For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

BHIMSEN

STATION INFO

Address: Bhimsen Railway Station, Bhimsen, Uttar Pradesh 208020, India

Station Code: BZM)BHIMSE

Station Name: BZM)BHIMSEN

Zone: NCR/North Central

Total Unique Trains: 21

Train Frequency Weekly: 113

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
19166SABARMATI EXP01:3501:372M,W,SA2A,3A,SL,GN
19168SABARMATI EXP01:3701:392TU,TH,F,SU2A,3A,SL,GN
11016KUSHINAGAR EXP02:5302:552M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51802CNB MKP PASS06:3906:412M,TU,W,TH,F,SA,SUUNRESERVED
15206CHITRAKUT EXP07:0307:052M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51804CNB JHS PASS07:3507:372M,TU,W,TH,F,SA,SUUNRESERVED
51813JHS LKO PASS08:3008:322M,TU,W,TH,F,SA,SUUNRESERVED
54161KURJ CNB PASS10:0910:112M,TU,W,TH,F,SA,SUUNRESERVED
14110CHITRAKOOT EXP11:4211:442M,TU,W,TH,F,SA,SUUNRESERVED
51803JHS CNB PASS13:1813:202M,TU,W,TH,F,SA,SUUNRESERVED
11123BJU GWL MAIL14:1614:182M,TU,W,TH,F,SA,SU2A,3A,SL,GN
54162CNB KURJ PASS16:5116:532M,TU,W,TH,F,SA,SUUNRESERVED
11124GWL BJU MAIL17:3817:402M,TU,W,TH,F,SA,SU2A,3A,SL,GN
14109CNB EXPRESS19:1819:202M,TU,W,TH,F,SA,SUUNRESERVED
51814LKO JHS PASS19:3019:322M,TU,W,TH,F,SA,SUUNRESERVED
15205CHITRAKUT EXP19:5019:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51801MKP CNB PASS22:1022:122M,TU,W,TH,F,SA,SUUNRESERVED
19167SABARMATI EXP22:1822:202M,TU,TH,SA2A,3A,SL,GN
19165SABARMATI EXP22:1822:202W,F,SU2A,3A,SL,GN
11015KUSHINAGAR EXP23:2123:232M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59386PANCHVALLEY PA23:3623:371M,TU,W,TH,F,SA,SUFC,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          





2
Press Release No. 36702-02-2021
Hubballi
Press Release No. 367, GM/SWR CONDUCTS ANNUAL INSPECTION ON HOTGI-GADAG SECTION

दक्षिण पश्चिम रेलवे/ SOUTH WESTERN RAILWAY

        प्रेस विज्ञप्ति/ Press Release No. 367  Dt: 29.01.2021                     

GM/SWR CONDUCTS ANNUAL INSPECTION o­n HOTGI-GADAG SECTION


Every year, GM’s Annual Inspection will be conducted to check the operational safety of the section. Shri Ajay Kumar Singh, General Manager of South Western Railway along with Principal Heads of Departments and Hubballi Divisional Railway Manager conducted Annual Inspection of Hotgi-Gadag Section today i.e., o­n 29.01.2021.  He conducted window trailing inspection  startingfrom Hotgiby Special train. 

He inspected  Bhima Bridge, the longest bridge of South Western Railway and checked various safety parameters.  He inspected Indi Road Railway station, points & crossings at the station and inaugurated Selfie Point, Garden and Pay & Use Toilets  at the station premises. 

 He inspected Curve between Indi Road &Nimbal and interacted with  Gang No. 1 & 2 and enquired about their grievances. Railway is shifting towards digitalization and has introduced Human Resource Management System, a single-window communication system between Railway Administration and employees. Through HRMS application, now railway employees can apply for pass o­nline, apply for withdrawal of PF o­nline etc. o­n this occasion, a User Guide to HRMS was released by GM and distributed to Gangmen present there. 

At Vijayapura, he inspected the station, o­n-going station redevelopment work, ART and also inaugurated the SantKabir Park, renovated Running Room,  and commissioned Hydraulic Rescue Device equipment.   He also inaugurated -open  Gym at RPF Barrack. He inspected Level Crossing Gate No. 62 between BasavanaBagevadi Road and Wandal. At Almatti station, he inspected Gang cum Rest Room and inaugurated Children Park, newly constructed railway quarters and SardarVallabhBhai Patel Garden. He inspected newly constructed RPF Barrack and open Gym at Bagalkot.  A speed trial was conducted between Bagalkot and Hole Alur as part of the inspection.

At Gadag station, he inaugurated the Garden and unveiled the statue of PanditBhimSen Joshi.  He also inaugurated the PanditPuttarajGawai Library and inspected the renovated Railway Health Unit.  

On the occasion at Hubballi station premises, Sur Sangam Garden was inaugurated by Smt. Sujata Singh, President of SWRWWO.   Shri Ajay Kumar Singh expressed his satisfaction over the safety parameters and congratulated the officers and staff for upkeeping the railway assets properly and safely.  He also distributed cash awards to employees who have performed outstandingly.

ShriDevanandChanvan, Hon’ble MLA of Nagthan submitted a representation at Minchnal and public submitted memorandum at Hole Alurto GM regarding railway related issues.

ShriVipul Kumar, Principal Chief Engineer; Shri K.C. Swami, Chief Administrative Officer, Construction; ShriArvindMalkhede, Hubballi Divisional Railway Manager; Shri P. Ravikumar, Principal Mechanical Engineer Principal;Shri Sanjay Agarwal, PCEE; Shri H S Verma, PCOM;  ShriAlok Kumar, PCPO; Shri P V Raja Sekhar, PCSTE;Shri G. V. Narayana Murthy, PCMM; Ms.RoopaSrinivasan, PFA;  Shri Anil Pavithran, PCCM;  Shri R S Chauhan, PCSC;  Shri M. A. V. Ramanujan PCSO; Dr. Vilas Gunda PCMD accompanied Shri A. K. Singh, GM/SWR. 


                                                                   Chief Public Relations Officer                                                                    South Western Railway, Hubballi








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search