24 Trains from (GGN)GURGAON to (AII)AJMER JN
Address: 122006, India
Station Code: GGN
Station Name: GURGAON
Zone: NR/Northern
Train Frequency Weekly: 401
Station Traffic: High
Address: Ajmer Junction, Ajmer, Rajasthan 305001, India
Station Code: AII
Station Name: AJMER JN
Zone: NWR/North Western
Train Frequency Weekly: 425
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.sr.indianrailways.gov.in- 2023-05-25
Southern Railway has taken up Katpadi Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment in September 2022 and the redevelopment work is progressing at a steady pace. Works executed recently ·Architectural & structural drawing of Phase-I & Phase II buildings. ·Environment monitoring survey completed. ·GRIHA rating for Katpadi station Redevelopment work. ·Project Management Site Office construction completed. ·Staff quarters footing work completed. Other works in progress ·Site laboratory & mess construction work in progress. ·Setting up of a Batching plant in progress. ·Architectural & structural Design of the Station Buildings, Multi-level Car Parking, Multi-level Two-wheeler Parking, Foot-Over-Bridge, Air-Concourse & other buildings in progress. ·Staff quarters foundation backfilling in progress. ·Site cleaning & Marking for Scout, Artesian, RPF barrack in progress. Works executed So far ·Master Plan Validation completed. ·Traffic Survey work completed. ·Utility Scanning completed. ·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets. ·All kind of Soil test (Geotechnical investigation) completed at various locations. ·Project management Services have commenced work. ·Site clearance work completed for building locations for Phase-I & Phase II. ·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of Phase-I building for Staff quarters (Type-II - 16 units, 2 blocks), Barrack and Scout, P- way and Signal Warehouse, SSE Tele/Signal yard space, Gang tool cum Restroom Artisans room, Parcel/RMS office and Elevated trolley path, MLCP/MLTP and PWAY shed, Sump, STP , Solid waste management System including incinerator, External Service, Departure Air Concourse & Departure terminal building. ·On a regular basis project review meetings are held with the stakeholders of the project. ·Fabrication of Sign boards & barricades completed. Katpadi (KPD) Station Redevelopment works The work of redevelopment of Katpadi Railway station was awarded as EPC contract to M/s Engineering Projects (India) Ltd, Chennai at a cost of Rs. 329.32 Crore, setting a time frame of 36 months from D Date, i.e. from 01-12-2022, for completion of the project. M/sVoyants Solutions Pvt Ltd, Gurgaon have been tasked with the work of Project Management services (PMS) at a cost of Rs.7.89 Crore. Two terminals (Arrival & Departure) are proposed to be constructed in the southern side, connected by Air concourses while arrival & departure lobby will be constructed in the Northern side. The Terminal Buildings will be equipped with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Elevated skywalks and subways with adequate lifts/escalators will connect both of these terminals to the bus stand thus enabling hassle-free inter-modal connectivity. A dedicated space for handling parcels will also be constructed.
Follow us (B.Guganesan) Chief Public Relations Officer 2
www.cr.indianrailways.gov.in- 2023-05-23
General Manager reviews monsoon preparations Central Railway gears up with monsoon preparations Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling were also present. The details of measures taken for ensuring uninterrupted services are as under- 1)More Water Pumps- 24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP. The locations identified on main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and on Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc. 2)Micro tunnelling- Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section. 3)Desilting of drains- Central Railway has targeted de-silting and cleaning of 118.48 kms of drains on its suburban section of which, work has been completed for 102.39 kms and work is presently in progress on cleaning of another 16 kms of drains. 4)Cleaning of culverts- CR has cleaned 88 culverts on its suburban sections, and work is presently in progress on cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar. 5)Trimming of Trees- Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees. 6)Muck removal- Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck on Main lines. 7)Lifting of tracks- 47.8 km track lifting planned, it will be completed till next month. 8) Works done in Ghat Section- -45 meters of Tunnel Portal -300 mts of Rockfall Barrier -500 sq mts of Boulder Netting -40 mts of Canadian Fencing -160 mts of Stabilization of banks -tunnel sounding- 18 locations 9)Separate pumps will be provided for RUBs- at 14 locations. 10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve. 11)Other Important works in progress- ·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week. ·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections. ·Waterproof point motor machines provided at- 277 locations. ·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month. ·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas. ·Bunter Bhavan nallah at LTT to be connected by removing encroachments. ·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders. ·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti. 12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed. 13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates. 14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period. 15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC. --- --- --- Date: May 23, 2023 PR No. 2023/05/23 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivraj Manaspure) Chief Public Relations Officer |