For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








29 Trains from (JGG)JANGIGANJ to (MBS)MADHOSINGH


Address: Allahabad Uttar Pradesh

Station Code: JGG

Station Name: Jangiganj

Zone: NER/North Eastern

Train Frequency Weekly: 47

Station Traffic: Low

Address: Uttar Pradesh 221301, India

Station Code: MBS

Station Name: MADHOSINGH

Zone: NER/North Eastern

Train Frequency Weekly: 67

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13202LTT RJPB EXPMNF00:12MZP02:001:48M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13202 Status
14258KASHI V EXPRESSSAW02:28PRF02:530:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,14258 Status
54292PBH BSB PASSSAW06:35PRF07:040:29M,TU,W,TH,F,SA,SUUNRESERVED54292 Status
75106ALY MAU DMUJGG06:50KWH07:490:59M,TU,W,TH,F,SAUNRESERVED75106 Status
63237DDU ALD MEMUBEO07:07GAE07:150:08M,TU,W,TH,F,SA,SUUNRESERVED63237 Status
54103CAR ALD PASSBEO07:13GAE07:210:08M,TU,W,TH,F,SA,SUUNRESERVED54103 Status
55126ALY MUV PASSJGG08:04KWH09:000:56M,TU,W,TH,F,SA,SUUNRESERVED55126 Status
64596ALD DDU MEMUMNF08:33JHG09:260:53M,TU,W,TH,F,SA,SUUNRESERVED64596 Status
11107BUNDELKHAND EXPSAW08:55BOY09:080:13M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11107 Status
21107KURJ BSB LINK EXSAW08:55BOY09:080:13TU,F,SU3A,SL,GN,21107 Status
12582NDLS MUV SF EXPGYN09:23KWH09:480:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12582 Status
53345CPU ALD PASSBEO09:29GAE09:380:09M,TU,W,TH,F,SA,SUUNRESERVED53345 Status
15017GORAKHPUR EXPSAW10:34PRF11:070:33M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15017 Status
11039MAHARASHTRA EXPSAW10:48PRF11:140:26M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11039 Status
14204LKO BSB INTRCITYSAW11:54BOY12:080:14M,TU,W,TH,F,SA,SUCC,GN,14204 Status
14266DDN BSB EXPRESSSAW13:34PRF14:000:26M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14266 Status
55128ALY MUV PASSJGG13:52KWH14:510:59M,TU,W,TH,F,SA,SUUNRESERVED55128 Status
53346ALD CPU PASSMNF15:50JHG17:522:02M,TU,W,TH,F,SA,SUUNRESERVED53346 Status
11071KAMAYANI EXPRESSAW17:30PRF17:530:23M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11071 Status
64595DDU ALD MEMUBEO17:42GAE17:510:09M,TU,W,TH,F,SA,SUUNRESERVED64595 Status
54256LKO BSB PASSSAW18:22PRF18:520:30M,TU,W,TH,F,SA,SUUNRESERVED54256 Status
15118JBP MUV EXPRESSGYN18:40MBS19:220:42SU3A,SL,GN,15118 Status
55130ALY MUV PASSJGG19:23KWH20:481:25M,TU,W,TH,F,SA,SUUNRESERVED55130 Status
75116PRG GCT DEMUSAW19:35PRF20:030:28M,TU,W,TH,F,SUUNRESERVED75116 Status
54104ALD CAR PASSMNF19:36JHG20:381:02M,TU,W,TH,F,SA,SUUNRESERVED54104 Status
63238ALD DDU PASSMNF19:48JHG20:481:00M,TU,W,TH,F,SA,SUUNRESERVED63238 Status
15003CHAURICHAURAEXPHDK22:10KWH23:111:01M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,15003 Status
14370TRIVENI EXPMNF22:23MZP23:100:47M,W,F2A,3A,SL,GN,14370 Status
24370TRIVENI EXPMNF22:26MZP23:100:44TU,TH,SA,SU2A,3A,SL,GN,24370 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.158/2020-21 27-06-2020
Chennai
200 Railway Maintenance Projects of critical importance completed during Covid-19 lockdown period.


This will boost safety and speed of Train operations in key sections of tracks.

The backend warriors of Indian Railways have fully availed the opportunity provided by suspension of passenger services due to pandemic of COVID 19 to successfully executed more than 200 long pending maintenance works including yard remodeling, repair and re-girdering of oldbridges, doubling and electrification of rail lines andrenewal of scissor crossovers. Pending for several years, these unfinished projects often confronted Indian Railways as bottlenecks.

Apart from ensuring supply chains all essential commodities running through parcel trains and freight trains, Indian Railways executed these long pending maintenance works during this lockdown period when passenger services were suspended.

During this period Indian Railways focused o­n several long pending overdue maintenance works which required traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. They were planned during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service.

These works taken up for removal of bottlenecks and enhance safety include 82 rebuilding/rehabilitation of bridge, 48 limited height subway/road under bridge in lieu of level crossing gate, 16 construction/strengthening of foot over bridge, 14 dismantling of old foot over bridge, 7 launching of road over bridge, 5 yard remodelling, 1 commissioning of doubling & electrification and 26 other projects.

Some of these key projects are as follows -

Yard Modification work in Jolarpetti (Chennai Division, Southern Railway) was completed o­n 21stMay 2020.It resulted in easing out of curve and enhancing the speed up to 60Kmph o­n Bengaluru end and facilitated Simultaneous reception and dispatch.

                                   

Likewise dismantling of old abandoned unsafe Foot Over Bridge at Ludhinana (Firozepur Division, Northern Railway) was completed o­n 5th May 2020. Dismantling of this 135 meter long old abandoned FOB structure over 19 tracks and 7 passenger platforms was overdue since 2014 after new FOB was commissioned. 

Work of re-girdering of bridge o­n Tunga River (Mysuru Division, South Western Railway) was completed o­n 3rd May 2020. Dismantling of unsafe deck of Kopar Road ROB near Dombivali (Mumbai Division, Central Railway) was completed o­n 30rdApril 2020 and it resulting in enhanced safety. This deck was declared unsafe for road users in 2019 and covered 6 railway tracks below. 

Two projects of Doubling with Electrification in Varanasi Division, North Eastern Railway were completed o­n 13th June. o­ne of these projects is Kachhwa Road to Madhosingh Section and the second is 16 km of Manduadih to Prayagraj Section. This resulted in decongestion of east - west routes and facilitation of freight movement. The dismantling work of ROB crossing 8 railway tracks in the approach of Chennai Central Station was completed o­n 9th May 2020. This ROB was declared unsafe and was closed for heavy vehicles since July 2016. ROB dismantling could not be done as traffic block requirement was very high resulting into massive cancellation /rescheduling of trains with loss of passenger revenue. 

Works o­n construction of two new bridges in Vijayawada Division of South Central Railway were completed o­n 3rd May. o­n Howrah- Chennai route, the construction of limited height subway for LC elimination in Khurda Road Division in East Coast Railway was completed o­n 9thMay 2020 resulting in increased operational efficiency of trains and Safety. Signalling upgradation work of Azamgarh station (Varanasi Division, North Eastern Railway) was completed o­n 23rd May. Mau - Shahganj section has been upgraded to STD.-II (R), yard speed upgraded from 50 kmph to 110 kmph and simultaneous reception, dispatch and shunting facility provided.

Likewise, renewal of wooden layout Scissors crossover with standard Pre-stress Concrete (PSC) layout in Vijayawada & Kazipet yards (Vijayawada Division, South Central Railway) has been completed. A major block of 72 hrs was taken in Kazipet yard for pending yard remodelling. The old wooden scissors crossover laid in 1970 was replaced with standard PSC layout. Insertion of RCC box at Tilak Nagar station (Mumbai Division, Central Railway) was completed in two mega blocks of 28 hrs and 52 hrs durations o­n 3rd May. This work was taken up to address the problem of flooding in rainy season near Tilak Nagar station o­n harbour line.

The innovative pilot project for powering Trains by solar power, developed over a vacant railway land at Bina is under extensive testing. This 1.7 Mega Watt project to directly feed to 25 kV Railway Overhead Line is a joint venture of Indian Railways and BHEL.

**

PIB COURTESY




(B.Guganesan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit