For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

SHAHGANJ JN

STATION INFO

Address: Shahganj Jn, Nawab Yousuf Road, Shahganj, Uttar Pradesh 223101, India

Station Code: SHG)SHAHGANJ J

Station Name: SHG)SHAHGANJ JN

Zone: NR/Northern

Total Unique Trains: 65

Train Frequency Weekly: 226

Station Traffic: High

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
11053LTT AZAMGARH EXP00:1500:238W2A,3A,SL,GN
18191UTSARG EXP00:4001:0525M,TU,W,TH,F,SA,SU2A,3A,SL,GN
14235BSB BE EXPRESS00:5000:522M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
15053CPR LJN EXP01:4801:535M,TU,W,TH,F,SA,SU2A,3A,SL,GN
18192UTSARG EXP01:5002:1525M,TU,W,TH,F,SA,SU2A,3A,SL,GN
22104FD LTT SF EXP02:2202:242TU1A,2A,3A,SL,GN
16794SHRADDHA SETHU02:2202:242W1A,2A,3A,SL,GN
15026ANVT MAU EXP02:5503:2530M,F2A,3A,SL,GN
19054MFP ST EXPRESS03:2003:4525SU3A,SL,GN
15054LJN CPR EXP03:3003:355M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13151JAMMU TAWI EXP04:2604:315M,TU,W,TH,F,SA,SU2A,3A,SL,GN
55164ARJ SHG SPL04:45Des--M,TU,W,TH,F,SA,SUUNRESERVED
14236BE BSB EXPRESS05:0605:082M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
54110FD DDU PASS06:0006:055M,TU,W,TH,F,SA,SUUNRESERVED
54333BSB LKO PASS06:0306:052M,TU,W,TH,F,SA,SUUNRESERVED
19165SABARMATI EXP06:4007:1030W,F,SU2A,3A,SL,GN
19167SABARMATI EXP06:4006:455M,TU,TH,SA2A,3A,SL,GN
11054AMH LTT EXP07:0507:1510F2A,3A,SL,GN
18104JALIANWALA B EX07:0807:102W,F2A,3A,SL,GN
15116LOK NAYAK EXP07:1007:155SU2A,3A,SL,GN
13307GANGASUTLEJ EXP07:5007:555M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12226KAIFIYAT EXP08:0008:2525M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
14018SADBHAVNA EXP08:1308:152W2A,3A,SL,GN
14854MARUDHAR EXPRES08:1308:152M,TH,SA2A,3A,SL,2S,GN
13509ASN GD EXPRESS08:2008:4525TU3A,SL,GN
18103JALIANWALA B EXP09:3509:372M,W2A,3A,SL,GN
15716GARIB NAWAJ EXP10:0410:2925M,TU,TH1A,3A,SL,GN
14650SARYUYAMUNA EXP10:5511:2025M,W,SA2A,3A,SL,GN
14214GD BSB INTERCITY11:1411:162M,TU,W,TH,F,SA,SUCC,GN
55137BUI SHG PASS11:15Des--M,TU,W,TH,F,SA,SUUNRESERVED
13484FARAKKA EXPRESS11:4711:514TU,TH,F,SU2A,3A,SL,GN
11056GODAN EXPRESS12:0012:1010TU,W,F,SU2A,3A,SL,GN
11060CPR LTT EXPRESS12:0012:1010M,TH,SA2A,3A,SL,GN
13009DOON EXPRESS12:1912:245M,TU,W,TH,F,SA,SU2A,3A,SL,GN
19045TAPTI GANGA EXP12:5513:1015M,W,TH,F,SU3A,SL,GN
15025MAU ANVT EXPRESS13:0513:3833TU,SU2A,3A,SL,GN
13238KOTA PNBE EXP13:2213:286TH,F,SU2A,3A,SL,GN
14017SADBHAVANA EXP13:2513:3813TH2A,3A,SL,GN
13483FARAKKA EXPRESS13:2513:3813TU,W,F,SU2A,3A,SL,GN
13010DOON EXPRESS13:3213:375M,TU,W,TH,F,SA,SU2A,3A,SL,GN
19046TAPTI GANGA EXP14:4014:5010TU,W,F,SA,SU3A,SL,GN
11055GODAN EXPRESS14:4514:5510M,W,F,SU2A,3A,SL,GN
11059CHHAPRA EXPRESS14:4514:5510TU,TH,SA2A,3A,SL,GN
22103LTT FD SUP EXP15:1615:182M1A,2A,3A,SL,GN
14213BSB GD INTERCITY15:4615:482M,TU,W,TH,F,SA,SUCC,GN
19166SABARMATI EXP16:1016:3525M,W,SA2A,3A,SL,GN
19168SABARMATI EXP16:2016:3010TU,TH,F,SU2A,3A,SL,GN
15115LOK NAYAK EXP17:1017:155SA2A,3A,SL,GN
13308GANGASATLUJ EXP17:1117:165M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12225KAIFIYAT EXP17:3518:0025M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
54334LKO BSB PASS17:4317:452M,TU,W,TH,F,SA,SUUNRESERVED
13237PNBE KOTA EXP18:1618:182TU,SA,SU2A,3A,SL,GN
14853MARUDHAR EXPRES18:5318:552M,W,SA2A,3A,SL,GN
15623BGKT KYQ EXP18:5519:005TU2A,3A,SL,GN
54109DDU FD PASS19:5519:594M,TU,W,TH,F,SA,SUUNRESERVED
14649SARYU YAMUNA EXP20:0520:3025TU,F,SU2A,3A,SL,GN
15624KYQ BGKT EXPRESS20:2820:335F2A,3A,SL,GN
19053ST MFP EXPRESS20:3020:5525F3A,SL,GN
13510GD ASN EXPRESS20:3020:5525W3A,SL,GN
55139BUI SHG PASS22:35Des--M,TU,W,TH,F,SA,SUUNRESERVED
13152KOLKATA EXP23:0523:105M,TU,W,TH,F,SA,SU2A,3A,SL,GN
15715GARIB NAWAJ EXP23:1023:4030TU,F,SU1A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure
55138SHG BUI PASSSrc06:10--M,TU,W,TH,F,SA,SUUNRESERVED
55140SHG BUI PASSSrc15:20--M,TU,W,TH,F,SA,SUUNRESERVED
55163SHG ARJ PASSSrc23:45--M,TU,W,TH,F,SA,SUUNRESERVED



RECENT NEWS

1
No.158/2020-21 27-06-2020
Chennai
200 Railway Maintenance Projects of critical importance completed during Covid-19 lockdown period.


This will boost safety and speed of Train operations in key sections of tracks.

The backend warriors of Indian Railways have fully availed the opportunity provided by suspension of passenger services due to pandemic of COVID 19 to successfully executed more than 200 long pending maintenance works including yard remodeling, repair and re-girdering of oldbridges, doubling and electrification of rail lines andrenewal of scissor crossovers. Pending for several years, these unfinished projects often confronted Indian Railways as bottlenecks.

Apart from ensuring supply chains all essential commodities running through parcel trains and freight trains, Indian Railways executed these long pending maintenance works during this lockdown period when passenger services were suspended.

During this period Indian Railways focused o­n several long pending overdue maintenance works which required traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. They were planned during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service.

These works taken up for removal of bottlenecks and enhance safety include 82 rebuilding/rehabilitation of bridge, 48 limited height subway/road under bridge in lieu of level crossing gate, 16 construction/strengthening of foot over bridge, 14 dismantling of old foot over bridge, 7 launching of road over bridge, 5 yard remodelling, 1 commissioning of doubling & electrification and 26 other projects.

Some of these key projects are as follows -

Yard Modification work in Jolarpetti (Chennai Division, Southern Railway) was completed o­n 21stMay 2020.It resulted in easing out of curve and enhancing the speed up to 60Kmph o­n Bengaluru end and facilitated Simultaneous reception and dispatch.

                                   

Likewise dismantling of old abandoned unsafe Foot Over Bridge at Ludhinana (Firozepur Division, Northern Railway) was completed o­n 5th May 2020. Dismantling of this 135 meter long old abandoned FOB structure over 19 tracks and 7 passenger platforms was overdue since 2014 after new FOB was commissioned. 

Work of re-girdering of bridge o­n Tunga River (Mysuru Division, South Western Railway) was completed o­n 3rd May 2020. Dismantling of unsafe deck of Kopar Road ROB near Dombivali (Mumbai Division, Central Railway) was completed o­n 30rdApril 2020 and it resulting in enhanced safety. This deck was declared unsafe for road users in 2019 and covered 6 railway tracks below. 

Two projects of Doubling with Electrification in Varanasi Division, North Eastern Railway were completed o­n 13th June. o­ne of these projects is Kachhwa Road to Madhosingh Section and the second is 16 km of Manduadih to Prayagraj Section. This resulted in decongestion of east - west routes and facilitation of freight movement. The dismantling work of ROB crossing 8 railway tracks in the approach of Chennai Central Station was completed o­n 9th May 2020. This ROB was declared unsafe and was closed for heavy vehicles since July 2016. ROB dismantling could not be done as traffic block requirement was very high resulting into massive cancellation /rescheduling of trains with loss of passenger revenue. 

Works o­n construction of two new bridges in Vijayawada Division of South Central Railway were completed o­n 3rd May. o­n Howrah- Chennai route, the construction of limited height subway for LC elimination in Khurda Road Division in East Coast Railway was completed o­n 9thMay 2020 resulting in increased operational efficiency of trains and Safety. Signalling upgradation work of Azamgarh station (Varanasi Division, North Eastern Railway) was completed o­n 23rd May. Mau - Shahganj section has been upgraded to STD.-II (R), yard speed upgraded from 50 kmph to 110 kmph and simultaneous reception, dispatch and shunting facility provided.

Likewise, renewal of wooden layout Scissors crossover with standard Pre-stress Concrete (PSC) layout in Vijayawada & Kazipet yards (Vijayawada Division, South Central Railway) has been completed. A major block of 72 hrs was taken in Kazipet yard for pending yard remodelling. The old wooden scissors crossover laid in 1970 was replaced with standard PSC layout. Insertion of RCC box at Tilak Nagar station (Mumbai Division, Central Railway) was completed in two mega blocks of 28 hrs and 52 hrs durations o­n 3rd May. This work was taken up to address the problem of flooding in rainy season near Tilak Nagar station o­n harbour line.

The innovative pilot project for powering Trains by solar power, developed over a vacant railway land at Bina is under extensive testing. This 1.7 Mega Watt project to directly feed to 25 kV Railway Overhead Line is a joint venture of Indian Railways and BHEL.

**

PIB COURTESY




(B.Guganesan)
Chief Public Relations Officer




2
20-05-2015
RAILWAY RUNS WEEKLY EXPRESS SPECIAL TRAIN BETWEEN BHAGAT KI KOTHI-KAMAKHYA- BHAGAT KI KOTHI (10 TRIPS)

       In order to clear extra rush of rail passengers during Summer Season-2015, Railway has decided to run Special Train No. 05624/05623 Bhagat Ki Kothi -Kamakhya- Bhagat Ki Kothi Weekly Express as per the following programme:

The05624 Kamakhya- Bhagat Ki Kothi Weekly Express Special Train will depart fromKamakhya o­n every Friday at 05.10 p.m. from 29.05.2015 to 26.06.2015(05 trips) to reach Bhagat Ki Kothi at 10.45 p.m. the third day.In the return direction, the 05623 Bhagat Ki Kothi -Kamakhya Weekly Express Special Train will depart from Bhagat Ki Kothi o­n every Tuesday at 03.50 p.m. from 02.06.2015 to 30.06.2015(05 trips) to reach Kamakhya at 11.15 p.m. the third day.

 Comprising of two AC III Tier, eight Sleeper Class, six General Class & Two Second Class cum luggage and Brake van coaches, the 05624/05623 Bhagat Ki Kothi -Kamakhya- Bhagat Ki Kothi Weekly Express Special Train willstop at Rangiya, Barpeta Road, New Bongai Gaon, Kokrajhar, New Alipurduar, New Coochbehar, New Jalpaiguri, Kishanganj, Sonalli, Katihar, Naugachia, Khagaria, Barauni, Patna, Ara, Buxar, Mughalsarai, Varanasi, Shahganj, Faizabad, Lucknow, Moradabad, Delhi Jn., Delhi Cantt, Gurgaon, Rewari, Mahendragarh, Loharu, Sadulpur, Churu, Ratangarh, Sujan Garh, Laudanu, Didwana, Chotikhatu, Khatu, Degana,  Merta Road & Jodhpur stations enroute in both the directions.           








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search