For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








18 Trains from (LTK)Lathikata to (BMB)BAMRA


Address: NH 23, Latkata Odisha

Station Code: LTK

Station Name: Lathikata

Zone: SER/South Eastern

Train Frequency Weekly: 11

Station Traffic: Low

Address: Bamra, Odisha 768221, India

Station Code: BMB

Station Name: BAMRA

Zone: SER/South Eastern

Train Frequency Weekly: 207

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18005HWH SBP JDB EXPBZR04:15BMB06:482:33M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18005 Status
22839ROU BBS SF INT EROU05:10BMB06:060:56M,TU,W,TH,F,SA,SUCC,2S,GN,22839 Status
12834HWH ADI EXPRESSROU06:35BMB07:330:58M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12834 Status
78103ROU SBP PASSENGERROU07:20BMB08:281:08M,TU,W,TH,F,SAUNRESERVED78103 Status
58131ROU PURI PASSROU08:00BMB09:211:21M,TU,W,TH,F,SA,SUUNRESERVED58131 Status
18477UTKAL EXPRESSBZR08:47BMB10:261:39M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18477 Status
58111TATA ITR PASSBZR10:14BMB12:492:35M,TU,W,TH,F,SA,SUSL,GN,58111 Status
13288SOUTH BIHAR EXPBNDM11:15BMB12:441:29M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,13288 Status
12871ISPAT EXPRESSBNDM13:19BMB14:461:27M,TU,W,TH,F,SA,SU3A,CC,2S,GN,12871 Status
18310JAT SBP EXPROU14:30BMB15:290:59M,TU,W,TH,F,SA,SU3A,SL,GN,18310 Status
68029ROU JSG PASSROU15:00BMB16:101:10M,TU,W,TH,F,SA,SUUNRESERVED68029 Status
58161HTE JSG PASSBGKA15:51BMB18:242:33M,TU,W,TH,F,SA,SUUNRESERVED58161 Status
18189TATA ALLP EXPBNDM18:05BMB19:561:51M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18189 Status
13351DHN ALAPPUZHA EBNDM18:14BMB19:561:42M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
18451TAPASWINI EXPRESROU19:20BMB20:291:09M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18451 Status
18117RAJYA RANI EXPROU21:20BMB22:261:06M,TU,W,TH,F,SU2A,3A,SL,GN,18117 Status
58113TATA BSP PASSBZR21:23BMB00:012:38M,TU,W,TH,F,SA,SUSL,GN,58113 Status
18030SHM LTT EXPRESSBNDM22:47BMB00:161:29M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18030 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
03-03-2020
GM NCR & NR Sri Rajiv Chaudhry reviewed Safety, Infrastructure and punctuality position. CCTV camera to assist train passing staff installed at Bamrauli

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/02/2020Press ReleaseDate: 19.02.2020

GM NCR & NR Sri Rajiv Chaudhry reviewed Safety, Infrastructure and punctuality position. CCTV camera to assist train passing staff installed at Bamrauli

General Manager NCR &NR Sri Rajiv Chaudhry reviewed safety, punctuality infrastructure and other important issues of Agra, Allahabad and Jhansi divisions through video conference. North central Railway is a major passing through Railway and approximately 1000 trains operates per day o­n NCR including Vande Bharat, Gatiman, Rajdhani, Shatabdi, Mail Express and different types of Goods train. Owing to extremely high traffic density, need was being felt for long to augment effortsof train passing staff so as no train goes un-observed from any train passing station . Despite high alertness of our train passing staff sometime difficulty was being faced in observing train from both side under current system if other track was occupied by a stationary or moving train obstructing the view of train passing staff.To overcome this problem installation of CCTV camera was planned at entry point of station from both sides and display of such CCTV with station master to observe entering or leaving train o­n a particular station. To gauge efficacy of this system with a view to incorporate suitable changes before large scale implementation o­ne such system has been installed at Bamrauli station of Allahabad division. During video conference it was informed that required changes for proper visibility of train from both side are underway o­n which GM Sri Chaudhry instructed for completing it o­n priority. o­nce this prototype system proven for intended benefits, it will be replicated o­n other stations of NCR which will substantially augment efforts of our train passing staff and itwill go a long way in ensuring safety in train operations.

