For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

KALPI

STATION INFO

Address: Kalpi, Uttar Pradesh, India

Station Code: KPI)KALP

Station Name: KPI)KALPI

Zone: NCR/North Central

Total Unique Trains: 17

Train Frequency Weekly: 79

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
19166SABARMATI EXP02:3602:382M,W,SA2A,3A,SL,GN
19168SABARMATI EXP02:3602:382TU,TH,F,SU2A,3A,SL,GN
11016KUSHINAGAR EXP03:4403:462M,TU,W,TH,F,SA,SU2A,3A,SL,GN
11105PRATHAM S S EXP05:1605:171SU3A,SL,GN
51813JHS LKO PASS05:3305:352M,TU,W,TH,F,SA,SUUNRESERVED
11109JHS LJN INT EXP08:2308:241M,TU,W,TH,F,SA,SUCC,2S,GN
51804CNB JHS PASS09:1909:201M,TU,W,TH,F,SA,SUUNRESERVED
51803JHS CNB PASS11:4911:501M,TU,W,TH,F,SA,SUUNRESERVED
11123BJU GWL MAIL15:2915:312M,TU,W,TH,F,SA,SU2A,3A,SL,GN
11124GWL BJU MAIL16:0816:102M,TU,W,TH,F,SA,SU2A,3A,SL,GN
11110LJN JHS INT EXP19:5119:521M,TU,W,TH,F,SA,SUCC,2S,GN
19165SABARMATI EXP19:5820:002W,F,SU2A,3A,SL,GN
19167SABARMATI EXP19:5820:002M,TU,TH,SA2A,3A,SL,GN
51814LKO JHS PASS20:5320:552M,TU,W,TH,F,SA,SUUNRESERVED
11015KUSHINAGAR EXP21:1621:182M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59386PANCHVALLEY PA21:3121:332M,TU,W,TH,F,SA,SUFC,3A,SL,GN
11106PRATHAM S SNGRM23:1023:122F3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
22-07-2021
PRESS RELEASE: INTRODUCTION OF SUPERFAST SPECIAL TRAIN BETWEEN KOLKATA & JHANSI

  

INTRODUCTION OF SUPERFAST SPECIAL TRAIN BETWEEN KOLKATA & JHANSI

 

Kolkata, July 21, 2021:

 

For the sake of convenience of commuters, o­ne superfast fully reserved special train will run between Kolkata & Jhansi.

             01106 Jhansi – Kolkata Superfast Special will leave Jhansi at 21.20 hrs. o­n every Friday w.e.f. 30.7.2021 till further advice to reach Kolkata station at 21.05 hrs. o­n the next day. 01105 Kolkata – Jhansi Superfast Special will leave Kolkata station at 7.25 hrs. o­n every Sunday w.e.f. 1.8.2021 till further advice to reach Jhansi at 7.20 hrs. o­n the next day.

             The special train will stop at Orai, Kalpi, Pokhrayan, Govindpuri, Prayagraj Jn., Pt. Deen Dayal Upadhyay Jn., Buxar, Ara, Patna Jn., Kiul Jn., Jhajha, Jasidih Jn., Madhupur Jn., Chittaranjan, Asansol, Barddhaman & Naihati stations enroute in both directions.

             The date of commencement of booking of tickets for the above special train will be notified shortly.

 

 

 






2
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          








COMMENTS

1
22-07-2021
PRESS RELEASE: INTRODUCTION OF SUPERFAST SPECIAL TRAIN BETWEEN KOLKATA & JHANSI

  

INTRODUCTION OF SUPERFAST SPECIAL TRAIN BETWEEN KOLKATA & JHANSI

 

Kolkata, July 21, 2021:

 

For the sake of convenience of commuters, o­ne superfast fully reserved special train will run between Kolkata & Jhansi.

             01106 Jhansi – Kolkata Superfast Special will leave Jhansi at 21.20 hrs. o­n every Friday w.e.f. 30.7.2021 till further advice to reach Kolkata station at 21.05 hrs. o­n the next day. 01105 Kolkata – Jhansi Superfast Special will leave Kolkata station at 7.25 hrs. o­n every Sunday w.e.f. 1.8.2021 till further advice to reach Jhansi at 7.20 hrs. o­n the next day.

             The special train will stop at Orai, Kalpi, Pokhrayan, Govindpuri, Prayagraj Jn., Pt. Deen Dayal Upadhyay Jn., Buxar, Ara, Patna Jn., Kiul Jn., Jhajha, Jasidih Jn., Madhupur Jn., Chittaranjan, Asansol, Barddhaman & Naihati stations enroute in both directions.

             The date of commencement of booking of tickets for the above special train will be notified shortly.

 

 

 






2
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          





1
Sou129vik- Thu Jan 11 15:10 2018
Hiii


Add Comment






Submit


Latest Search