For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








21 Trains from (SWV)SAWANTWADI ROAD to (TNA)THANE


Address: SH123, Maharashtra 416510, India

Station Code: SWV

Station Name: SAWANTWADI ROAD

Zone: KR/Konkan

Train Frequency Weekly: 137

Station Traffic: Medium

Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12202LTT GARIB RATHSWV03:42TNA14:2210:40TH,SU3A,CC,12202 Status
01048SWV LTT SPLZARP06:14TNA17:5511:41M3A,SL,GN,01048 Status
11086LTT DOUBLEDECKERSWV06:56TNA17:4010:44TU,THCC11086 Status
09012MAJN BDTS EXPMADR07:32BVI21:2013:48M2A,3A,CC,09012 Status
09010MAJN BDTS EXPMADR07:32BVI21:2013:48W2A,3A,SL,GN,09010 Status
09002MAJN MMCT EXPMADR07:32BVI21:2513:53TH2A,3A,SL,GN,09002 Status
50106SWV DIVA PASSZARP08:42TPND19:2610:44M,TU,W,TH,F,SA,SU2S,GN,50106 Status
10104MANDOVI EXPRESSPERN09:45TNA20:3810:53M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN,10104 Status
16336GANDHIDHAM EXPSWV11:36BIRD22:2810:52TU2A,3A,SL,GN,16336 Status
01014THIVIM LTT SPLZARP12:14TNA23:5011:36SU2A,3A,SL,GN,01014 Status
11100LTT DOUBLEDECKERSWV13:04TNA23:2510:21SUCC11100 Status
01002SWV CSMT SPLZARP15:12TNA02:4011:28M,TU,W,F,SU3A,SL,GN,01002 Status
01008SWV CSMT SPLZARP15:12TNA02:4011:28TH,SA3A,SL,GN,01008 Status
01040ZARP LTT SPLZARP15:30TNA04:1812:48M2A,3A,SL,GN,01040 Status
01070PERN LTT SPECIALZARP15:34TNA04:1812:44F2A,3A,SL,GN,01070 Status
09008THVM MMCT SPLMADR16:52BVI08:1515:23TU,F2A,3A,SL,GN,09008 Status
11004TUTARI EXPRESSSWV17:30TNA05:4212:12M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11004 Status
10112KONKAN KANYA EXPPERN17:50TNA04:5211:02M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,10112 Status
22114KCVL LTT SF EXPPERN19:52TNA07:1811:26M,TH1A,2A,3A,SL,GN,22114 Status
12741VSG PATNA EXPSWV20:30KYN07:3211:02W2A,3A,SL,GN,12741 Status
01036SWV CSMT SPLZARP23:12TNA11:1512:03M,TU,W,TH,F,SA,SU3A,SL,GN,01036 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
143/2023-24 05-06-2023
Chennai
Weekly Summer Special Trains between Ahmedabad and Mangaluru Jn


Western Railway has notified Weekly Special fare Summer Special trains to clear extra rush of passengers in Ahmedabad – Mangaluru Jn sector as detailed below:


Train No. 09424/09423 Ahmedabad – Mangaluru Jn – Ahmedabad Weekly Special Fare Summer Specials:


Train No. 09424 Ahmedabad – Mangaluru Jn. Special Fare Summer Special will leave Ahmedabad at 16.00 hrs o­n 09th, 16th and 23rd June, 2023 (Friday) and reach Mangaluru at 19.40 hrs, the next day (03 Services)


In return direction Train No. 09423 Mangaluru Jn. – Ahmedabad Special Fare Summer Special will leave Mangaluru Jn. at 21.10 hrs o­n 10th, 17th and 24th June2023 (Saturday) and reach Ahmedabad at 01.15 hrs, the next day (03 Service)


Coach Composition03- AC Two Tier Coaches, 12- AC Three Tier Economy Coaches, 03- Sleeper Class Coaches, 02-  General Second Class Coaches & 01- Second Class (Divyangjan Friendly)

The details of timings and stoppages of Train No. 09424/09423 Ahmedabad – Mangaluru Jn. – Ahmedabad Special Fare Summer Specials are as follows (Timings in Hours):


Train No. 09424 Ahmedabad – Mangaluru Jn. Special Fare Summer Special

↓

Station

↑

Train No. 09423 Mangaluru Jn. – Ahmedabad Special Fare Summer Special

16.00 (Friday)

(d)

Ahmedabad

(a)

01.15

16.55/16.57

(a/d)

Nadiad

(a/d)

23.42/23.44

17.12/17.14

(a/d)

Annand

(a/d)

23.25/23.27

17.50/17.55

(a/d)

Vandodara

(a/d)

23.00/23.05

18.47/18.49

(a/d)

Bharuch

(a/d)

22.01/22.03

19.35/19.40

(a/d)

Surat

(a/d)

21.20/21.25

21.10/21.12

(a/d)

Vapi

(a/d)

19.40/19.42

23.10/23.15

(a/d)

Vasai Road

(a/d)

17.18/17.23

00.40/00.45

(a/d)

Panvel

(a/d)

15.25/15.30

02.20/02.25

(a/d)

Roha

(a/d)

14.05/14.10

05.30/05.35

(a/d)

Ratnagiri

(a/d)

09.00/09.05

07.58/08.00

(a/d)

Kudal

(a/d)

06.18/06.20

08.20/08.22

(a/d)

Sawantwadi Road

(a/d)

06.00/06.02

08.50/08.52

(a/d)

Thivim

(a/d)

05.16/05.18

09.10/09.12

(a/d)

Karmali

(a/d)

04.55/04.57

10.10/10.20

(a/d)

Madgaon

(a/d)

2

2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit