas, Chittaurgadh, Meghnagar, Bajrangarh, Fatehabad, Gautampura, Dr. Ambedkar Nagar (Mhow), Nagda, Nimach, Jaora,Badnagar, Shujalpur, Kachrod stations and at Ratlam station building & platforms. In Vadodara Division, the rooftop Solar Plants have been installed at Vadodara, Od, Makarpura, Varnarna, Sadhanpura station buildings and at Godhra staton building & platforms. In Rajkot Division, the rooftop Solar Plants have been installed at Rajkot, Okha, Jamnagar, Chamaraj, Lakhamachi, Modpur, Lakhabawal and Pipli stations.

It is worth mentioning that Indian Railways is set to produce solar energy for meeting all it's energy consumption needs of more than 33 billion units by 2030. Current annual requirement is about 20 billion units. Indian Railways has a mega plan for installing solar plants of 20 GW capacity by 2030 by utilizing its vacant land. About 51,000 hectares of vacant land is available with Indian Railways and is now ready to extend all support to the developers for installing solar power plants o­n Railway’s vacant un-encroached land. It may be noted that Railways is also set to achieve 100% electrification by the year 2023 and is committed to utilize solar energy for meeting its traction power requirement and become a complete ‘Green mode of transportation’. This is in line with the recent directive of Hon’ble Prime Minister to solarise railway stations and utilize vacant railway land for Renewable Energy (RE) projects.

******

 

 





2
No.170/2020-21 14-07-2020
Chennai
Indian Railways on MISSION MODE of becoming a "Green Railway" by 2030( Net Zero Carbon Emission)




 Electrification of all routes o­n Broad Gauge  by December 2023

Solar and wind energy to power the Railway electricity grid in a big way

Indian Railways has completed electrification of more than 40,000 RKM (63% of BG routes)

 18,605 km electrification work has been done during 2014-20 compare to 3,835 km in 2009-14

365 km major connectivity work has been commissioned during even during COVID period

100 MW of Solar plants have been commissioned o­n roof-tops of various buildings including 900 stations; 400 MW are under different stages of execution

Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants

One project of 1.7 MW at Bina  in collaboration with BHEL has already been installed

In the Wind Energy sector, 103 MW wind-based power plants have already been commissioned; planned to set up 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka

100 per cent LED illumination of buildings and stations

Total 505 pairs of trains have been converted to HOG, unleashing approx 70 million liter diesel/ Rs 450 crore per annum potential of saving

A total of 69,000 coaches have been fitted with 2, 44,000 bio-toilets in Indian Railways


Ministry of Railways, with a goal of transforming Indian Railways into Green Railways by 2030 has taken a number of major initiatives towards mitigation of global warming and combating climate change. Railway Electrification, improving energy efficiency of locomotives & trains and fixed installations, green certification for installations/stations, fitting bio toilets in coaches and switching to renewable sources of energy are parts of its strategy of achieving net zero carbon emission.

Indian Railways has completed electrification of more than 40,000 Route km (RKM) (63% of BG routes) in which 18,605 km electrification work has been done during 2014-20. Previously, o­nly 3,835 km electrification work was completed during the period 2009-14. Indian Railways has fixed a target of electrification of 7000 RKM for the year 2020-21. All routes o­n BG network have been planned to be electrified by December 2023. Indian Railways is focusing o­n electrification of last mile connectivity & missing links. With this in mind 365 km major connectivity work has been commissioned during COVID period.

Major connectivity commissioned during COVID  period like Katni-Satna section (99 RKM) of Mumbai-Howrah via Allahabad route has been commissioned providing an alternate route to Howrah. Likewise, Pachore-Maksi (88 RKM) section o­n Indore - Guna-Bina route has also been commissioned providing an alternate route to Maksi-Bhopal-Bina. o­n Howrah/Sealdah-SVD Katra via Patna route, Bhagalpur-Shivnarayanpur (45 RKM) section has been commissioned.  o­n the route connecting Kariakal port to coal, fertilizer & steel plants of Tamil Nadu & Andhra Pradesh, Thiruvarur - Karaikal port (46 RKM) section has been commissioned providing port connectivity to Erode, Coimbatore & Palghat.

Indian Railways has also taken a number of initiatives to promote solar energy. Indian Railways is working to harness the potential of 500 Mega Watt (MW) energy through roof top Solar panels (Developer model). Till date, 100 Mega Watt (MW) of solar plants have been commissioned o­n roof-tops of various buildings including 900 stations. Solar plants with a combined capacity of 400 MW are under different stages of execution. Tenders are already awarded for 245 MW and target for completion of these plants is December 2022.  

Besides this, Indian Railways is trying to produce power from land Based Solar installations for running trains. Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants. The Solar power so generated will be fed to Central / State Grid or directly to 25 kV AC traction system.  Railway Energy Management Company Limited (REMCL), a Joint Venture Company of Indian Railways (49 % Equity) and RITES Limited (51 % Equity), has been mandated for proliferation of taking up land based project.

One project of 1.7 MW at Bina (Madhya Pradesh) in collaboration with Bharat Heavy Electricals Limited (BHEL) has already been installed and is presently under extensive testing. This is First of its kind of solar project in the world.

Initially for the Land Based Solar Projects, Indian Railways has taken up 3 GW Solar Project in three phases. In phase I tender has been floated under developer model o­n 29th April 2020 for 1.6 GW capacities in railway plots for open access states. In Phase II, 400 MW capacities in railway plots will be developed for non open access States under ownership model of REMCL (captive use). For this tender has floated o­n 16th June 2020. In Phase III 1 GW capacity in railway plots along the tracks under developer model will be installed for open access States for which tender has been floated o­n 1st July2020.

In the wind energy sector, 103 MW wind-based power plants have already been commissioned. Among them, 26 MW is in Rajasthan (Jaisalmer), 21 MW is in Tamil Nadu and 56.4 MW is in  Maharashtra (Sangli). Indian Railways has also planned to set up 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka.  

Realizing its role in climate change Indian Railways has started other Green Initiatives like 100 per cent LED illumination of buildings and stations. Indian Railways has also acquired Green Certification from CIII to 7 Production Units (PUs), 39 Workshops, 6 Diesel sheds and 1 Stores depot. 14 Railway Stations and 21 other buildings/ campuses have also been Green certified. Other than this 215 Stations have been certified with Environment Management System (EMS)/ISO 14001.

Total 505 pairs of trains have been converted to Head o­n Generation(HOG), unleashing approx 70 million liter diesel/ Rs 450 crore per annum potential of saving.  Energy Efficiency Studies of all 8 Production Units & 12 workshops have been completed under MOU with CII resulting in 15% improvement in energy efficiency.

In the field of Green Initiatives a total of 69,000 coaches have been fitted with more than 2,44,000 bio-toilets in Indian Railways.

***

PIB Courtesy 


(D. Om Prakash Narayan)
Sr.PRO







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search