For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








18 Trains from (YG)YADGIR to (GR)GULBARGA


Address: Yadgir, Karnataka, India

Station Code: YG

Station Name: YADGIR

Zone: SCR/South Central

Train Frequency Weekly: 211

Station Traffic: High

Address: Gulbarga Railway Station, Gulbarga City, Karnataka 585102, India

Station Code: GR

Station Name: GULBARGA

Zone: CR/Central

Train Frequency Weekly: 1

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11014LOKMANYA TT EXPYG01:45KLBG03:401:55M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11014 Status
11074CHENNAI LTT EXPYG02:10KLBG04:372:27TU2A,3A,SL,GN,11074 Status
17307BASAVA EXPRESSYG02:30KLBG04:502:20M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17307 Status
12627KARNATAKA EXPYG03:50KLBG05:371:47M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12627 Status
11312SOLAPUR EXPYG04:10KLBG06:252:15M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11312 Status
11302UDYAN EXPYG06:35KLBG08:432:08M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11302 Status
16332MUMBAI EXPRESSYG07:10KLBG09:422:32SA2A,3A,SL,GN,16332 Status
16340MUMBAI EXPRESSYG07:10KLBG09:402:30M,TU,W,F2A,3A,SL,GN,16340 Status
16352NCJ MUMBAI EXPYG07:10KLBG09:422:32TH,SU2A,3A,SL,GN,16352 Status
57134RC BJP PASSSPHL08:40MR10:091:29M,TU,W,TH,F,SA,SUUNRESERVED57134 Status
11018KIK LTT EXPRESSYG10:25KLBG12:522:27M2A,3A,SL,GN,11018 Status
11028MUMBAI MAILYG12:00KLBG15:443:44M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11028 Status
16382CAPE MUMBAI EXPYG12:15KLBG18:125:57M,TU,W,TH,F,SA,SU2A,3A,SL,GN,16382 Status
12164CHENNAI EXPYG17:50KLBG19:491:59M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12164 Status
71302GTL GR PASSSPHL19:30MR20:481:18M,TU,W,TH,F,SA,SUUNRESERVED71302 Status
16229MYS BSB EXPYG22:25KLBG00:572:32TU,TH2A,3A,SL,GN,16229 Status
82653JP SUVIDHA EXPYG23:00KLBG01:062:06TH2A,3A,SL,GN,82653 Status
11042MUMBAI EXPRESSYG23:35KLBG02:222:47M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11042 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
Press Release No. 6809-05-2023
Hubballi
Press Release No. 68, RUNNING OF SPECIAL TRAINS

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 68 Dt: 08.05.2023

RUNNING OF SPECIAL TRAINS

The following three trains are notified to clear extra rush during voting day in Karnataka (One trip) between Sir M. Visvesvaraya Terminal Bengaluru-Belagavi, Yesvantpur-Murdeshwar and KSR Bengaluru-Bidar-Sir M. Visvesvaraya Terminal Bengaluru, as detailed below:

1.Train Nos.06585/06586 Sir M. Visvesvaraya Terminal Bengaluru – Belagavi - Sir M. Visvesvaraya Terminal Bengaluru Special (1 trip):

The details of timings and stoppages are as under:

Train No.06585

SMVB Bengaluru-Belagavi

A/D

Stations

A/D

Train No.06586

Belagavi- SMVB Bengaluru

20.30

D

SMVT Bengaluru

A

05.00

21.30/21.55

A/D

Yesvantpur

A/D

03.45/04.15

22.38/22.40

A/D

Tumakuru

A/D

02.35/02.37

23.39/23.40

A/D

Tiptur

A/D

01.30/01.32

00.00/00.05

A/D

Arsikere

A/D

01.05/01.10

00.43/00.45

A/D

Birur

A/D

00.25/00.27

02.03/02.05

A/D

Davangere

A/D

22.51/22.53

02.20/02.22

A/D

Harihar

A/D

22.34/22.36

02.42/02.43

A/D

Ranibennur

A/D

22.09/22.10

03.13/03.15

A/D

Haveri

A/D

21.45/21.47

05.10/05.15

A/D

SSS Hubballi

A/D

20.15/20.25

05.43/05.45

A/D

Dharwad

A/D

19.53/19.55

07.13/07.15

A/D

Londa

A/D

18.23/18.25

08.20

A

Belagavi

D

17.30

Composition: 1 AC 3 tier, 16 Sleeper class and 2 second class cum luggage & brake van/disabled friendly compartment

2.Train Nos. 06587/06588 Yesvantpur-Murdeshwar-Yesvantpur Special (1 trip):

The details of timings and stoppages are as under:

Train No. 06587

Yesvantpur- Murdeshwar

Stations

Train No. 06588

 Murdeshwar-Yesvantpur

Timings

A/D

Timings

A/D

23:55

D

Yesvantpur

A

04:00

00:05/00:07

A/D

Chikbanavar

A/D

03:28/03:30

00:23/00:25

A/D

Nelamangala

A/D

02:43/02:45

00:53/00:55

A/D

Kunigal

A/D

01:28/01:30

01:40/01:42

A/D

Shravanabelagola

A/D

00:33/00:35

01:56/01:58

A/D

Channarayapatna

A/D

00:18/00:20

04:40/04:50

A/D

Sakleshpur

A/D

21:30/21:40

07:25/07:30

A/D

Subrahmanya Road

COMMENTS
NO Comments. Be the first to Comment...

Add Comment






Submit