15 Trains from (SKTN)SHAKTI NAGAR to (RBGJ)ROBERTS GANJ
Address: Shakti Nagar, Madhya Pradesh, India
Station Code: SKTN
Station Name: SHAKTI NAGAR
Zone: ECR/East Central
Train Frequency Weekly: 37
Station Traffic: Low
Address: Tagore Nagar Road, Robertsganj, Uttar Pradesh 231216, India
Station Code: RBGJ
Station Name: ROBERTS GANJ
Zone: NCR/North Central
Train Frequency Weekly: 1
Station Traffic: Low
Trains
|
||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.ncr.indianrailways.gov.in- 2022-09-05
Giving a boost to the freight mobility and aiming to expedite the movement of coal rakes, NCR formed a long haul of 4 empty BOXN rakes from Chunar last evening. Named as PINAKA, the long haul consisted of a total of 232 wagons (58 wagons per part) and 4 brake vans. It was formed at Chunar by clubbing four empty BOXN rakes with the leading part having WAG9 multiple-unit locomotive while the rest three parts had their own locomotives. Usually, the long haul trains are run by clubbing 2 trains. However, in view of expediting the freight movement, especially coal, long hauls of 3 or more trains have been formed on a trial basis. In the month of August, 36 long hauls of 2 trains and 4 Triagni (तà¥à¤°à¤¿à¤…गà¥à¤¨à¤¿ - a long haul of 3 empty BOXN rakes) were formed by Prayagraj Division at Chunar. These long hauls of empty BOXN rakes are handed over to ECR for loading at various coal loading sites. The main aim of these long haul trains is increasing the line capacity. Since Chunar-Chopan section is a single line section at present and it also serves as the trunk route for coal movement as maximum coal loading is taking place in Northern Coal Fields (NCL), the idea of running long haul trains has been executed to increase the mobility of coal rakes without affecting the punctuality of coaching trains. Pinaka departed from Chunar at 18:20 hrs on Saturday and was handed over to East Central Railway at Chopan. Two BOXN were placed at Shakti Nagar Siding and two others were placed at Krishanshilla siding. Long hauls of 2 trains have traditionally been made in NCR from locations like Tundla, Khurja, Jhansi and BAAD (near Mathura). These trials will be continue regularly. 2
www.wr.indianrailways.gov.in- 2022-02-22
CANCELLATION OF FEW TRAINS DUE TO NON-INTERLOCKING WORK IN BILASPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY Due to non-interlocking work for commissioning of 4th line connectivity at Kharsia station in Jharradih – Kharsia – Robertson triple line electrified section of Bilaspur Division of South East Central Railway, few trains will remain cancelled. According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of the trains are as under: Cancellation of Trains: 1. Train No. 22909 Valsad – Puri Superfast Express of 24th February, 2022. 2. Train No. 22910 Puri – Valsad Superfast Express of 27th February, 2022. 3. Train No. 20918 Puri – Indore Humsafar Express of 24th February, 2022. ************
COMMENTS
NO Comments. Be the first to Comment...
|