On punctuality front General Manager said that we are now running 7 to 8 goods trains in UP direction between Bhadan- Khurja and we need to work out improvement in punctuality performance pre and post commissioning of DFC route. He added that this exercise will also help in working out punctuality improvement benefits and additional train running capacity o­nce eastern DFC route is commissioned between Dadri- Pt DeenDayal Upadhyay Jn. which is targeted in the year 2021.

NCR has recently completed major yard remodeling and Electronic Interlocking work at Tundla Jn. GM Sri Rajiv Chaudhry advised that we need to work benefit of this work in terms punctuality improvement in Kanpur-Gaziabad section and ease in train handling capacity at Tundla Jn.

Elimination of manned level crossing is a mission area for Railways and this becomes even more important in sections where railway and DFC tracks are running parallel thus making operation of LC gate extremely difficult.To facilitate safe and detention free rail and road travel, 18 road under bridges are to be constructed jointly by North Central Railway and DFC in Allahabad – Kanpur section within next o­ne year time. Earning and expenditure performance of North Central Railway was also reviewed. GM expressed satisfaction o­n earning of Rs 181 Cr. Through scrap sale till Jan-20 and instructed to make all out efforts to reach goal of Rs. 225 Cr. through scrap sale,which will be best ever earning performance of NCR through scrap sale .





2
10-12-2019
REGULATION OF SER TRAINS DUE TO TRAFFIC-CUM-POWER BLOCK

 

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्ति

PRESS RELEASE


REGULATION OF SER TRAINS DUE TO TRAFFIC-CUM-POWER BLOCK

 

Kolkata, 10th December, 2019:

In view of 10 days Pre Non Interlocking work from 12.12.19 to 21.12.19 and 2 days Non Interlocking work o­n 22.12.19 and 23.12.19 at Bamra Yard in connection with commissioning of 3rd line work between Rourkela-Jharsuguda section of Chakradharpur Division, the service of the following S E Railway trains will be regulated:-

CANCELLATION OF TRAINS

·58131/58132 Rourkela-Puri-Rourkela Passenger will remain cancelled from 12.12.19 to 23.12.19.

·58111/58112 Tatanagar-Itwari-Tatanagar Passenger will remain cancelled from 12.12.19 to 23.12.19

·68030/68029 Jharsuguda-Rourkela-Jharsuguda MEMU Passenger will remain cancelled from 12.12.19 to 23.12.19.

·68162/68161 Jharsuguda-Hatia-Jharsuguda MEMU Passenger will remain cancelled from 12.12.19 to 23.12.19.

·58113/58114 Tatanagar-Bilaspur-Tatanagar Passenger will remain cancelled from 12.12.19 to 23.12.19.

·22885 Lokmanya Tilak Terminal-Tatanagar Antyodaya Express leaving Lokmanya-Tilak Terminal o­n 17.12.19 will remain cancelled.

·22886 Tatanagar-Lokmanya Tilak Terminal Antyodaya Express leaving Tatanagar o­n 15.12.19 will remain cancelled.

RESCHEDULING OF TRAINS

·12872 Titlagarh-Howrah Ispat Express will be rescheduled to leave Titlagarh at 08.15 hrs. instead of05.15 hrs. from 12.12.19 to 23.12.19.

·12869 Mumbai CSMT-Howrah Express will be rescheduled to leave Mumbai CSMT at 12.35 hrs. instead of11.05 hrs. o­n 15.12.19.

SHORT TERMINATION/SHORT ORIGINATION OF TRAINS

·18310 Jammu Tawi-Muri-Sambalpur Link Express will be short terminated at Rourkela from 12.12.19 to 23.12.19 and short originated as 18309 Sambalpur-Muri-Jammu Tawi Link Express from Rourkela from 13.12.19 to 24.12.19

CONTROLLING OF TRAINS

·13288 Rajendranagar-Durg South Bihar Express to be controlled in the section for 20 minutes from 12.12.19 to 23.12.19.

·22845 Pune-Hatia Express to be controlled in the section for 30 minutes o­n 15.12.19.

·22838 Ernakulam-Hatia Dharti Aaba Express to be controlled in the section for 30 minutes from 12.12.19 and 19.12.19.

-----------

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit