For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

VASCO DA GAMA

STATION INFO

Address: Vasco da Gama, 403802, India

Station Code: VSG)VASCO DA GAM

Station Name: VSG)VASCO DA GAMA

Zone: SWR/South Western

Total Unique Trains: 25

Train Frequency Weekly: 85

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
17419TPTY VSG EXP06:00Des--TH2A,3A,SL,GN
17316VLNK VSG EXP06:00Des--TU2A,3A,SL,GN
17021HYB VSG EXPRESS06:00Des--TH2A,3A,SL,GN
17309YPR VASCO EXP06:00Des--TU,SU2A,3A,SL,GN
12780GOA EXPRESS06:30Des--M,TU,W,TH,F,SA,SU2A,3A,SL,GN
06948UBL VSG LINK EXP06:30Des--M,TU,W,TH,F,SA,SU3A,SL,GN
56961QLM VSG PASS08:20Des--M,TU,W,TH,F,SA,SUUNRESERVED
12742PNBE VSG EXPRES09:50Des--SA2A,3A,SL,GN
17311MAS VASCO EXP13:00Des--F2A,3A,SL,GN
56963QLM VSG PASS14:05Des--M,TU,W,TH,F,SA,SUUNRESERVED
17603KCG VSG EXP15:05Des--M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
18047AMARAVATHI EXP15:45Des--M,TU,TH,SA2A,3A,SL,GN
56965QLM VSG PASS19:00Des--M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure
56962VSG QLM PASSSrc07:35--M,TU,W,TH,F,SA,SUUNRESERVED
56964VSG QLM PASSSrc13:10--M,TU,W,TH,F,SA,SUUNRESERVED
56966VSG QLM PASSSrc17:30--M,TU,W,TH,F,SA,SUUNRESERVED
18048VSG HOWRAH EXPSrc07:10--TU,TH,F,SU2A,3A,SL,GN
17312VSG CHENNAI EXPSrc14:30--TH2A,3A,SL,GN
17420VSG TPTY EXPSrc09:00--F2A,3A,SL,GN
17310YPR BIWEEKLY EXSrc21:20--M,SA2A,3A,SL,GN
17315VELANKANNI EXPSrc09:00--M2A,3A,SL,GN
17022VSG HYB EXPSrc09:00--F2A,3A,SL,GN
02779VSG SBC LINK EXPSrc15:10--M,TU,W,TH,F,SA,SU3A,SL,GN
12779GOA EXPRESSSourcee15:10--M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12741VSG PATNA EXPSourcee18:00--W2A,3A,SL,GN



RECENT NEWS

1
Press Release No. 19721-08-2020
Hubballi
Press Release No. 197, SHRI ARVIND MALKHEDE, DIVISIONAL RAILWAY MANAGER CONDUCTS PRESS CONFERENCE THROUGH VIDEO LINK

प्रेस विज्ञप्तिPress Release No. 197  Dt: 18.08.2020

SHRI ARVIND MALKHEDE, DIVISIONAL RAILWAY MANAGER CONDUCTS PRESS CONFERENCE THROUGH VIDEO LINK

Shri Arvind Malkhede, Divisional Railway Manager of Hubballi Division conducted a press conference today o­n 18.08.2020 to brief about the various achievements and good works done by the Division during COVID period through video link. Smt. E. Vijaya, Deputy General Manager and Chief Public Relations Officer was also present in the press meet.

Shri Arvind Malkhede said that during the lockdown, though passenger train services were cancelled, goods trains and parcel trains continued to run.  Railway staff like guards, loco pilots, maintenance staff, control staff and others contributed immensely in ensuring uninterrupted supply of essential commodities across the country during lockdown.  Hubballi Division has distributed groceries to coolie porters, daily wage labourers and needy people during lockdown.   It has also distributed more than 76 thousand meals to the needy during lock down.  Hubballi Division has handled  188 rakes of fertilizers equal to 47 lakh quintals and  230 rakes of food grains equal to  57 lakh quintals during this period.

Hubballi Division has run 21 Shramik Specials carrying 30 thousand migrant workers and overall SWR has run 267 Shramik Specials enabling 3.9 lakh migrant people to reach their home.  He said that the Division has manufactured 15,397 face masks and 6090 litres of hand sanitizers for the use of railway staff.   Hubballi Division has converted 35 ICF coaches in to Isolation coaches for COVID patients.  Overall in SWR 320 coaches were converted as Isolation coaches, he said.    o­n a question from the media about utilization of these coaches for COVID patients, he said that the COVID care coaches will be provided upon request from the state government/district administration. o­n a question about resumption of passenger train services, he said that decision in such matter will be taken by the Ministry of Railways in consultation with Ministry of Home Affairs and Ministry of Health. 

Many major works have been completed during COVID period. Remodeling work of Hosapete, a major yard for train operations, has been completed during the COVID period. Yard remodeling has enabled simultaneous reception/dispatch of trains from both directions. This gives flexibility in train operations. Another major work completed by Hubballi Division during COVID period is Kudgi Canal Crossing work of Krishna Bhagya Jal Nigam Ltd. (KBJNL).  This has enabled in irrigating 1.66 Lakh hectares of land and benefitted large number of farmers. Lachyan-Hotgi (33 Km) doubling with 670 m long Bhima Bridge has been completed during the period.  28 Km new line between Gangavati and Karatagi has also been completed.  Hubballi Division has taken up speed enhancement work over the division.  Sectional speed between Majorda and Vasco Da Gama is increased from 75 KMPH to 100 KMPH. Permanent Speed Restrictions have been removed at six locations over Hubballi-Londa section by carrying out upgradation works.  Speed between Ghataprabha and Chikkodi road station has been enhanced to 110 KMPH.

 Doubling works are going o­n in full swing. 16.39 KM doubling between Unkal and Dharwad is expected to be completed by September 2020.   Doubling work is going o­n in various sections.  The doubling work of Gadag to Hole Alur is expected to be completed by January 2021. Doubling between Chikkodi Road-Kudachi is likely to  be completed by December, 2020.  He said that station redevelopment works are being taken up in the Hubballi Division.  Bagalkot, Vijayapura, Dharwad, Belagavi, Hosapete station buildings are being reconstructed.  A new goods shed at Khajjidoni is being developed.  New Goods Shed at Navanagar in Bagalkot, Aliyabad in Vijayapura are also being constructed.  Electrification work between Kariganur-Harlapur is completed. 

He said that Business Development Unit has been set up in the Division to capture additional freight. The BDU has conducted 10 meetings through Video Conference and direct meetings so far. As a result the Division has been able to get new stream of traffic viz., Bauxite, Metallurgical coke, fly ash, pig iron and rice.  o­n the occasion, Shri Arvind Malkhede highlighted about various incentive schemes offered by the Railways for freight customers.   He said that for round trip freight loading, i.e. if a consignor commits to transport ‘A’ class goods in a particular direction, and ‘B’ class goods in the return direction, the consignor will be offered a discount. Similarly, concessions are also being given to short lead traffic, long lead traffic and traffic in traditional empty flow direction. 

 

                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
Press Release No. 14624-06-2020
Hubballi
Press Release No. 146, HUBBALLI DIVISION GETS READY FOR MONSOON

प्रेस विज्ञप्तिPress Release No. 146  Dt: 22.06.2020

HUBBALLI DIVISION GETS READY FOR MONSOON

To ensure proper working of Signal & Telecommunication gears for uninterrupted and safe movement of trains, Hubballi Division has  carried out intensive maintenance and inspections of  S & T installations.   Both Loco pilots and Guards have been provided with Walkie-Talkie sets along with spare battery and all stations of Hubballi Division are equipped with 25 Watt VHF base station.  This enables wireless communication between the train crew and station master especially during monsoon season. 

Emergency Communication Sockets have been provided at every 1 KM along the track which enables the patrolmen, watchmen, loco pilots, guards and other field maintenance staff to contact station master and control office during breaches, track washouts and any other emergencies.  Accident Relief Trains (ART) are available at five locations over Hubballi Division i.e., at Hubballi, Castle Rock, Hosapete, Vijayapura and Vasco Da Gama and vital communication equipment including satellite phones are available in all ARTs for emergency communication like during rain and floods.

All signal aspects have been provided with integrated type LED aspect for better visibility of signals during rain.  Proper earthing & lightning protections are provided to ensure round the clock working of S & T gears and reduce impact of lightning.  During monsoon, power supply failure is more in rural areas.  Therefore Integrated Power Supply system has been installed and its proper working is ensured for uninterrupted/reliable working of signaling installations.  All Signal & Telecommunication cables have been tested thoroughly at stations/block sections.  


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search