For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








11 Trains from (GDGN)Gaudgaon to (nw)nalwar


Address: Bhognalli Sindnoor Rd Karnataka

Station Code: GDGN

Station Name: Gaudgaon

Zone: CR/Central

Train Frequency Weekly: 31

Station Traffic: Low

Address: Nalwar Railway Station, Karnataka 585218, India

Station Code: NW

Station Name: NALWAR

Zone: SCR/South Central

Train Frequency Weekly: 107

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
71301SUR GTL PASSSVG05:45NW07:542:09M,TU,W,TH,F,SA,SUUNRESERVED71301 Status
17319SECUNDRABAD EXPGUR06:25WADI07:551:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17319 Status
12701HUSAINSAGAR EXPGUR06:50WADI08:351:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12701 Status
11013COIMBATORE EXPGUR08:10WADI09:551:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11013 Status
11027CHENNAI MAILGUR11:15NW13:141:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11027 Status
57659SUR FM PASSSVG12:31WADI14:101:39M,TU,W,TH,F,SA,SUUNRESERVED57659 Status
57133BJP RC PASSSVG17:40NW19:241:44M,TU,W,TH,F,SA,SUUNRESERVED57133 Status
11301UDYAN EXPRESSGUR17:45NW19:592:14M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11301 Status
17308BASAVA EXPRESSGUR21:05NW23:092:04M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17308 Status
17031HYDERABAD EXPDUD23:30WADI01:251:55M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17031 Status
57129BOLARUM PASSRSVG23:33WADI02:152:42M,TU,W,TH,F,SA,SUSL,GN,57129 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.82//2022-2329-04-2022
Secunderabad
SCR PR No.82 dt.28.04.2022 (English&Telugu) on


Shri Arun Kumar Jain, General Manager (In-charge), SCR undertook a comprehensive inspection of o­ngoing infrastructural developmental works between Guntakal – Nalwar Section of Guntakal Division today i.e., 28th April, 2022. He was accompanied by
Shri K.
Venkatramana Reddy, Divisional Railway Manager, Guntakal Division and Senior Officials from Headquarters and Division.

Shri Arun Kumar Jain conducted Rear Window Inspection commencing from Guntakal to Adoni and later upto Nalwar section to check track maintenance and safety aspects. At Adoni Railway Station the General Manager inspected various passenger amenities, food stalls, circulating area and had a discussion with officials o­n further development of facilities. Later, he visited the goods shed at Adoni, wherein he examined the freight loading facilities.

The General Manager proceeded o­nto Raichur, where he examined loading facilities at Goods Shed, facilities available for Hamalis rest room etc., he inspected and reviewed various amenities including ticket booking counters, station masters office and circulating area at Raichur railway station. During the course of inspection passenger association members and employees trade union association members met General Manager, SCR during the inspection of Raichur railway station.

Shri Arun Kumar Jain inspected Yermaras railway station and held meeting with representatives of Karnataka Power Corporation Limited. He also inspected Goods Sheds and various passenger amenities at Krishna Railway station and discussed with officials o­n further improvements to Goods Sheds and loading facilities. o­n conclusion, the General Manager inspected the passenger amenities provided at Yadgir railway station and also inspected Goods Sheds and enquired with the officials about the loading facilities provided.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit