For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








20 Trains from (TNA)THANE to (SWV)SAWANTWADI ROAD


Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High

Address: SH123, Maharashtra 416510, India

Station Code: SWV

Station Name: SAWANTWADI ROAD

Zone: KR/Konkan

Train Frequency Weekly: 137

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
09009BDTS MAJN SPLBVI00:23MADR12:3012:07TU2A,3A,SL,GN,09009 Status
09011BDTS MAJN AC SPLBVI00:30MADR12:3012:00SU2A,3A,CC,09011 Status
11003TUTARI EXPRESSTNA00:30SWV12:2011:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11003 Status
09007MMCT THVM SPLBVI00:33MADR13:2812:55M,TH2A,3A,SL,GN,09007 Status
09001MMCT MAJN SPLBVI00:33MADR12:3011:57W2A,3A,SL,GN,09001 Status
01001CSMT SWV SPLTNA00:57ZARP11:3510:38M,TU,W,F,SU3A,SL,GN,01001 Status
11099MAO DOUBLEDECKERTNA01:35SWV09:568:21SACC11099 Status
01069LTT PERN SPLTNA01:45PERN14:3012:45F2A,3A,SL,GN,01069 Status
01039LTT ZARAP SPLTNA01:45ZARP14:4513:00M2A,3A,SL,GN,01039 Status
01007CSMT SWV SPLTNA01:45ZARP11:5810:13TH,SA3A,SL,GN,01007 Status
11085MAO DOUBLEDECKRTNA05:52SWV14:408:48M,WCC11085 Status
50105DIVA SWV PASSDIVA06:25ZARP17:4111:16M,TU,W,TH,F,SA,SU2S,GN,50105 Status
10103MANDOVI EXPRESSTNA07:50PERN18:4710:57M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN,10103 Status
01447PUNE KRMI SPLKYN14:50ZARP02:3511:45F3A,SL,GN,01447 Status
22113LTT KCVL EXPRESSTNA17:20PERN02:369:16TU,SA1A,2A,3A,SL,GN,22113 Status
12201KCVL GARIB RATHTNA17:20SWV02:148:54M,F3A,CC,12201 Status
01041LTT ZARP SPLTNA17:20ZARP06:0012:40TH2A,3A,SL,GN,01041 Status
12742PNBE VSG EXPRESKYN21:00SWV06:309:30SA2A,3A,SL,GN,12742 Status
16335NAGERCOIL EXPBIRD21:08SWV06:549:46F2A,3A,SL,GN,16335 Status
10111KONKAN KANYA EXTNA23:45PERN09:419:56M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,10111 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
143/2023-24 05-06-2023
Chennai
Weekly Summer Special Trains between Ahmedabad and Mangaluru Jn


Western Railway has notified Weekly Special fare Summer Special trains to clear extra rush of passengers in Ahmedabad – Mangaluru Jn sector as detailed below:


Train No. 09424/09423 Ahmedabad – Mangaluru Jn – Ahmedabad Weekly Special Fare Summer Specials:


Train No. 09424 Ahmedabad – Mangaluru Jn. Special Fare Summer Special will leave Ahmedabad at 16.00 hrs o­n 09th, 16th and 23rd June, 2023 (Friday) and reach Mangaluru at 19.40 hrs, the next day (03 Services)


In return direction Train No. 09423 Mangaluru Jn. – Ahmedabad Special Fare Summer Special will leave Mangaluru Jn. at 21.10 hrs o­n 10th, 17th and 24th June2023 (Saturday) and reach Ahmedabad at 01.15 hrs, the next day (03 Service)


Coach Composition03- AC Two Tier Coaches, 12- AC Three Tier Economy Coaches, 03- Sleeper Class Coaches, 02-  General Second Class Coaches & 01- Second Class (Divyangjan Friendly)

The details of timings and stoppages of Train No. 09424/09423 Ahmedabad – Mangaluru Jn. – Ahmedabad Special Fare Summer Specials are as follows (Timings in Hours):


Train No. 09424 Ahmedabad – Mangaluru Jn. Special Fare Summer Special

↓

Station

↑

Train No. 09423 Mangaluru Jn. – Ahmedabad Special Fare Summer Special

16.00 (Friday)

(d)

Ahmedabad

(a)

01.15

16.55/16.57

(a/d)

Nadiad

(a/d)

23.42/23.44

17.12/17.14

(a/d)

Annand

(a/d)

23.25/23.27

17.50/17.55

(a/d)

Vandodara

(a/d)

23.00/23.05

18.47/18.49

(a/d)

Bharuch

(a/d)

22.01/22.03

19.35/19.40

(a/d)

Surat

(a/d)

21.20/21.25

21.10/21.12

(a/d)

Vapi

(a/d)

19.40/19.42

23.10/23.15

(a/d)

Vasai Road

(a/d)

17.18/17.23

00.40/00.45

(a/d)

Panvel

(a/d)

15.25/15.30

02.20/02.25

(a/d)

Roha

(a/d)

14.05/14.10

05.30/05.35

(a/d)

Ratnagiri

(a/d)

09.00/09.05

07.58/08.00

(a/d)

Kudal

(a/d)

06.18/06.20

08.20/08.22

(a/d)

Sawantwadi Road

(a/d)

06.00/06.02

08.50/08.52

(a/d)

Thivim

(a/d)

05.16/05.18

09.10/09.12

(a/d)

Karmali

(a/d)

04.55/04.57

10.10/10.20

(a/d)

Madgaon

(a/d)

2

2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit