For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








15 Trains from (SKTN)SHAKTI NAGAR to (RBGJ)ROBERTS GANJ


Address: Shakti Nagar, Madhya Pradesh, India

Station Code: SKTN

Station Name: SHAKTI NAGAR

Zone: ECR/East Central

Train Frequency Weekly: 37

Station Traffic: Low

Address: Tagore Nagar Road, Robertsganj, Uttar Pradesh 231216, India

Station Code: RBGJ

Station Name: ROBERTS GANJ

Zone: NCR/North Central

Train Frequency Weekly: 1

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
51675KTE CPU PASSMHDA03:51CPU08:204:29M,TU,W,TH,F,SA,SUUNRESERVED51675 Status
23346SKTN BSB INTERSKTN05:00CPU06:551:55M,TU,W,TH,F,SA,SUUNRESERVED23346 Status
13346BSB INTERCITY EXPSGRL05:45SBDR08:332:48M,TU,W,TH,F,SA,SUUNRESERVED13346 Status
14370TRIVENI EXPKRLR07:36CPU05:352:01M,W,F2A,3A,SL,GN,14370 Status
11447SHAKTIPUNJ EXPSGRL07:48CPU09:151:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11447 Status
51678SKTN CPU PASSSKTN14:45CPU19:104:25M,TU,W,TH,F,SA,SUUNRESERVED51678 Status
24369TRIBENI EXPRESSSKTN15:35SBDR19:243:49M,W,F,SU2A,3A,SL,GN,24369 Status
14369TRIBENI EXPRESSSGRL16:00SBDR19:243:24TU,TH,SA2A,3A,SL,GN,14369 Status
23347SGRL PNBE LNK EXSGRL17:00CPU18:551:55M,TU,W,TH,F,SA,SU3A,SL,GN,23347 Status
51679KTE CPU PASSMHDA17:28CPU21:554:27M,TU,W,TH,F,SA,SUUNRESERVED51679 Status
18010SANTRAGACHI EXPSGRL21:05CPU22:251:20SU2A,3A,SL,GN,18010 Status
19413KOLKATA EXPRESSSGRL21:05CPU22:251:20W2A,3A,SL,GN,19413 Status
19608MDJN KOAA EXPSGRL21:05CPU22:251:20M2A,3A,SL,GN,19608 Status
24370TRIVENI EXPSKTNDestinationCPU05:35341141:35TU,TH,SA,SU2A,3A,SL,GN,24370 Status
13345SGRL INTERCITYSGRLDestinationCPU19:10341155:10M,TU,W,TH,F,SA,SUUNRESERVED13345 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
05-09-2022
NCR formed a long haul of 4 empty BOXN rakes from Chunar.

Giving a boost to the freight mobility and aiming to expedite the movement of coal rakes, NCR formed a long haul of 4 empty BOXN rakes from Chunar last evening.

Named as PINAKA, the long haul consisted of a total of 232 wagons (58 wagons per part) and 4 brake vans. It was formed at Chunar by clubbing four empty BOXN rakes with the leading part having WAG9 multiple-unit locomotive while the rest three parts had their own locomotives. 

Usually, the long haul trains are run by clubbing 2 trains. However, in view of expediting the freight movement, especially coal, long hauls of 3 or more trains have been formed o­n a trial basis.

In the month of August, 36 long hauls of 2 trains and 4 Triagni (त्रिअग्नि - a long haul of 3 empty BOXN rakes) were formed by Prayagraj Division at Chunar. These long hauls of empty BOXN rakes are handed over to ECR for loading at various coal loading sites.

The main aim of these long haul trains is increasing the line capacity. 

Since Chunar-Chopan section is a single line section at present and it also serves as the trunk route for coal movement as maximum coal loading is taking place in Northern Coal Fields (NCL), the idea of running long haul trains has been executed to increase the mobility of coal rakes without affecting the punctuality of coaching trains.

Pinaka departed from Chunar at 18:20 hrs o­n Saturday and was handed over to East Central Railway at Chopan. Two BOXN were placed at Shakti Nagar Siding and two others were placed at Krishanshilla siding.

Long hauls of 2 trains have traditionally been made in NCR from locations like Tundla, Khurja, Jhansi and BAAD (near Mathura).

These trials will be continue regularly.





2
2022/0222-02-2022
Mumbai
CANCELLATION OF FEW TRAINS DUE TO NON-INTERLOCKING WORK IN BILASPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY


CANCELLATION OF FEW TRAINS DUE TO NON-INTERLOCKING WORK IN BILASPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY

Due to non-interlocking work for commissioning of 4th line connectivity at Kharsia station in Jharradih – Kharsia – Robertson triple line electrified section of Bilaspur Division of South East Central Railway, few trains will remain cancelled.

According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of the trains are as under:

Cancellation of Trains:

1.      Train No. 22909 Valsad – Puri Superfast Express of 24th February, 2022.

2.      Train No. 22910 Puri – Valsad Superfast Express of 27th February, 2022.

3.      Train No. 20918 Puri – Indore Humsafar Express of 24th February, 2022.

************






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit