For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








27 Trains from (MJ)MARWAR JN to (AII)AJMER JN


Address: Marwar Junction, Rajasthan 306001, India

Station Code: MJ

Station Name: MARWAR JN

Zone: NWR/North Western

Train Frequency Weekly: 253

Station Traffic: High

Address: Ajmer Junction, Ajmer, Rajasthan 305001, India

Station Code: AII

Station Name: AJMER JN

Zone: NWR/North Western

Train Frequency Weekly: 425

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19415ADI SVDK EXPRESSMJ01:35AII04:152:40SU2A,3A,SL,GN,19415 Status
22451CDG SUP FASTMJ02:40AII04:452:05M,TH2A,3A,SL,GN,22451 Status
14312ALA HAZRAT EXPMJ03:02AII06:053:03M,TU,TH2A,3A,SL,GN,14312 Status
14322BAREILLY EXPRESSMJ03:02AII06:053:03W,F,SA,SU2A,3A,SL,GN,14322 Status
19407ADI VARANASI EXPMJ03:25AII06:202:55TH2A,3A,SL,GN,19407 Status
59601MJ AII PASSDRS05:20AII09:003:40M,TU,W,TH,F,SA,SUUNRESERVED59601 Status
12989AJMER EXPRESSMJ05:32AII08:152:43M,TH,SA2A,3A,SL,GN,12989 Status
19263DELHI SR EXPRESSMJ07:43AII10:553:12TU,SA2A,3A,SL,GN,19263 Status
19269PBR MOTIHARI EXPMJ07:43AII10:553:12TH,F2A,3A,SL,GN,19269 Status
14801JU INDB EXPRKZ09:10AII12:353:25M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN,14801 Status
15013RANIKHET EXPMJ09:20AII12:002:40M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN,15013 Status
19573JAIPUR EXPRESSMJ10:15AII12:502:35M2A,3A,SL,GN,19573 Status
54805JAIPUR PASSENGERBFY12:24AII17:054:41M,TU,W,TH,F,SA,SUSL,GN,54805 Status
19707AMRAPUR ARAVALIMJ12:40AII16:253:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19707 Status
19403SULTANPUR EXPMJ13:00AII15:502:50TU2A,3A,SL,GN,19403 Status
19413KOLKATA EXPRESSMJ13:00AII15:502:50W2A,3A,SL,GN,19413 Status
16532GARIB NAWAZ EXPMJ14:32AII17:302:58F2A,3A,SL,GN,16532 Status
16210AJMER EXPRESSMJ14:32AII17:302:58TU,TH2A,3A,SL,GN,16210 Status
19411AJMER INTERCITYMJ16:00AII18:452:45M,TU,W,TH,F,SA,SUCC,2S,GN,19411 Status
19031HARIDWAR MAILMJ17:37AII20:403:03M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19031 Status
19401ADI LUCKNOW EXPMJ18:30AII21:152:45M2A,3A,SL,GN,19401 Status
18421PURI AJMER EXPMJ18:30AII21:102:40M,TH2A,3A,SL,GN,18421 Status
59272BVC DEE LINK EXMJ22:57AII01:302:33M,TU,W,TH,F,SA,SU3A,SL,GN,59272 Status
19579RJT DEE EXPRESSMJ23:10AII01:302:20TH2A,3A,SL,GN,19579 Status
15270JANSADHARAN EXPMJ23:12AII01:322:20SUUNRESERVED15270 Status
22548ADI GWL SF EXPMJ23:35AII02:002:25TU,F,SA2A,3A,SL,GN,22548 Status
12548ADI AGC SF EXPMJ23:35AII02:002:25M,W,TH,SU2A,3A,SL,GN,12548 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
WR Press Release No.2023/0608-06-2023
Mumbai
WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN ON SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR

WESTERN RAILWAY TO RUN SUMMER SPECIAL TRAIN o­n SPECIAL FARE BETWEEN UDHNA - BHAGAT KI KOTHI & BANDRA TERMINUS - GORAKHPUR

For the convenience of passengers and with a view to meet the travel demand, Western Railway has decided to run summer special train o­n Special fare between Udhna - Bhagat Ki Kothi and between Bandra Terminus - Gorakhpur.

According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of the train are as under:

1.Train No. 04814/04813 Udhna – Bhagat Ki Kothi Superfast Special [8 TRIPS]

Train No. 04814 Udhna – Bhagat Ki Kothi Special will depart from Udhna every Sunday at 05.50 hrs. & will reach Bhagat Ki Kothi at 18.00 hrs. the same day. This train will run from 11th June, 2023 to 02nd July, 2023. Similarly, Train No. 04813 Bhagat Ki Kothi – Udhna Superfast Special will depart from Bhagat Ki Kothi every Saturday at 16.00 hrs. & will reach Udhna at 04.00 hrs. the next day. This train will run from 10th June, 2023 to 01st July, 2023.

Enroute this train will halt at Bharuch, Vadodara, Anand, Ahmedabad, Sabarmati, Mahesana, Palanpur, Abu Road, Falna, Marwar, Pali Marwar and Luni stations in both directions. This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second-Class Coaches.

2.Train No. 05054/05053 Bandra Terminus - Gorakhpur Special [2 Trips]

Train No. 05054 Bandra Terminus – Gorakhpur Special will depart from Bandra Terminus o­n Saturday, 10th June, 2023 at 22.45 and reach Gorakhpur at 06.25 hrs o­n Monday. Similarly, Train No. 05053 will depart from Gorakhpur o­n Friday, 9th June, 2023 at 09.30 hrs and arrive Bandra Terminus at 16.00 hrs, the next day. 

 Enroute this train will halt at Borivali, Vapi, Surat, Vadodara, Ratlam, Kota, Gangapur City, Agra fort, Tundla, Kanpur Central, Aishbag, Badshah Nagar, Gonda, Basti and  Khalilabad stations in both directions.

This train comprises General Second Class coaches.

The booking for Train No. 04814 will open from 09.06.2023 at all PRS Counters and o­n IRCTC website. The above trains will run as special train o­n special fare. For detailed information regarding timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in.

*********





2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit