76 Trains from (NDM)NIDAMANURU to (MDUN)MADHURANAGAR
Address: Nidamanuru Railway Station Rd, Vijayawada Andhra Pradesh
Station Code: NDM
Station Name: Nidamanuru
Zone: SCoR/South Coast
Train Frequency Weekly: 121
Station Traffic: Medium
Address: Madhuranagar Railway Station Rd, Madhura Nagar, Vijayawada Andhra Pradesh
Station Code: MDUN
Station Name: Madhura Nagar
Zone: SCoR/South Coast
Train Frequency Weekly: 127
Station Traffic: Medium
RECENT NEWS
1
www.scr.indianrailways.gov.in- 2023-04-27
On completion of Doubling and Electrification work in Gudivada – Bhimavaram Town – Narsapur – Nidadavolu section, T. No. 17281 Guntur - Narsapur Express has been speeded up with the change in timings. The Existing and Revised Public time table (PTT) timings wef 24.04.2023 are as under:-
www.scr.indianrailways.gov.in- 2021-08-17
- This provides continuous double line with electrification connectivity for 141 kms between Vijayawada - Gudivada - Bhimavaram Town and Gudivada - Machilipatnam South Central Railway has completed and commissioned 17 Kms of Double Line & Electric traction oÂÂn Vijayawada - Uppaluru Double Line. The commissioning of Doubling with Electrification between these two stations (Vijayawada – Uppaluru) provides continuous double line rail connectivity, along with electrification, for a combined distance of 141 kms between Vijayawada - Gudivada - Bhimavaram Town and Gudivada – Machilipatnam. This commissioning of double line with electrification is part of the Vijayawada – Gudivada – Bhimavaram – Narsapur, Gudivada – Machilipatnam & Narsapur – Nidadavolu Doubling and Electrification project. The project was sanctioned in the year 2011-12 for a distance of 221 Kms at an estimated cost of Rs. 3,000 Crore, and is being executed by RVNL (Rail Vikas Nigam Limited). This is a prestigious project in the coastal belt of Andhra Pradesh and boosts the development of the region. Out of the total project length of 221 Kms project, a total of 141 Kms has now been completed and commissioned. Works in the remaining sections, i.e., between Nidadavolu - Narsapur for a distance of 70 Route Kms, are progressing at a fast pace and is nearing completion. Salient Features of the newly completed Double line with Electrification - · Entire track is designed to handle 25 T Axle loads with a speed potential of 110 kmph, · 2 Major bridges with PSC Girders and 18 Minor bridges have been constructed. · Passenger amenities at all the stations viz., Uppaluru, Nidamanuru and Ramavarappadu have been strengthened with well planned circulating area, booking concourse, convenient platforms, drinking water facilities, foot over bridges etc. · Three Station yards of Uppaluru, Nidamanuru and Ramvarappadu has been remodeled with standard double line layout with modern facilities. · Cut and Connection method is used wherever possible and hence almost the entire line is commissioned with maximum permissible speed. · Indigenously built Centralized Architecture Electronic Interlocking has been installed at 3 stations Uppaluru, Nidamanuru, Ramavarappadu to ensure safety at the highest level. · Electrically operated Lifting Barriers have been installed at 7 Railway Level Crossing Gates in the section with good road surface and indication boards. Benefits ü This infrastructure development project will significantly strengthen Rail transport infrastructure by providing seamless movement of freight and passenger traffic oÂÂn rails. ü The new double rail line will increase mobility and serve public aspirations with regard to rail transportation. ü Economy of hinterland will see leverage with boost in transport of Agriculture and Aqua products. ü The electrification works will help in saving energy and reducing fuel expenditure besides reducing carbon foot print. ü This line also serves as the viable alternate railway line for the coastal rail corridor between Vijayawada - Visakhapatnam. Shri Gajanan Mallya, General Manager, SCR complimented the officials of Vijayawada Division & RVNL for completing the project works as per schedule. The General Manager advised RVNL authorities to complete the project in pro-active approach so that the entire project is completed & commissioned at the earliest, thereby fulfilling the needs of the Coastal Belt of Andhra Pradesh. He also instructed the Railway officials to extend all the possible help in execution of project at a faster pace.
COMMENTS
NO Comments. Be the first to Comment...
|