For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








28 Trains from (PIS)PISKA F S to (ITKY)ITKY


Address: Ranchi Jharkhand

Station Code: PIS

Station Name: Piska

Zone: SER/South Eastern

Train Frequency Weekly: 49

Station Traffic: Low

Address: Ranchi Jharkhand

Station Code: ITKY

Station Name: Itki

Zone: SER/South Eastern

Train Frequency Weekly: 49

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18312BSB SBP EXPRESSRNC04:25HTE04:400:15M,TH2A,3A,SL,GN,18312 Status
18621PATLIPUTRA EXPNKM05:00HTE05:450:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18621 Status
58651RNC LAD PASSPIS05:20NRKP05:490:29M,TU,W,TH,F,SA,SUUNRESERVED58651 Status
18615KRIYA YOGA EXPNKM06:40HTE07:300:50M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18615 Status
18623IPR BRKA EXPNKM07:55HTE08:450:50M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18623 Status
15028MAURYA EXPRESSRNC07:55HTE08:100:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15028 Status
58652LAD RNC PASSPIS08:07AOR08:200:13M,TU,W,TH,F,SA,SUUNRESERVED58652 Status
58660ROU HTE PASSLOM08:40HTE10:402:00M,TU,W,TH,F,SA,SUUNRESERVED58660 Status
68037RNC TORI PASSPIS09:15NRKP09:410:26M,TU,W,TH,F,SA,SUUNRESERVED68037 Status
18310JAT SBP EXPNKM09:20HTE10:050:45M,TU,W,TH,F,SA,SU3A,SL,GN,18310 Status
58143TATA HTE PASSNKM09:25HTE10:251:00M,TU,W,TH,F,SA,SUUNRESERVED58143 Status
58161HTE JSG PASSHTE11:20LOM11:390:19M,TU,W,TH,F,SA,SUUNRESERVED58161 Status
68038TORI RNC PASSPIS14:00AOR14:140:14M,TU,W,TH,F,SA,SUUNRESERVED68038 Status
58162JSG HTE PASSLOM14:40HTE17:302:50M,TU,W,TH,F,SA,SUUNRESERVED58162 Status
13351DHN ALAPPUZHA ERNC15:05HTE15:200:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
68039RNC LAD PASSPIS15:20NRKP15:410:21M,TU,W,TH,F,SA,SUUNRESERVED68039 Status
63503BWN HTE PASSNKM16:05HTE17:151:10M,TU,W,TH,F,SA,SUUNRESERVED63503 Status
12818JHARKHAND EXPRERNC16:25HTE16:500:25M,TH,SA2A,3A,SL,GN,12818 Status
58659HTE ROU PASSHTE16:40LOM17:040:24M,TU,W,TH,F,SA,SUUNRESERVED58659 Status
58661TATA HTE PASSNKM17:02HTE17:450:43M,TU,W,TH,F,SA,SUUNRESERVED58661 Status
68040LAD RNC PASSPIS18:00AOR18:140:14M,TU,W,TH,F,SA,SUUNRESERVED68040 Status
58025KGP HTE PASSNKM18:25HTE19:301:05M,TU,W,TH,F,SA,SUUNRESERVED58025 Status
58657RNC LAD PASSPIS19:15NRKP19:440:29M,TU,W,TH,F,SA,SUUNRESERVED58657 Status
12874JHARKHAND EXPRNC19:35HTE19:550:20TU,W,F2A,3A,SL,GN,12874 Status
12831BBS GARIB RATHRNC20:05HTE20:200:15M,W,SA3A12831 Status
18625PRNC HTE EXPRESSRNC20:45HTE21:050:20M,TU,W,TH,F,SA,SU3A,GN,18625 Status
07010BJU SC SPLRNC21:25HTE21:400:15W2A,3A,SL,GN,07010 Status
58658LAD RNC PASSTGB21:32ITKY21:410:09M,TU,W,TH,F,SA,SUUNRESERVED58658 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
06-12-2020
CONTINUATION OF RANCHI-SASARAM FESTIVAL SPECIAL WITH REVISED TIMINGS UPTO DECEMBER, 2020

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्ति

PRESS RELEASE

CONTINUATION OF RANCHI-SASARAM FESTIVAL SPECIAL WITH REVISED TIMINGS UPTO DECEMBER, 2020

 

Kolkata, 6th December, 2020:

With a view to cater to the rush of passengers, South Eastern Railway has decided to continue the running of 08635/08634 Ranchi-Sasaram-Ranchi Festival Special with revised timings upto December 2020.

 

08635 Ranchi-Sasaram Festival Special will leave Ranchi at 17.00 hrs daily (except Saturday) from 08.12.2020 to 30.12.2020 and will reach Sasaram at 01.00 hrs, the next day.

 

In the return direction, 08634 Sasaram-Ranchi Festival Special will leave Sasaram at 03.40 hrs daily (except Sunday) from 09.12.2020 to 31.12.2020 and will reach Ranchi at 10.15 hrs, the same day.

 

The Special train will stop at Piska, Lohardaga, Tori, Daltangang, Garwa Road, Japla and Dehri o­n Sone between Ranchi and Sasaram.

 

 

 

........





2
06-02-2020
HIGHLIGHTS OF BUDGET GRANT OF DIFFERENT PLAN HEADS OVER SOUTH EASTERN RAILWAY

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्तिPRESS RELEASE

 

 

HIGHLIGHTS OF BUDGET GRANT OF DIFFERENT

PLAN HEADS OVER SOUTH EASTERN RAILWAY

 

Kolkata, 6th February, 2020:

 

 

South Eastern Railway is o­ne of the leading zonal railways which contributes major share to Indian Railways’ earnings. For SER’s infrastructural development and o­ngoing projects & works, a gross amount of Rs.5401 crores including Extra Budgetary Resources (EBR) has been allotted in the Budget of 2020-21.

 

In the major Plan Head, the following amount has been allotted for the financial year 2020-21 through budget grant:

 

ØFor the Doubling Projects an amount of Rs.993.00 crores has been granted

ØFor Level Crossings related to road safety an amount ofRs.42.86 crores has been granted

ØFor Road Over Bridges & Road Under Bridges an amount of Rs.248.59 crores has been granted

ØFor Track Renewal works an amount of Rs.840 crores has been granted

ØFor Bridge Works an amount of Rs.33 crores has been granted

ØFor Passenger Amenities an amount of Rs.151.83 crores has been granted

ØFor Staff Welfare an amount of Rs.39.29 crores has been granted

 

Apart from the above, following New Works have been sanctioned for better connectivity and smooth operations in SER jurisdiction along with other o­ngoing developmental works.

 

ØKiriburu-Barbil (24.5 KM) New Line at an estimated cost of Rs.705.17 crores

ØBhojudih-Talgoria (12.5 KM) Doublingat an estimated cost of Rs.129 crores

ØMuri-Barkakana (58 KM) Doubling at an estimated cost of Rs.580 crores

ØRourkela-Bondamunda A Cabin 5th Line (10 KM) at an estimated cost of Rs.169.65 crores

 

Budgetary allotment of some major of the o­ngoing projects:

 

Plan Head

 

Name of the Project

Length

(KM)

Budget Allotment 2020-21 (Rs. In Crores)

 

 

 

 

 

Doubling/

3rd Line

Kharagpur-Adityapur 3rd Line

132

310

Kharagpur-Narayangarh 3rd Line

20

40

Monohar-Bondamunda 3rd Line

30

35

Rourkela-Jharsuguda 3rd Line

101

170

Bondamunda-Ranchi Doubling

158.5

199.79

Narayangarh-Bhadrak 3rd Line

155

50

Bondamunda-Rourkela 4th Line

9.3

23

Dumetra-Link C Line – Connection with Bisra Station

2.3

23

Lodhma-Piska Link Line bypassing Hatia/Ranchi

17.2

16

Talgoria-Bokaro N Cabin Doubling

38

51

Purulia-Kotshila Doubling

36

10

 

Electrification

Rupsa-Bangriposi

89

20

Bankura-Masagram

118

30

Tatanagar-Badampahar

89

20

 

 

***********






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit