For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








23 Trains from (NAN)NANDGAON ROAD to (VEER)VEER


Address: Maharashtra 416601, India

Station Code: NAN

Station Name: NANDGAON ROAD

Zone: KR/Konkan

Train Frequency Weekly: 63

Station Traffic: Medium

Address: National Highway 17, Maharashtra, India

Station Code: VEER

Station Name: VEER

Zone: KR/Konkan

Train Frequency Weekly: 93

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
01036SWV CSMT SPLVBW00:40VEER06:205:40M,TU,W,TH,F,SA,SU3A,SL,GN,01036 Status
09415SWV ADI SPLVBW08:10VEER13:004:50W2A,3A,SL,GN,09415 Status
01448KRMI PNVL SPLVBW08:22MNI15:307:08SA3A,SL,GN,01448 Status
01434SWV PNVL SPLVBW08:22MNI15:307:08SU3A,SL,GN,01434 Status
01048SWV LTT SPLVBW08:22MNI14:005:38M3A,SL,GN,01048 Status
09002MAJN MMCT EXPVBW09:20VEER14:505:30TH2A,3A,SL,GN,09002 Status
09010MAJN BDTS EXPVBW09:20VEER14:505:30W2A,3A,SL,GN,09010 Status
09012MAJN BDTS EXPVBW09:20VEER14:505:30M2A,3A,CC,09012 Status
50106SWV DIVA PASSVBW09:57VEER15:355:38M,TU,W,TH,F,SA,SU2S,GN,50106 Status
09105SWV BRC SPLKKW10:54MNI17:386:44M2A,3A,SL,GN,09105 Status
01044SWV PNVL SPECIALVBW11:22MNI17:386:16SA2A,3A,SL,GN,01044 Status
10104MANDOVI EXPRESSVBW11:32MNI17:015:29M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN,10104 Status
16338OKHA EXPRESSKKW12:10MNI19:086:58W,F2A,3A,SL,GN,16338 Status
01042ZARP PNVL SPLVBW12:22VEER20:007:38F2A,3A,SL,GN,01042 Status
01014THIVIM LTT SPLVBW14:02MNI21:107:08SU2A,3A,SL,GN,01014 Status
01008SWV CSMT SPLVBW16:44VEER22:125:28TH,SA3A,SL,GN,01008 Status
01002SWV CSMT SPLVBW16:44VEER22:125:28M,TU,W,F,SU3A,SL,GN,01002 Status
01070PERN LTT SPECIALVBW17:02VEER23:206:18F2A,3A,SL,GN,01070 Status
01040ZARP LTT SPLVBW17:02VEER23:206:18M2A,3A,SL,GN,01040 Status
09008THVM MMCT SPLVBW18:40VEER02:307:50TU,F2A,3A,SL,GN,09008 Status
09417THVM ADI SPLVBW18:40VEER02:307:50SA2A,3A,SL,GN,09417 Status
11004TUTARI EXPRESSVBW19:02VEER01:166:14M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11004 Status
10112KONKAN KANYA EXPVBW19:46MNI02:016:15M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,10112 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
15-05-2023
General Manager awarded 06 railway staff of NCR for extraordinary commitment towards safety

*General Manager awarded 06 railway staff of NCR for extraordinary commitment towards safety*

*Shri Lokesh Nain conferred  with "Employee of the Month Award" for the month of April*

On 09.05.2023 General Manager, North Central Railway, Shri Satish Kumar conferred awards to staff for their alertness and contribution towards safety in train operations in the presence of PHODs of North Central Railway. 06 Railway staff were conferred with Safety awards by the General Manager o­n the occasion.

Awardees include Mr. Rambaran Bind, Pointsman/Gaipura/Prayagraj Division, Mr. Kishore Kumar, Loco Pilot, Veerangana Laxmibai, Jhansi Division, Mr. Utkarsh Bisaria, Assistant Loco Pilot/ Veerangana Laxmibai, Jhansi Division, Mr. Shyam Kumar, Loco Pilot/Agra Cantt./Agra Division , Mr. Birendra Kumar Yadav, Assistant Loco Pilot/ Agra Cantt/ Agra Division and Mr. Lokesh Nain, Constable/ Phaphund/ Prayagraj Division

Mr. Lokesh Nain, has been conferred with the awarded of the Employee of the month Safety Award for April, 2023. Mr. Lokesh Nain saved the life of an alighting passenger who slipped from the train no 14163 o­n dt 16.04.2024 and was about to fall o­n the tracksunder the train.

Due to his timely, vigilant and prompt action, the life of passenger could be saved.

He has rendered excellent service in the line of his duty with extraordinary commitment and full dedication.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit