For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

BHIMSEN

STATION INFO

Address: Bhimsen Railway Station, Bhimsen, Uttar Pradesh 208020, India

Station Code: BZM)BHIMSE

Station Name: BZM)BHIMSEN

Zone: NCR/North Central

Total Unique Trains: 21

Train Frequency Weekly: 113

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
19166SABARMATI EXP01:3501:372M,W,SA2A,3A,SL,GN
19168SABARMATI EXP01:3701:392TU,TH,F,SU2A,3A,SL,GN
11016KUSHINAGAR EXP02:5302:552M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51802CNB MKP PASS06:3906:412M,TU,W,TH,F,SA,SUUNRESERVED
15206CHITRAKUT EXP07:0307:052M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51804CNB JHS PASS07:3507:372M,TU,W,TH,F,SA,SUUNRESERVED
51813JHS LKO PASS08:3008:322M,TU,W,TH,F,SA,SUUNRESERVED
54161KURJ CNB PASS10:0910:112M,TU,W,TH,F,SA,SUUNRESERVED
14110CHITRAKOOT EXP11:4211:442M,TU,W,TH,F,SA,SUUNRESERVED
51803JHS CNB PASS13:1813:202M,TU,W,TH,F,SA,SUUNRESERVED
11123BJU GWL MAIL14:1614:182M,TU,W,TH,F,SA,SU2A,3A,SL,GN
54162CNB KURJ PASS16:5116:532M,TU,W,TH,F,SA,SUUNRESERVED
11124GWL BJU MAIL17:3817:402M,TU,W,TH,F,SA,SU2A,3A,SL,GN
14109CNB EXPRESS19:1819:202M,TU,W,TH,F,SA,SUUNRESERVED
51814LKO JHS PASS19:3019:322M,TU,W,TH,F,SA,SUUNRESERVED
15205CHITRAKUT EXP19:5019:522M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51801MKP CNB PASS22:1022:122M,TU,W,TH,F,SA,SUUNRESERVED
19167SABARMATI EXP22:1822:202M,TU,TH,SA2A,3A,SL,GN
19165SABARMATI EXP22:1822:202W,F,SU2A,3A,SL,GN
11015KUSHINAGAR EXP23:2123:232M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59386PANCHVALLEY PA23:3623:371M,TU,W,TH,F,SA,SUFC,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
12-08-2021
Shri Ashutosh joins as DRM, Jhansi

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे

प्रयागराज

पत्रांक:11पीआर/08/2021              प्रेसविज्ञप्ति                दिनांक: 10.08.2021

Shri Ashutosh joins as DRM, Jhansi

On 10.08.2021, Shri Ashutosh, an officer of the Indian Railway Engineering Service has, assumed the charge of DRM, Jhansi (NCR). Shri Ashutosh has worked as Chief Engineer (Construction) and Principle Chief Engineer, Railway Electrification in Prayagraj.

 

Shri Ashutosh is an alumni of IIT/Kanpur from where he did his BTech in 1989. Shri Ashutosh has worked as Senior Divisional Engineer/Coordination in Agra Division and as ADRM in Ahmedabad Division of Western Railway. Mr. Ashutosh is well acquainted with Jhansi Division. He has worked here as Deputy Chief Engineer/Bridge from 2009 to 2011. During this period he undertook various projects like construction of Foot Over Bridges (FOBs) at stations like Madraha, Bhind, Chitrakoot etc. Apart from this, Pedestrian Pathway o­n the bridges of Sindh and Chambal situated o­n Jhansi-Agra section and inspection pathway o­n two bridges of Yamuna o­n Jhansi-Kanpur, Khairar Bhimsen sections were also constructed during his tenure.

Shri Ashutosh, while working as Chief Engineer (Construction), executed the works of Jhansi-Bina third line, Gwalior Sheopur Kalan gauge conversion (gauge conversion) and Jhansi Manikpur line doubling. Apart from this, yard remodelling and Goods Shed in Rayaru, Road Over Bridges (ROB) at Gwalior, Datia, Sipri etc., renovation of Chirula station and construction of many Road Over Bridges (RUBs) has also been credited to his name.

During the tenure of Mr. Ashutosh's Senior Divisional Engineer/Coordination Agra, Palwal-Bhuteshwar third line, stretchy bridge regirdring in Agra, Agra Cantt yard remodeling, Tundla flyover and road bridges were constructed at many places. New records were set up in rail renewal by PQRS method o­n Agra-Mathura section. He got appreciation by Member Engineering, Railway Board for significant improvement in track maintenance and significant increase in Track Geometry Index (TGI).

During the tenure of Shri Ashutosh as ADRM in Ahmadabad Division of Western Railway, new line, doubling, gauge conversions by various executive agencies like Western DFC, RVNL, Western Railway/Construction, Metro Rail (MEGA), Rail Electrification, RITES, IRSDC gauge conversion, rail electrification, metro rail and Gandhinagar station redevelopment works were executed. Shri Ashutosh established better coordination with all the above executive agencies so that unprecedented progress could be made in the works of rail infrastructure.

Shri Ashutosh, during his tenure as Chief Engineer/Construction, got the infrastructure works done in Prayagraj Mahakumbh 2019 like 4 huge passenger sheds in the station premises, Skywalk to connect FOB, Multi-storey building and many road overhead bridges in a time bound manner so that Mahakumbh was organized successfully. Shri Ashutosh also has experience in concrete sleeper production and overhauling of track machines. Shri Ashutosh has been awarded by the Railway Minister Rajbhasha Puraskar in 2017.

Byjoining of Shri Ashutosh as DRM Jhansi, it ios expected that infrastructure works will be expedited.

GM/NCR Shri Pramod Kumar congratulated Shri Ashutosh for the prestigious assignment and extended his best wishes for him.

 

 





2
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search