For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








40 Trains from (UBC)AMBALA CITY to (FGSB)FATEHGARH SAHIB


Address: Ambala City, Haryana 134001, India

Station Code: UBC

Station Name: AMBALA CITY

Zone: NR/Northern

Train Frequency Weekly: 371

Station Traffic: High

Address: Mohalla Jassrian, Fatehgarh Sahib, Punjab, India

Station Code: FGSB

Station Name: FATEHGARH SAHIB

Zone: NR/Northern

Train Frequency Weekly: 61

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13151JAMMU TAWI EXPUBC01:28SIR02:080:40M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13151 Status
14631DDN ASR EXPRESSUMB01:52SIR02:591:07M,TU,W,TH,F,SA,SU3A,SL,GN,14631 Status
11077JHELUM EXPRESSUBC01:58SIR02:350:37M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11077 Status
59386PANCHVALLEY PAUBC02:38SIR03:260:48M,TU,W,TH,F,SA,SUFC,3A,SL,GN,59386 Status
18237CHATTISGARH EXPUBC02:43SIR03:280:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18237 Status
14553HIMACHAL EXPUBC03:19FGSB04:090:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14553 Status
13307GANGASUTLEJ EXPUBC04:35SIR05:130:38M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13307 Status
13049AMRITSAR EXPUBC05:06SIR05:450:39M,TU,W,TH,F,SA,SU3A,SL,GN,13049 Status
64521UMB LDH MEMUUBC05:53SBJ06:270:34M,TU,W,TH,F,SA,SUUNRESERVED64521 Status
64515UMB NLDM MEMUUBC06:21FGSB07:150:54M,TU,W,TH,F,SA,SUUNRESERVED64515 Status
15707KIR ASR EXPRESSUMB07:00SIR07:450:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15707 Status
64563UMB AADR MEMUUMB07:35MRND09:341:59M,TU,W,TH,F,SA,SUUNRESERVED64563 Status
64523UMB LDH MEMUUBC08:41SBJ09:090:28M,TU,W,TH,F,SA,SUUNRESERVED64523 Status
64511SRE UHL MEMUUBC09:01FGSB10:101:09M,TU,W,TH,F,SA,SUUNRESERVED64511 Status
12919MALWA EXPRESSUMB09:05SIR09:460:41M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12919 Status
12497SHANE PUNJABUMB10:15KNN11:100:55M,TU,W,TH,F,SA,SUCC,2S,GN,12497 Status
22429DLI PTK SF EXPUMB11:20SIR12:030:43M,TU,W,F,SA,SUCC,2S,GN,22429 Status
64517UMB NLDM MEMUUBC11:57FGSB12:581:01M,TU,W,TH,F,SA,SUUNRESERVED64517 Status
14617JANSEWA EXPUMB12:05SIR12:530:48M,TU,W,TH,F,SA,SUUNRESERVED14617 Status
12325KOAA NLDM EXPUMB12:50SIR13:310:41TH2A,3A,SL,GN,12325 Status
12317AKAL TAKHT EXPUMB12:50SIR13:310:41W,SU1A,2A,3A,SL,GN,12317 Status
74991UMB DLPC DEMUUMB14:30MRND16:201:50M,TU,W,TH,F,SA,SUUNRESERVED74991 Status
74645UMB JUC DMUUBC14:51SBJ15:170:26M,TU,W,TH,F,SA,SUUNRESERVED74645 Status
12925PASCHIM EXPRESSUBC15:09SIR15:420:33M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12925 Status
14649SARYU YAMUNA EXPUBC15:49SIR16:450:56TU,F,SU2A,3A,SL,GN,14649 Status
14673SHAHEED EXPRESSUBC15:49SIR16:450:56M,W,TH,SA2A,3A,SL,GN,14673 Status
12715SACHKHAND EXPUMB15:50SIR16:380:48M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12715 Status
19325IND AMRITSAR EXPUMB16:40SIR17:190:39TU,F2A,3A,SL,GN,19325 Status
22457NED AADR SF EXPUMB16:40MRND18:231:43SA2A,3A,SL,GN,22457 Status
12459NDLSASR EXPRESSUBC17:34SIR18:120:38M,TU,W,TH,F,SA,SUCC,2S,GN,12459 Status
12053HW ASR JNSHTBDIUMB17:50SIR18:310:41M,TU,W,F,SA,SUCC,2S,GN,12053 Status
12057UHL JANSHATABDIUMB18:20MRND19:521:32M,TU,W,TH,F,SA,SUCC,2S,GN,12057 Status
12013AMRITSAR SHTBDIUMB18:52SIR19:250:33M,TU,W,TH,F,SA,SU1A,CC,12013 Status
64513SRE NLDM MEMUUBC19:06FGSB20:081:02M,TU,W,TH,F,SA,SUUNRESERVED64513 Status
14681NDLS JUC EXPRESUBC20:32SIR21:160:44M,TU,W,TH,F,SA,SUCC,2S,GN,14681 Status
14605HW JAT EXPUBC20:52SIR21:320:40M3A,SL,GN,14605 Status
15211JANNAYAK EXPUMB21:00SIR21:480:48M,TU,W,TH,F,SA,SUUNRESERVED15211 Status
14609HEMKUNT EXPUMB21:08SIR22:030:55M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14609 Status
14645SHALIMAR EXPUBC21:58SIR22:380:40M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,14645 Status
14603JANSADHARAN EXPUMB22:00SIR22:570:57FUNRESERVED14603 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.505/2019-2007-02-2020
Chennai
Thrust on Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget 2020-21


Thrust o­n Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget  2020-21

HIGHLIGHTS:

·Southern Railway has been granted an amount of Rs.3340 crore as budgetary allocation for the year 2020-2021 with a grant of Rs.1238 crore for doubling, Rs.175 crores towards gauge conversion ,  Rs.37 crores for traffic facilities and Rs.198 crores for passenger amenities.

·New projects at a cost of Rs. 4131 has been sanctioned towards doubling of Katpadi-Villupuram line, Salem-Karur-Dindigul line, Erode-Karur line and Chennai Beach- Chennai Egmore (4th line).  A sanction of Rs.280 crores for Chennai Beach – Chennai Egmore 4th line will help easing congestion in this section.

·With focus o­n Safety, for  elimination of level crossing gates an amount of Rs.880 crores have been sanctioned for new road over bridges and Road under bridges particularly o­n the Golden quadrilateral/diagonal routes (Chennai – Gudur/Chennai – Arakkonam – Renigunta).  This has the potential to increase the speed of trains.

·Replacement of Route relay interlocking (RRI) and A, B and C cabins at Jolarpettai has been allotted an outlay of Rs.6 crore.

·Provision of centralized traffic control in connection with modern train control system has been sanctioned at a cost of Rs.148 cr.  This will help in enhancing the line capacity and safety.

·Harnessing the benefits of technology for Safe train operations, provision of  indigenous train collision avoidance system o­n low density railway network has been sanctioned at a cost of Rs.468.9 cr.

·Under Passenger amenities head, a new work for an amount of Rs.150 crores towards minimum essential amenities with more focus o­n  facilities for divyangjan at stations across southern railway has been sanctioned. Rs.75 crores sanctioned towards soft upgrades at stations ( like improvement in station buildings, tall flags, steel benches, cover over platform, etc.)

 

1.Budgetary grant (BG) under various Plan heads

Plan Head

BG 2020-21 (In Rs.Crores)

11

New lines

     2.70

14

Gauge Conversion

175.18

15

Doubling

1238.10

including EBR (IF)

16

Traffic Facilities

 37.12

17

Computerisation

  7.03

21

Rolling Stock

106.59

29

Road Safety Work- Level Crossings

102.36

30

Road Safety Work-ROBs/RUBs

335.52

31

Track Renewals

      730.00

32

Bridge Works

        54.5

33

Signalling & Telecommunication works

105.06

36

Other Electrical work, incl. TRD

39.48

41

Machinery & Plant

         27.76

42

Workshop including PUs

55.04

51

Staff Welfare

63.96

53

Passenger Amenities

198.11

64

Other Specified work

53.34

65

Training/HRD

8.1

Grand Total

3340.00


2.Budget grant for some important o­ngoing work is as under:

Sl.No

Plan Head

Section

BG (In. Rs. Cr)

1.

New Line

Rameswaram-Dhanushkodi (17.2 Km)

    2.7       

2

Gauge Conversion

Mayiladuturai-Tiruvarur-Karaikudi   & Tiruturaipundi- Agastiyampalli

 (47.2 Km including Mannargudi-Needamangalam-Mannargudi-Pattukottai Line)

100.00

Madurai-Bodinayakkanur (90.41 Km)

  75.18

3.

