For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








13 Trains from (RVN)Rajiv Nagar to (LTT)LOKMANYATILAK T


Address: Rajiv Nagar, Patna Bihar

Station Code: RVN

Station Name: Rajiv Nagar

Zone: ECR/East Central

Train Frequency Weekly: 21

Station Traffic: Low

Address: Kurla, Mumbai, Maharashtra, India

Station Code: LTT

Station Name: LOKMANYATILAK T

Zone: CR/Central

Train Frequency Weekly: 315

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13201RJPB LTT EXPDNR00:13LTT11:3035:17M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13201 Status
12545KARMABHUMI EXPPNBE00:55LTT06:0029:05THUNRESERVED12545 Status
15547JYG LTT JANSADHARAN EXPPNBE00:55LTT07:3030:35MUNRESERVED15547 Status
12361ASN CSTM EXPRESSPNBE00:55DR05:3028:35SU2A,3A,SL,GN,12361 Status
12142PPTA LTT EXPDNR11:07LTT15:1528:08M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12142 Status
12520KYQ LTT AC EXPDNR13:42LTT17:3027:48TH1A,2A,3A,12520 Status
15646GHY LTT EXPDNR13:56LTT20:0030:04W,SU2A,3A,SL,GN,15646 Status
12335BGP LTT EXPRESSDNR14:21LTT20:0029:39TU,F,SU2A,3A,SL,GN,12335 Status
15648GHY LTT EXPRESSDNR14:21LTT20:0029:39TU2A,3A,SL,GN,15648 Status
11062DBG LTT EXPRESSSEE17:12LTT03:4034:28M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11062 Status
15267JANSADHARAN EXPSEE21:27LTT06:0032:33SAUNRESERVED15267 Status
22972PNBE BDTS SF EXPPNBE23:10BVI06:5431:44W2A,3A,SL,GN,22972 Status
22914BDTS HUMSAFARPNBE23:10BDTS07:3532:25TU3A22914 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
762/2022-23 01-04-2023
Chennai
Weekly Special Trains between Lokmanya Tilak Terminus and Kanyakumari



Central Railway has notified Weekly Special Trains in Lokmanya Tilak Terminus – Kanniyakumari Sector as detailed below:


Train No. 01465/01466 Lokmanya Tilak Terminus – Kanniyakumari -   Lokmanya Tilak Terminus Weekly Special Fare Specials:


Train No.01465 Lokmanya Tilak Terminus – Kanniyakumari Weekly Special Fare Special will leave Lokmanya Tilak Terminus at 16.00 hrs o­n 06th, 13th, 20th, 27th April, 04th, 11th, 18th, 25th May & 01st June, 2023 (Thursdays) and reach Kanniyakumari at 23.20 hrs, the next day (9 Services)


In return direction Train No. 01466 Kanniyakumari -   Lokmanya Tilak Terminus Weekly Special Fare Special will leave Kanniyakumari at 14.15 hrs o­n 08th, 15th, 22nd, 29th April, 06th, 13th, 20th, 27th May & 03rd June, 2023 (Saturdays) and reach LokmanyaTilak Terminus at 21.50 hrs, the next day (9 Services)


Coach Composition:1- AC Two Tier Coach, 3- AC Three Tier Coaches, 8- Sleeper Class Coaches, 3- General Second Class Coaches, 2- Second Class Divyangjan Friendly (Total:17)


The details of timings and stoppages of Train No. 01465/01466 Lokmanya Tilak Terminus – Kanniyakumari -   Lokmanya Tilak Terminus Weekly Special Fare Specials are as follows:


Train No.01465 Lokmanya Tilak Terminus – Kanniyakumari Weekly Special Fare Special

↓

Station

↑

Train No. 01466 Kanniyakumari -   Lokmanya Tilak Terminus Weekly Special Fare Special

16.00 (Thursday)

(d)

Lokmanya Tilak Terminus

(a)

21.50 (Sunday)

16.17/16.20

(a/d)

Thane

(a/d)

21.07/21.10

16.55/17.00

(a/d)

Panvel

(a/d)

20.20/20.25

18.20/18.25

(a/d)

Roha

(a/d)

19.10/19.15

20.10/20.12

(a/d)

Chiplun

(a/d)

14.50/14.52

21.50/21.55

(a/d)

Ratnagiri

(a/d)

13.00/13.05

23.30/23.32

(a/d)

Kankavali

(a/d)

10.46/10.48

23.50/23.52

(a/d)

Sindhudurg

(a/d)

10.32/10.34

00.20/00.22

(a/d)

Sawantwadi Road

(a/d)

10.10/10.12

02.00/02.10

(a/d)

Madgaon

(a/d)

08.58/09.00

03.10/03.12

(a/d)

Karwar

(a/d)

07.50/07.52

06.00/06.02

(a/d)

Udipi

(a/d)

05.42/05.44

08.00/08.10

(a/d)

Mangaluru Jn

(a/d)

04.10/04.20

08.49/08.50

(a/d)

Kasaragod

(a/d)

03.05/03.07

09.57/10.00

(a/d)

Kannur

(a/d)

02.00/02.03

11.17/11.20

(a/d)

Kozhikode

(a/d)

00.37/00.40

11.59/12.00

(a/d)

Tirur

(a/d)

00.10/00.12

12.55/13.05

(a/d)

Shoranur

(a/d)

23.15/23.25

13.40/13.43

(a/d)

Thrissur

(a/d)

22.17/22.20

14.55/15.00

(a/d)

Ernakulam Town

(a/d)

20.40/20.45

16.20/16.25

(a/d)

Kottayam

(a/d)

19.00/19.05

16.44/16.45

(a/d)

Tiruvalla

(a/d)

18.14/18.16

17.05/17.06

(a/d)

Chengannur

(a/d)

18.04/18.06

17.28/17.30

(a/d)

2

38603-01-2023
Maligaon
Sivok - Rangpo Rail Project achieved another milestone; Gets breakthrough in Tunnel 12

In another milestone achievement, the Sivok - Rangpo Rail Project has achieved a breakthrough in Tunnel No. 12 o­n 24th December, 2022. This is fifth main tunnel breakthrough in this project which was done in presence of officers of Northeast Frontier Railway, IRCON international limited and construction agency CS-Dhorajia along with local administration of West Bengal.

The length of Tunnel No. 12 is 1406 m located between Tarkhola and Shukia Khola in Kalimpong district of West Bengal. The tunnel traverses through vulnerable and challenging geological conditions of the lesser Himalayan range. To counter vulnerability of the groundmass, latest and most sophisticated tunnelling technology has been adopted. Not o­nly the top class and well experienced engineers from India, but also the highly experienced foreign engineers are involved in this project. Breakthrough of the tunnel was another awaited moment, as there were many difficulties due to poor geology in the new Himalayan range.

Sivok Rangpo New BG Rail Line Project is about 45 km long consisting of 14 nos. tunnels, 17 nos. bridges and 5 nos. stations. 38.65 km of the entire project is passing through tunnels, out of this 25.094 km of tunnel mining work have been completed. At present all the activities related to construction of Tunnels, Bridges and Stations in the project are going o­n war footing basis and targeted to complete by December, 2023.

With its completion, the connectivity of the land locked state Sikkim will get a major boost. o­nce operational, the project will provide overall development for the state. People of the region will get long distance access across the country and uninterrupted supply of essential goods can be done to Sikkim to cater to the needs of the people.



(Sabyasachi De)
CPRO/N.F.Railway





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit