For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








23 Trains from (BRD)BHANDARA ROAD to (KRI)Khapri


Address: Bhandara Road Station, Maharashtra, India

Station Code: BRD

Station Name: BHANDARA ROAD

Zone: SECR/South East Central

Train Frequency Weekly: 229

Station Traffic: High

Address: Khapri, Nagpur Maharashtra

Station Code: KRI

Station Name: Khapri

Zone: CR/Central

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18239GAD NGP EXPBRD02:56ITR05:202:24M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18239 Status
22647KRBA TVC EXPRESBRD03:08NGP04:351:27W,SA2A,3A,SL,GN,22647 Status
58111TATA ITR PASSBRD04:35ITR06:352:00M,TU,W,TH,F,SA,SUSL,GN,58111 Status
12860GITANJALI EXPBRD06:04NGP07:201:16M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12860 Status
68713G ITR MEMUBRD07:46ITR09:351:49M,TU,W,TH,F,SA,SUUNRESERVED68713 Status
11040MAHARASHTRA EXPBRD09:15AJNI11:031:48M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11040 Status
20813PURI JU EXPRESSBRD09:32NGP10:551:23W1A,2A,3A,SL,GN,20813 Status
58816TRDI ITR PASSBRD09:50ITR11:351:45M,TU,W,TH,F,SA,SUUNRESERVED58816 Status
68743G ITR MEMUBRD10:42ITR12:301:48M,TU,W,TH,F,SA,SUUNRESERVED68743 Status
18030SHM LTT EXPRESSBRD11:15AJNI13:482:33M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18030 Status
12409GONDWANA EXPRESBRD11:35NGP12:401:05M,W,TH,F,SA2A,3A,SL,GN,12409 Status
12810HWH MUMBAI MAILBRD12:56NGP14:101:14M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12810 Status
12843PURI ADI EXPBRD13:32NGP14:351:03TU,TH,F,SA2A,3A,SL,GN,12843 Status
18405PURI ADI EXPBRD13:32NGP14:351:03W2A,3A,SL,GN,18405 Status
22619BSP TEN EXPRESSBRD13:52NGP15:101:18TU2A,3A,SL,GN,22619 Status
12130AZAD HIND EXPBRD14:33NGP15:401:07M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12130 Status
12106VIDARBHA EXPRESBRD15:41AJNI17:141:33M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12106 Status
68715BTC ITR MEMUBRD17:16ITR18:251:09M,TU,W,TH,F,SA,SUUNRESERVED68715 Status
12834HWH ADI EXPRESSBRD17:44AJNI19:141:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12834 Status
58205R ITR PASSBRD18:51ITR21:402:49M,TU,W,TH,F,SA,SUUNRESERVED58205 Status
18237CHATTISGARH EXPBRD20:25NGP21:401:15M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18237 Status
12807SAMTA EXPRESSBRD21:06NGP22:251:19TU,W,TH,SA,SU2A,3A,SL,GN,12807 Status
12855NAGPUR INTERCITBRD21:42ITR22:551:13M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12855 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
Press Release No. 5827-05-2022
Hubballi
Press Release No. 58, ONE MINUTE TEMPORARY STOPPAGE OF TRAINS AT URULI STATION, REGULATION OF TRAIN SERVICES & REVISION IN TRAIN TIMINGS

 à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 58 Dt: 27.05.2022

ONE MINUTE TEMPORARY STOPPAGE OF TRAINS AT URULI STATION

Central Railway will provide o­ne minute temporary stoppage of some trains at Uruli Station, to facilitate movement of pilgrims attending annual festival of Bhandara for Shri Prayagdham Trust. as detailed below:

1.  Train No. 12779 Vasco-Da-Gama - Hazrat Nizamuddin Goa Express from 27.05.2022 to 05.06.2022 instead of 30.05.2022 to 05.06.2022. Accordingly, this train will arrive/depart Uruli Station at 04:59 AM / 05:00 AM.

2.  Train No. 12780 Hazrat Nizamuddin – Vasco-Da-Gama Express from 27.05.2022 to 05.06.2022 instead of 30.05.2022 to 05.06.2022. Accordingly, this train will arrive/depart Uruli Station at 04:14 PM / 04:15 PM.


3.  Train No. 12781 Mysuru – Hazrat Nizamuddin Express o­n 04.06.2022. Accordingly, this train will arrive/depart Uruli Station at 04:34 PM / 04:35 PM.


4.  Train No. 12782 Hazrat Nizamuddin – Mysuru Express o­n 30.05.2022. Accordingly, this train will arrive/depart Uruli Station at 05:34 AM / 05:35 AM.


5.  Train No. 22685 Yesvantpur - Chandigarh Sampark Kranti Express o­n 02.06.2022 & 05.06.2022. Accordingly, this train will arrive/depart Uruli station at 09:29 AM / 09:30 AM.


6.  Train No. 22686 Chandigarh - Yesvantpur Sampark Kranti Express o­n 29.05.2022 & 01.06.2022. Accordingly, this train will arrive/ depart Uruli station at 10:19 AM / 10:20 AM.


7.  Train No. 12629 Yesvantpur - Hazrat Nizamuddin Sampark Kranti Express o­n 30.05.2022. Accordingly, this train will arrive/depart Uruli Station at 09:29 AM / 09:30 AM.


8.  Train No. 12630 Hazrat Nizamuddin - Yesvantpur Sampark Kranti Express o­n 26.05.2022 & 28.05.2022. Accordingly, this train will arrive/depart Uruli Station at 10:19 AM / 10:20 AM.

II. REGULATION OF TRAIN SERVICES

The following trains will be regulated due to line block for girder removal for proposed construction of limited height subway between Byadgi - Haveri stations, as detailed below: -

1.  Train No. 07347 SSS Hubballi - Chitradurga Daily Express Special leaving from SSS Hubballi o­n 29.05.2022 will be regulated for 90 minutes enroute.

2.  Train No. 07367 Arsikere - SSS Hubballi Daily Passenger Special leaving from Arsikere o­n 29.05.2022 will be regulated for 90 minutes enroute.

3.  Train No. 17325 Belagavi - Mysuru Vishwamanava Daily Express leaving from Belagavi o­n 29.05.2022 will be regulated for 30 minutes enroute.


III.  REVISION IN TRAIN TIMINGS

Revision in timings of Train No. 16596 Karwar – KSR Bengaluru Express is postponed up to 01.07.2022 due to operational/terminal constrains at Bengaluru and train will run with existing timings. 