Doubling

Chengalpattu-Villupuram (103 Km): Tambaram-Chengalpattu-3rd line by GC of existing MG line alongwith electrification (30Km)

 132.00

Kurruppanthura-Chingavanam

(26.54 km)

 88.00

Ambalapuzha-Haripad (18.13 km)

 13.95

Omalur-Metur dam- With electrification (29.03 km)

 56.85

Trivandrum-Kanyakumari (86.56 km)

133.5

Madurai-Maniyachi-Tuticorin (160 Km)

367.00

Maniyachi-Nagercoil (102 Km)

345.00

Netravati-Mangalore Central (1.5 Km)

  10.7

Salem-Magnesite-Omalur (11 Km)

  22.00

4

Traffic Facilities

Mangalore Central- Addl Platform lines

   3.00

3.Importance New Works sanctioned are as under:

Sl.No

P.Book item no.

Works

Sanctioned Cost (In Rs.Cr)

Doubling

1.

38

Katpadi-Villupuram (160.10 Km)

1601

2.

39

Salem-Karur-Dingigul (160 Km)

1600

3.

40

Erode-Karur (65 km)

  650

4.

41

Chennai Beach- Chennai Egmore (4.3 km)

  280

  Total (a)

4131

Traffic Facilities

1.

60

SR- Yard modification to improve speed, intermediate block hut and development of new coaching terminal (b)

22.51

Road Safety Works- Level Crossings

1.

101

SR-Engineering work at LCs (c )

20

Road Safety works- ROB/RUBs

1.

401

SR- ROB/RUB o­n Golden quadrilateral/diagonal routes

480

2
04-02-2020
Extension of Temporary Cancellation/ Short Termination/ Short Origination / Partial Cancellation of Trains Due To Traffic Block between Raiwala – Rishikesh Stations on Moradabad Division .

मुरादाबाद मंडल के रायवाला-ऋषिकेश रेलवे स्टेशनों के बीच

यातायात ब्लॉक के कारण रेलगाड़ियां आंशिक रूप से प्रभावित

वीरभद्र-नया ऋषिकेश रेल सेक्शन के वीरभद्र यार्ड की रि-मॉडलिंग और कमीशनिंग के लिए अधिसूचित यात्री ब्लॉक को 19.2.2020 तक बढ़ा दिया गया है । परिणामस्वरूप निम्नलिखित रेलगाड़ियां निम्नानुसार आंशिक रूप से प्रभावित रहेंगी:-

In connection with remodeling of Virbhadra Yard and commissioning of Virbhadra-New Rishikesh section , the earlier notified traffic block period has been extended upto 19.02.2020. Consequently, the following trains will remain temporarily cancelled/ short terminated / short originated  /partially cancelledas under:

CancellationofTrains During Blockब्लॉक के दौरान निरस्त रहने वाली रेलगाड़ियां

Train No. & Name रेलगाड़ी का नम्बर व नाम

Date of Cancellation

तक निरस्त

(from originating station)

24888/24887Ambala Cantt.-Rishikesh-Ambala Cantt. Lnik Exp.

Upto 19.02.2020

54481/54482Haridwar-Rishikesh-Haridwar Passenger

Upto 19.02.2020

54483/54486Haridwar-Rishikesh-Haridwar Passenger

Upto 19.02.2020

Short Termination/Origination/Partial Cancellation of Trains ब्लॉक के दौरान आंशिक रूप से निरस्त रहने वाली रेलगाड़ियां

Train No. & Train Name

रेलगाड़ी का नम्बर व नाम

Train to short terminate at/originate from पर यात्रा समाप्त/से प्रारम्भ

Train Partially Cancelled between Stations

के बीच आंशिक रूप से रद्द

Date from originating station

प्रभावी तिथि

14609 Rishikesh-Shri Mata Vaishno Devi Katra Hemkunt Exp.

 

At/From Haridwar

Haridwar-Rishikesh

Upto 19.02.2020

तक

14610 Sh Mata Vaishno Devi Katra-RishikeshHemkunt Exp.

 

At/From Haridwar

Haridwar-Rishikesh

Upto 18.02.2020

तक

54471 Delhi Jn.-RishikeshPassenger

At/From Haridwar

Haridwar-Rishikesh

Upto 18.02.2020

54463/54464 Chandausi-Rishikesh-Chandausi Passenger

At/From Haridwar

Haridwar-Rishikesh

Upto 19.02.2020

तक

--------------------






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit