For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








19 Trains from (TRAN)TORANG to (SSIA)SUISA


Address: 723212, India

Station Code: TRAN

Station Name: TORANG

Zone: SER/South Eastern

Train Frequency Weekly: 37

Station Traffic: Low

Address: SH 4, West Bengal 723212, India

Station Code: SSIA

Station Name: SUISA

Zone: SER/South Eastern

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18615KRIYA YOGA EXPTUL04:00SSIA04:090:09M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18615 Status
58662HTE TATA PASSKITA05:43SLF05:530:10M,TU,W,TH,F,SA,SUUNRESERVED58662 Status
18623IPR BRKA EXPJAA06:11SLF06:500:39M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18623 Status
58024BRKA TATA PASSTRAN06:35HNSL07:351:00M,TU,W,TH,F,SA,SUUNRESERVED58024 Status
58143TATA HTE PASSTRAN07:22SLF08:190:57M,TU,W,TH,F,SA,SUUNRESERVED58143 Status
63598ASN RNC MEMUJAA08:46SLF09:210:35M,TU,W,TH,F,SA,SUUNRESERVED63598 Status
63504HATIA BWN PASSKITA09:24SLF09:350:11M,TU,W,TH,F,SA,SUUNRESERVED63504 Status
58033BKSC RNC PASSJAA10:02SLF10:320:30M,TU,W,TH,F,SA,SUUNRESERVED58033 Status
68085GBA RNC PASSJAA10:10SLF10:390:29M,TU,W,TH,F,SA,SUUNRESERVED68085 Status
58026HTE KGP PASSKITA10:26SLF10:370:11M,TU,W,TH,F,SA,SUUNRESERVED58026 Status
63597RNC ASN MEMUKITA13:29SLF13:380:09M,TU,W,TH,F,SA,SUUNRESERVED63597 Status
63503BWN HTE PASSJAA14:19SLF14:590:40M,TU,W,TH,F,SA,SUUNRESERVED63503 Status
58661TATA HTE PASSJAA15:00SLF15:420:42M,TU,W,TH,F,SA,SUUNRESERVED58661 Status
58025KGP HTE PASSJAA16:21SLF17:040:43M,TU,W,TH,F,SA,SUUNRESERVED58025 Status
58034RNC BKSC PASSKITA16:50SLF16:590:09M,TU,W,TH,F,SA,SUUNRESERVED58034 Status
58023TATA BRKA PASSTRAN17:45ILO17:540:09M,TU,W,TH,F,SA,SUUNRESERVED58023 Status
18614CPU RNC EXPMURI18:22SLF18:310:09W,F,SUUNRESERVED18614 Status
58142HTE TATA PASSTRAN20:32HNSL21:270:55M,TU,W,TH,F,SA,SUUNRESERVED58142 Status
18616KRIYA YOGA EXPTRAN23:45TUL00:140:29M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18616 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 54 27-04-2023
Hubballi
Press Release No. 54, MEETING CONDUCTED BY SWR WITH IRON ORE FREIGHT CUSTOMERS

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 54 Dt: 27.04.2023

MEETING CONDUCTED BY SWR WITH IRON ORE FREIGHT CUSTOMERS

A Freight Customer Meet was chaired by Shri Sanjeev Kishore, General Manager, South Western Railway o­n 27.04.2023 to discuss various issues related to movement of Iron Ore and increase the rail share in view of recent permission for export of Iron Ore and expansion of Steel Industries. 

Representatives of JSW Steel Limited, Torangallu, JSW Steel Limited, Salem, NMDC Limited, Donimalai, Electrosteel Casting Limited, Rachguneri, Arjas Steel Limited, Tadipatri, Vedanta Limited, Chitradurga and Goa, R. Praveen Chandra Mines, Chitradurga, Kalyani Steels, Ginnigera, Janki Corporation, Ballari, S L R Metalics, Ballari, SMIORE Limited, Sandur, MSPL Limited, Hosapete, KIOCL Limited, Bengaluru Pushpit Steel Limited, Hosapeta attended the meeting and put forward their suggestions to increase loading. Their Representatives also forecasted their expansion plan of their industries during forth coming years.  The officers of South Western Railway noted the suggestions made by the Customers and assured that they will be taken care of.

General Manager elaborated upon the recent developments of Railways in doubling, commissioning of new lines, bye-pass lines, electrification which render hassle-free movement of loaded/empty rakes without traction change/detentions. The infrastructure at Goods sheds are also being improved. He pointed out that now abundant capital investment is being made for upgradation of railway infrastructure after the merger of Railway Budget with General Budget. This has speeded up the infra-development. In 2022-23 he said SWR achieved the highest ever commissioning of new line plus doubling of 228 km, highest ever electrification of 874 RKM. Shri Kishore said that rapid development of infrastructure is imparting confidence to freight customers by reducing bottlenecks, improving transit time etc. which would help to increase modal share of rail transport in the region. He pointed that the infra-upgradation have resulted in improving the mobility of goods trains by 53% from 2021-22 to 2022-23 which was the highest among all railway zones of the country. He assured that all necessary support shall be rendered to the customers. 

While welcoming the customers, it was informed that South Western Railway achieved highest ever loading of 46.67 MT with originating freight revenue of Rs. 4,710 Crs.

  Shri U. Subba Rao, Additional General Manager, Shri Hari Shankar Verma, Principal Chief Operations Manager, Shri Satya Prakash Shastri, Pr. Chief Commercial Manager, Shri Harsh Khare, Divisional Railway Manager, Hubballi, Smt. Shilpi Agarwal, Divisional Railway Manager, Mysuru and other Principal Head of the Departments attended the meeting.

                                                                                                                           Aneesh Hegde
                                                                         Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
Press Release No. 34004-10-2021
Hubballi
Press Release No. 340,SWR COMPLETES THE REGIRDERING OF RAILWAY BRIDGE N. 3 BETWEEN TORANGALLU – RANAJITPURA

           à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY                

प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 340 Dt: 23.09.2021     

SWR COMPLETES THE REGIRDERING OF RAILWAY BRIDGE N. 3 BETWEEN TORANGALLU – RANAJITPURA

South Western Railway completedthe regirdering of Bridge No - 3 between Torangallu – Ranajitpura in Ballari district o­n 22.9.2021 and makes it fit for handling 25 tonne axle loads. This will strengthen the load-bearing capacity of the bridge and enable movement of heavier freight trains achieving better throughput.

Toranagallu-Ranjitpura is an important branch line and handles freight of Iron Ore traffic from National Mineral Development Corporationmines to Jindal Iron and Steel Company Limited, which is the largest integrated steel plant of India. The old bridge was constructed during meter gauge time. The regirdering has been carried out in a time of 3 hrs 15 min, by suspending the trains o­n the route by availing traffic block.

After regirdering, the strength and load-bearing capacity of the bridge has been enhanced This will enable Railways to operate freight trains with 25 tonne axle loads, and more freight can be transported. 


                                                                      Aneesh Hegde

                                                                                        Chief Public Relations Officer          

                                                                                      South Western Railway, Hubballi





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit