28 Trains from (MSH)MAHESANA JN to (AII)AJMER JN
Address: Mehsana Railway Station, Mehsana, Gujarat 384001, India
Station Code: MSH
Station Name: MAHESANA JN
Zone: WR/Western
Train Frequency Weekly: 342
Station Traffic: High
Address: Ajmer Junction, Ajmer, Rajasthan 305001, India
Station Code: AII
Station Name: AJMER JN
Zone: NWR/North Western
Train Frequency Weekly: 425
Station Traffic: High
RECENT NEWS
1
www.wr.indianrailways.gov.in- 2023-06-08
WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN on SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR For the convenience of passengers and with a view to meet the travel demand, Western Railway has decided to run summer special train on Special fare between Udhna - Bhagat Ki Kothi and between Bandra Terminus - Gorakhpur. According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of the train are as under: 1.Train No. 04814/04813 Udhna – Bhagat Ki Kothi Superfast Special [8 TRIPS] Train No. 04814 Udhna – Bhagat Ki Kothi Special will depart from Udhna every Sunday at 05.50 hrs. & will reach Bhagat Ki Kothi at 18.00 hrs. the same day. This train will run from 11th June, 2023 to 02nd July, 2023. Similarly, Train No. 04813 Bhagat Ki Kothi – Udhna Superfast Special will depart from Bhagat Ki Kothi every Saturday at 16.00 hrs. & will reach Udhna at 04.00 hrs. the next day. This train will run from 10th June, 2023 to 01st July, 2023. Enroute this train will halt at Bharuch, Vadodara, Anand, Ahmedabad, Sabarmati, Mahesana, Palanpur, Abu Road, Falna, Marwar, Pali Marwar and Luni stations in both directions. This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second-Class Coaches. 2.Train No. 05054/05053 Bandra Terminus - Gorakhpur Special [2 Trips] Train No. 05054 Bandra Terminus – Gorakhpur Special will depart from Bandra Terminus on Saturday, 10th June, 2023 at 22.45 and reach Gorakhpur at 06.25 hrs on Monday. Similarly, Train No. 05053 will depart from Gorakhpur on Friday, 9th June, 2023 at 09.30 hrs and arrive Bandra Terminus at 16.00 hrs, the next day. Enroute this train will halt at Borivali, Vapi, Surat, Vadodara, Ratlam, Kota, Gangapur City, Agra fort, Tundla, Kanpur Central, Aishbag, Badshah Nagar, Gonda, Basti and Khalilabad stations in both directions. This train comprises General Second Class coaches. The booking for Train No. 04814 will open from 09.06.2023 at all PRS Counters and on IRCTC website. The above trains will run as special train on special fare. For detailed information regarding timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in. ********* 2
www.cr.indianrailways.gov.in- 2023-05-23
General Manager reviews monsoon preparations Central Railway gears up with monsoon preparations Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling were also present. The details of measures taken for ensuring uninterrupted services are as under- 1)More Water Pumps- 24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP. The locations identified on main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and on Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc. 2)Micro tunnelling- Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section. 3)Desilting of drains- Central Railway has targeted de-silting and cleaning of 118.48 kms of drains on its suburban section of which, work has been completed for 102.39 kms and work is presently in progress on cleaning of another 16 kms of drains. 4)Cleaning of culverts- CR has cleaned 88 culverts on its suburban sections, and work is presently in progress on cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar. 5)Trimming of Trees- Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees. 6)Muck removal- Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck on Main lines. 7)Lifting of tracks- 47.8 km track lifting planned, it will be completed till next month. 8) Works done in Ghat Section- -45 meters of Tunnel Portal -300 mts of Rockfall Barrier -500 sq mts of Boulder Netting -40 mts of Canadian Fencing -160 mts of Stabilization of banks -tunnel sounding- 18 locations 9)Separate pumps will be provided for RUBs- at 14 locations. 10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve. 11)Other Important works in progress- ·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week. ·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections. ·Waterproof point motor machines provided at- 277 locations. ·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month. ·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas. ·Bunter Bhavan nallah at LTT to be connected by removing encroachments. ·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders. ·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti. 12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed. 13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates. 14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period. 15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC. --- --- --- Date: May 23, 2023 PR No. 2023/05/23 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivraj Manaspure) Chief Public Relations Officer |