For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








11 Trains from (LKO)LUCKNOW NR to (SKB)SHIKOHABAD JN


Address: Lucknow Railway Station, Kanpur Road, Railway Colony, Charbagh, Lucknow, Uttar Pradesh, India

Station Code: LKO

Station Name: LUCKNOW NR

Zone: NR/Northern

Train Frequency Weekly: 860

Station Traffic: High

Address: Shikohabad Railway Station, MDR 77W, Shikohabad, Uttar Pradesh 283141, India

Station Code: SKB

Station Name: SHIKOHABAD JN

Zone: NCR/North Central

Train Frequency Weekly: 255

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14865MARUDHAR EXPRESLKO00:15SKB04:294:14TH2A,3A,SL,GN,14865 Status
14863MARUDHAR EXPRESLKO00:15SKB04:294:14TU,F,SU2A,3A,SL,GN,14863 Status
14853MARUDHAR EXPRESLKO00:15SKB04:294:14M,W,SA2A,3A,SL,GN,14853 Status
12419GOMTI EXPLKO06:00SKB10:264:26M,TU,W,TH,F,SA,SU1A,2A,CC,2S,GN,12419 Status
12875NEELACHAL EXPLKO13:45FZD17:484:03TU,F,SU2A,3A,SL,GN,12875 Status
12179LJN AF INTERCITYLJN15:55SKB20:094:14M,TU,W,TH,F,SA,SUCC,2S,GN,12179 Status
15707KIR ASR EXPRESSBNZ17:33FZD22:264:53M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15707 Status
19040AVADH EXPRESSGTNR19:06SKB01:246:18TU,TH,SU2A,3A,SL,GN,19040 Status
19038AVADH EXPRESSGTNR19:06SKB01:246:18M,W,F,SA2A,3A,SL,GN,19038 Status
13483FARAKKA EXPRESSLKO19:10SKB23:304:20TU,W,F,SU2A,3A,SL,GN,13483 Status
13413FARAKKA EXPRESSLKO19:10SKB23:304:20M,TH,SA2A,3A,SL,GN,13413 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2021/0129-01-2021
Mumbai
WESTERN RAILWAY TO ATTACH ADDITIONAL COACHES ON TEMPORARY BASIS IN 12 PAIRS OF TRAINS

Press Release No.2021/1   Mumbai, 29th January, 2021

WESTERN RAILWAY TO ATTACH ADDITIONAL COACHES o­n TEMPORARY BASIS IN 12 PAIRS OF TRAINS

For the convenience of passengers and to clear extra rush, Western Railway has decided to augment 12 pair of trains o­n temporary basis.

The details of the trains augmented o­n Temporary basis are as under:-

1.Train No. 02971/02972 Bandra Terminus – Bhavnagar Terminus Express will be augmented with an additional Sleeper Class coach. Ex Bandra Terminus (Tuesday, Thursday & Saturday) from 02/02/2021 to 27/02/2021 and Ex Bhavnagar Terminus (Monday, Wednesday & Friday) from 01/02/2021 to 26/02/2021.

2.Train No. 09455/09456 Bandra Terminus – Bhuj Express will be augmented with an additional Sleeper Class coach. Ex Bandra Terminus (Daily) from 02/02/2021 to 01/03/2021 and Ex Bhuj (Daily) from 01/02/2021 to 28/02/2021.

3.Train No. 09115/09116 Dadar – Bhuj Express will be augmented with an additional Sleeper Class coach. Ex Dadar (Daily) from 02/02/2021 to 01/03/2021 and Ex Bhuj (Daily) from 01/02/2021 to 28/02/2021.

4.Train No. 09021/09022 Bandra Terminus – Lucknow Ne Express will be augmented with an additional Sleeper Class coach. Ex Bandra Terminus (Saturday) from 06/02/2021 to 27/02/2021 and Ex Lucknow Ne (Sunday) from 07/02/2021 to 28/02/2021.

5.Train No. 09017/09018 Bandra Terminus – Haridwar Jn Express will be augmented with an additional Sleeper Class coach. Ex Bandra Terminus (Wednesday) from 03/02/2021 to 24/02/2021 and Ex Haridwar Jn (Thursday) from 04/02/2021 to 25/02/2021.

6.Train No. 09051/09052 Valsad - Muzaffarpur Express will be augmented with an additional Sleeper Class coach. Ex Valsad (Saturday) from 06/02/2021 to 27/02/2021 and Ex Muzaffarpur (Monday) from 08/02/2021 to 01/03/2021.

7.Train No. 09111/09112 Valsad – Haridwar Jn Express will be augmented with an additional Sleeper Class coach. Ex Valsad (Tuesday) from 02/02/2021 to 23/02/2021 and Ex Muzaffarpur (Wednesday) from 03/02/2021 to 24/02/2021.

8.Train No. 09209/09210 Valsad - Puri Express will be augmented with an additional Sleeper Class coach. Ex Valsad (Thursday) from 04/02/2021 to 25/02/2021 and Ex Puri (Sunday) from 07/02/2021 to 28/02/2021.

9.Train No. 02941/02942 Bhavnagar Terminus – Asansol Jn Express will be augmented with an additional Sleeper Class coach. Ex Bhavnagar Terminus (Tuesday) from 02/02/2021 to 23/02/2021 and Ex Asansol Jn (Thursday) from 04/02/2021 to 25/02/2021.

10.Train No. 09063/09064 Udhna Jn (Surat) - Danapur Express will be augmented with an additional Sleeper Class coach. Ex Udhna Jn (Tuesday & Saturday) from 02/02/2021 to 27/02/2021 and Ex Danapur (Wednesday & Sunday) from 03/02/2021 to 28/02/2021.

11.Train No. 09057/09058 Udhna Jn (Surat) - Manduadih Express will be augmented with an additional Sleeper Class coach. Ex Udhna Jn (Friday) from 05/02/2021 to 26/02/2021 and Ex Manduadih (Sunday) from 07/02/2021 to 28/02/2021.

12.Train No. 09263/09264 Porbandar – Delhi S. Rohilla Express will be augmented with an additional Sleeper Class coach. Ex Porbandar (Tuesday & Saturday) from 02/02/2021 to 27/02/2021 and Ex Delhi S. Rohilla (Monday & Thursday) from 04/02/2021 to 01/03/2021.

**********************





2
10-12-2020
Focus on Safety and Mobility-North Central Railway completed many important works in November-2020

North Central Railway

Headquarter

Public Relations

Prayagraj

 

No. 11PR/12/2020                            Press ReleaseDate: 03.12.2020

 

Focus o­n Safety and Mobility-North Central Railway completed many important works in November-2020

 

Despite o­ngoing Covid-19 pandemic, North Central Railway achieved many milestones in November-2020. Besides surpassing last year originating freight loading and achieving highest interchange of 532 freight trains o­n 30.11.20, NCR also completed many important works of infrastructure development and safety related maintenance of assets during November-2020.

 

For safety of road users 04 RUBs o­ne each in Prayagraj- Kanpur, Shikohabad-Farukhabad, Mathura-Alwar and Dholpur-Agra sections were commissioned in Nov’20 and so far, 09 RUBs have been commissioned in the current financial year. Manned level crossing no.58 in Kanpur-Tundla section was closed during the month and total 28 manned level crossings have been closed in current financial year till November-2020. Provision of power lifting barriers at two level crossings, sliding booms at two level crossings and secured communication between station and gateman at 08 LCs are other important road user safety works completed in November-2020.

 

North central Railway operates more than 120 trains at 130 Kmph or higher speeds and its trunk routes carry very density freight and passenger traffic. This calls for impeccable maintenance of track and other assets. In November-2020, 38 kms track renewal was done with cumulative renewal of283 kms track in current financial year.To enhance safety and speed of trains over point and crossing zone, 08 nos. thick web switches have been provided in Nov’2020 and so far, 30 thick web switches have been commissioned in FY 2020-21.

 

46 routes electronic interlocking (EI) at Mauranipur station in Jhansi division commissioned in November 2020. With completion of this work all electro-mechanical signaling in Jhansi-Banda section have been replaced with latest electronic interlocking/ panel interlocking/ standard-IIIinterlocking. Similarly, commissioning of 45 routes EI at Malanpur station o­n 10.11.20 paved the way for replacement of electro-mechanical signaling in Gwalior-Bhind section. In November 11.88 km route between Prempur and Aung stations o­n Prayagraj division was equipped with automatic signaling which will enhance train handling capacity in this section.

 

In the field of rolling stock maintenance,intermediate overhauling (IOH) of 32coaches, shop schedule (SS-I) of25LHB coaches, periodic overhauling(POH) of 30 coaches, routine overhauling (ROH) of 288 wagons and periodicoverhauling (POH) of 751wagons were done by depots and workshops of NCR in November- 2020 to ensure safe and detention free train operations.

 

In view of foggy and cold weather, safety seminars o­n prevention of signal passing at danger (SPAD); safe train operation during foggy weather; precaution to taken during shunting operation; precautions for workman at worksite and cold weather patrolling and action to be taken in case of rail fracture etcwere organized at different stations, crew lobbies, yards etc. of Agra, Jhansi and Prayagraj division.

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit