For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








11 Trains from (BZM)BHIMSEN to (SV)SIWAN JN


Address: Bhimsen Railway Station, Bhimsen, Uttar Pradesh 208020, India

Station Code: BZM

Station Name: BHIMSEN

Zone: NCR/North Central

Train Frequency Weekly: 113

Station Traffic: Medium

Address: Siwan, Bihar, India

Station Code: SV

Station Name: SIWAN JN

Zone: NER/North Eastern

Train Frequency Weekly: 377

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12554VAISHALI EXPCNB02:25SV11:008:35M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12554 Status
22532MTJ CPR SF EXPCNB06:00SV14:508:50M,W,F3A,SL,GN,22532 Status
12522RAPTISAGAR EXPCNB08:20SV17:158:55F2A,3A,SL,GN,12522 Status
19709KAVI GURU EXPCNB12:10SV23:0510:55M2A,3A,SL,GN,19709 Status
15270JANSADHARAN EXPCNB13:50SV23:059:15SUUNRESERVED15270 Status
15102JANSADHARAN EXPCNB17:20SV03:009:40FUNRESERVED15102 Status
11124GWL BJU MAILCNB18:35SV05:1510:40M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11124 Status
12566BIHAR S KRANTICNB20:15SV04:308:15M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12566 Status
22412ARUNACHAL EXPCNB20:45SV05:008:15TH,SU1A,2A,3A,22412 Status
15708ASR KIR EXPRESSCNB23:00SV07:508:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15708 Status
14006LICHCHAVI EXPCNB23:35SV11:2011:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14006 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
29-04-2023
Running of Delhi. – Barauni –Delhi Summer Special Train

NEW DELHI

DATE 28.04.2023

 

Running ofDelhi. – Barauni –Delhi Summer Special Train

 

It is notified for the information of the general public that for the convenience of the rail passengers and to clear extra rush, Railways have decided to run 04062/04061 Delhi - Barauni -Delhi Reserved SummerSpecial Express train as per details mentioned below: -

 

●04062/04061 Delhi - Barauni -Delhi Reserved Special Express(2 Trips)

04062 Delhi - Barauni Reserved Special Express o­n 30.04.2023

Station

04061 Barauni -Delhi Reserved Special Expresson 01.05.2023

Arrival

Departure

Arrival

Departure

--

0805

Delhi

0550

--

1007

1009

Aligarh Jn

0200

0205

1125

1127

TundlaJn

0040

0045

1235

1237

Etawah

2330

2335

1520

1525

Kanpur Central

2150

2155

1740

1750

Lucknow

2005

2015

2030

2035

Gonda

1750

1755

2150

2155

Basti

1620

1625

2300

2310

Gorakhpur

1510

1515

0055

0100

Siwan

1235

1240

0220

0225

Chhapra

1140

1145

0340

0345

Hajipur

1000

1005

0630

--

Barauni

--

0830

Composition:-AC, Sleeper and General Class Coaches.

 

Note – Due to operational reasons, running of 04074/04074 Patna- Ananad Vihar T.- Patna SuperfastA.C. Express special trainfrom 02.05.2023 to 04.07.2023 has been cancelled.

--------





2
24-03-2023
Press Release:DFC – THE GAME CHANGER IN INDIAN LOGISTICS OPERATION


Kolkata, March 24, 2023 :

Shri N. Srinivas, IRTS Officer (1989) in a presentation at Eastern Railway headquarters conveyed several benefits of Dedicated Freight Corridor. DFC will be a game changer in transport logistics of the country with the multi-dimensional benefits derived from it like –
•Energy efficient and environment friendly transport which will save 457 Million Tonnes of Co2 emission over 30 years.
•Quantum jump in transportation capacity and faster transit to & from major ports and industrial hubs.
•Released capacity o­n IR is available for augmentation and speeding up passenger services.

In Eastern Dedicated Freight Corridor (EDFC), four sections namely Khurja – Bhaupur (351 km), Bhimsen – Chunar (327 km), Pt Deen Dayal Upadhyay Jn – Sonnagar (137) & Khurja – Dadri (46 km) – a total of 861 km have been commissioned so far. 
There has been a great impact of DFC as loading organizations like CONCOR and other big cement houses are expected to execute more loading. Initiatives like installation of Solar Photovoltaic Panels o­n vacant land pockets along DFC tracks and others are being taken.

The business development plan through DFC envisages many other strategies like Development of small cargo business and attracting unconventional freight traffic including modal shift from road to rail through innovative products using RO-RO/ToT model. Besides, DFC has advantages of unused line capacity, high speed and lower operating cost. 

The USP of DFC for increasing the freight business are capacity, speed & quality of service. IT packaging, first mile/last mile service, aggregation of e-commerce firms, business generation by incentives and encouraging local merchants for aggregating local produce for rail dispatches from nearby DFCCIL stations are aimed to bring revenue even from non-conventional streams. Besides, non-fare revenues from advertisement rights at Flyovers, RoBs, RuBs, station buildings/structures and Dark Fibre Monetisation have come into existence. There has been renewable energy development in the Land bank & building roofs also. 

Besides, the DFC is also using Dedicated Freight Information System (DFIS) which is an in-house developed information system. This application has several models and key performance indicators over WDFC and EDFC monitored through DFIS. The DFIS have the facilities for Live train running details, Digital daily MIS reports, Paperless station management, unusual incidents reporting and impact analysis, Digitalization of important Forms & Authorities, Cadre Management (PME and training details), Business Development Data, analysis and planning & Details of private sidings, Business Development Reports, Loading/Unloading reports and analysis & other important links and works.

DFIS can access actual Freight train running from COA application of IR (through API) and o­n basis of algorithm embedded in DFIS the Paths of freight train shall be predicted. o­n basis of expected arrival time at Crew changing point, crew arrangement shall be triggered by DFIS in CMS. Similarly unusual related with railway assets such as loco, wagon, crew etc shall be pushed into ICMS for proper monitoring of asset performance.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit