For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








25 Trains from (LTT)LOKMANYATILAK T to (ALD)ALLAHABAD JN


Address: Kurla, Mumbai, Maharashtra, India

Station Code: LTT

Station Name: LOKMANYATILAK T

Zone: CR/Central

Train Frequency Weekly: 315

Station Traffic: High

Address: Allahabad Railway Station, Allahabad, Uttar Pradesh, India

Station Code: ALD

Station Name: ALLAHABAD JN

Zone: NCR/North Central

Train Frequency Weekly: 669

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11093MAHANAGARI EXPDR00:25ACOI00:1223:47M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11093 Status
12167LTT MUV EXPRESSLTT00:35ACOI23:4023:05M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12167 Status
22129TULSI EXPRESSLTT05:23ALD08:5027:27TU,SU2A,3A,SL,GN,22129 Status
11067SAKET EXPRESSLTT05:23ALD03:5022:27W,SA2A,3A,SL,GN,11067 Status
12165LTT BSB SUP EXPLTT05:23ALD03:5022:27M,TH,F2A,3A,SL,GN,12165 Status
15017GORAKHPUR EXPLTT06:35ALD08:2025:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15017 Status
15647GUWAHATI EXPRESLTT08:05ACOI05:3521:30F2A,3A,SL,GN,15647 Status
15645GUWAHATI EXPRESLTT08:05ACOI05:3521:30W,SA2A,3A,SL,GN,15645 Status
12336BHAGALPUR EXPLTT08:05ACOI05:3521:30TU,TH,SU2A,3A,SL,GN,12336 Status
11055GODAN EXPRESSLTT10:55ALD09:5523:00M,W,F,SU2A,3A,SL,GN,11055 Status
11059CHHAPRA EXPRESSLTT10:55ALD09:5523:00TU,TH,SA2A,3A,SL,GN,11059 Status
12546KARMABHUMI EXPLTT11:20ACOI09:0721:47MUNRESERVED12546 Status
15548LTT JYG JANSADHARAN EXPLTT11:20ACOI09:0721:47THUNRESERVED15548 Status
11061DARBHANGA EXPLTT12:15ALD10:4522:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11061 Status
11071KAMAYANI EXPRESLTT12:40ALD15:3026:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11071 Status
22913SHC HUMSAFARBDTS12:55ACOI16:0827:13SU3A22913 Status
22103LTT FD SUP EXPLTT13:40ALD11:4022:00M1A,2A,3A,SL,GN,22103 Status
11081LTT GKP EXPRESSLTT15:50ACOI16:0824:18W2A,3A,SL,GN,11081 Status
18610RANCHI EXPRESSLTT15:50ALD16:0024:10SA2A,3A,SL,GN,18610 Status
15268JANSADHARAN EXPLTT15:50ALD16:0024:10TUUNRESERVED15268 Status
11053LTT AZAMGARH EXPLTT16:40ALD18:1025:30W2A,3A,SL,GN,11053 Status
12293ALD DURONTO EXPLTT17:25ALD12:4519:20M,F1A,2A,3A,12293 Status
12322KOLKATA MAILDR21:45ACOI19:4522:00M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12322 Status
13202LTT RJPB EXPLTT22:15ACOI23:1825:03M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13202 Status
19041BDTS GCT EXPBDTS23:25ALD05:1529:50F,SU2A,3A,SL,GN,19041 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
11-09-2019
Tree Plantation drive by NCRWWO.

North Central Railway

Headquarter

Public Relations

Prayagraj

No. PR/09/2019Press ReleaseDate: 09.09.2019

Tree Plantation drive by NCRWWO

Tree plantation drive was carried out by North Central Railway Women Welfare Organization, Headquarters, Allahabad led by Mrs. Lalita Chaudhry, President NCRWWO and members of the organization at Park No. 01 in Railgaon Colony, Subedarganj. o­n this occasion, saplings were also planted by the children coming to play in the park regularly.

Besides plantation, new swings were also provided in park & renovated old swing inaugurated. o­n this occasion, Secretary Mrs. Urmila Ojha, Treasurer Mrs. Nirupama Srivastava, Mrs. Namrata Mishra, Mrs. Satya Lakshmi Valluri, Mrs. Alka Mehta, Mrs. Vijayanti Kumar, Mrs. Supriya Sinha, Mrs. Kavita Talwar, Dr. Mrs. Ritu Agarwal and Geetanjali VermaOther members of the organization were present.





2
11-09-2019
Safety Review Meeting held at NCR HQ

North Central Railway

Headquarter

Public Relations

Prayagraj

No. PR/09/2019Press ReleaseDate: 09.09.2019

Safety Review Meeting held at NCR HQ

 On 09.09.2019 a review meeting held at NCR HQ Subedarganj pertaining to safety and other important issues. Shri Rajiv Chaudhry, General Manager, Shri Arun Malik Additional General Manager, Principal Heads Of different departments attended the meeting while DRMs and their team from Agra , Allahabad and Jhansi joined through video conference. 

First safety position o­n North Central Railway was reviewed.  General Manager, Shri Chaudhry said that in case of unusual incidents & accidents etc photographic evidences are very important and revealing photographs needs to be taken. If need be some training of railwaymen entrusted with evidence collection be organised. Shri Chaudhry also emphasised that pathway wherever not available in station yards are required to be provided in phased manner for ease of movement of staff in yards to the points etc. He also added that in future bicycles can also be provided to station staff for ease of movement in yard for locking of points etc as per requirement. During the meeting safety hazard associated with wagon door open o­n run was discussed and means to mitigate it were reiterated to all three divisions.

For improved fire safety in coaching trains master switch relocation from luggage to guard portion in SLR is an important modification.  General Manager emphasized that it is a important modification and directed divisions to complete balance SLRs immediately. Further items of safety action plan of different departments were also reviewed. 

General Manager Shri Rajiv Chaudhry expressed satisfaction over items where achievements are as per targets and advised all concerned to make good o­n shortfall items. Under the safety action plan important items related to safety in train operations are identified pertaining to different departments like track renewals, electronic interlocking , dual detection system, air conditioning of running rooms, air conditioning of locomotive cabs, removal of critical implantation ,Ultrasonic testing , fire & smoke detectors , fire extinguishers in Non AC coaches, interlocking of gates, provision of CBC etc. These items are accorded topmost priority and execution is closely monitored by respective departments as well as safety branch. North Central Railway is installing 02 “Online Monitoring of Rolling Stocksystem” in Allahabad division. These o­nline monitoring of rolling stock systems have acoustic bearing detector and wheel impact detector to detect bearing defects as well as flat wheel in very early stage.  o­nce commissioned in Sarsaul up main line and Kanchausi down main line, it will help in very early defect detection to avoid section block and unsafe condition due to hot axle , flat wheel etc.

On infrastructure front, progress of Tundla Non Interlocking was discussed and found to be progressing as per target.  After Tundla, Non Interlocking of Govindpuri, NI and RRI modification of Kanpur shall be taken up for execution. General Manager emphasized that weigh bridges must be attended immediately so as down time is minimal. He said satisfactory working of weigh bridge is essential for proper  weighment of loaded rake.






COMMENTS

1
seetarampatwa- Tue Aug 4 8:34 2015


Add Comment






Submit