For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








19 Trains from (BDC)BANDEL JN to (JAJ)JHAJHA


Address: Bandel, West Bengal, India

Station Code: BDC

Station Name: BANDEL JN

Zone: ER/Eastern

Train Frequency Weekly: 457

Station Traffic: High

Address: Jhajha, SH 18, Jhajha, Bihar 811308, India

Station Code: JAJ

Station Name: JHAJHA

Zone: ECR/East Central

Train Frequency Weekly: 431

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
53049HWH MKA PASBDC00:19JAJ08:388:19M,TU,W,TH,F,SA,SUSL,2S,GN,53049 Status
53520GRD LINK PAS EXBDC06:01JAJ03:202:41M,TU,W,TH,F,SA,SU3A,SL,GN,53520 Status
53131SDAH MFP FAST PGRBDC07:40JAJ15:357:55M,TU,W,TH,F,SA,SUUNRESERVED53131 Status
11105PRATHAM S S EXPBP07:57JAJ14:256:28SU3A,SL,GN,11105 Status
13007U ABHATOOFAN EXPBDC10:37JAJ16:406:03M,TU,W,TH,F,SA,SU3A,SL,GN,13007 Status
13137KOAA AMH EXPRESSBDC12:52JAJ18:556:03M2A,3A,SL,GN,13137 Status
13105SDAH BUI EXPRESBDC14:35JAJ20:456:10M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13105 Status
13049AMRITSAR EXPBDC15:11JAJ21:556:44M,TU,W,TH,F,SA,SU3A,SL,GN,13049 Status
15051KOAA GKP EXPBDC15:47JAJ21:055:18F2A,3A,SL,GN,15051 Status
15049KOAA GKP EXPBDC15:47JAJ21:055:18W,SU2A,3A,SL,GN,15049 Status
15047PURBANCHAL EXPBDC15:47JAJ21:055:18M,TU,TH,SA2A,3A,SL,GN,15047 Status
13021MITHILA EXPRESSBDC16:54JAJ23:216:27M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13021 Status
13185GANGASAGAR EXPBDC19:11JAJ00:595:48M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13185 Status
13131KOAA PNBE EXPBDC21:11JAJ03:206:09M,TU,W,TH,F,SA,SU3A,SL,GN,13131 Status
13157TIRHUT EXPRESSNH21:45JAJ04:106:25TU2A,3A,SL,GN,13157 Status
13155MITHILANCHAL EXPNH21:45JAJ04:106:25TH,SU2A,3A,SL,GN,13155 Status
13135KOAA JYG EXPBDC22:17JAJ04:105:53SA2A,3A,SL,GN,13135 Status
13019BAGH EXPRESSBDC22:39JAJ04:255:46M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13019 Status
13043HWH RXL EXPRESSBDC23:55JAJ05:556:00W,F2A,3A,SL,GN,13043 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
24-01-2023
Press Release:WINTER SPECIAL TRAIN TO RUN BETWEEN KOLKATA & NEW JALPAIGURI

WINTER SPECIAL TRAIN TO RUN BETWEEN KOLKATA & NEW JALPAIGURI

Kolkata, January 21, 2023


  In a bid to clear extra rush of passengers during winter season, Railway has decide to run o­ne more special train between Kolkata & New Jalpaiguri.

  03105 Kolkata – New Jalpaiguri Winter special will leave Kolkata at 23:30 hrs o­n 25.01.2023 to reach New Jalpaiguri at 10:10 hrs o­n the next day and 03106 New Jalpaiguri – Kolkata Winter special will leave New Jalpaiguri at 12:00 hrs o­n 26.01.2023 to reach Kolkata at 00:50 hrs o­n the next day. The special trains will stop at Naihati, Bandel, Katwa, Azimganj, Jangipur Road, Malda Town, Barsoi, Kishanganj & Aluabari Road stations in both directions enroute.

  The train will have General Second Class, Sleeper Class and Air Conditioned coaches. Special charge in addition to normal fare will be realised. No concessional booking is allowed. Tatkal quota will not be available. 

  The booking of tickets for 03105 Kolkata – New Jalpaiguri Winter special train will be available through PRS counters and internet o­n and from 22.01.2023.





2
24-01-2023
Press Release:ER CONSTRUCTED ANOTHER LIMITED HEIGHT SUBWAY BETWEEN JIRAT AND GUPTIPARA STATIONS

ER CONSTRUCTED ANOTHER LIMITED HEIGHT SUBWAY BETWEEN JIRAT AND GUPTIPARA STATIONS

Kolkata, January 23, 2023:


In accomplishment of Eastern Railway's mission  of increasing sectional speed by replacing level crossings, construction wing of ER's Howrah Division completed the construction work for a Limited Height Subway (LHS) in replacement of Level Crossing Gate No. 6/2 between Jirat and Guptipara stations in Bandel - Katwa section. The construction work for this LHS completed o­ne hour before the scheduled duration of  traffic and power block was taken for this purpose o­n 22.1.2023,  which was possible due to better planning and perfect coordination in between various departments of Eastern Railway at work site.

Nine (09) precast reinforced cement concrete segments of size 7.2m×5.85m were placed safely to complete the tunnel of the LHS. Construction of this Limited Height Subway will not o­nly enhance sectional speed by increasing average speed of Mail/Express as well as Goods trains but also ensure safety for both Rail and Road traffic. Besides, early construction of this LHS will provide more operational flexibilities and at the same time it will significantly bring down green house gas in the locality by diminishing bunching of road traffic.

  In shadow of this traffic block, various other capacity building and safety related work were also accomplished for the sake of  seamless train operations by minimising the need for separate traffic block.





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit