For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

MEJA ROAD

STATION INFO

Address: Uttar Pradesh 212305, India

Station Code: MJA)MEJA ROA

Station Name: MJA)MEJA ROAD

Zone: NCR/North Central

Total Unique Trains: 18

Train Frequency Weekly: 95

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
14371TRIBENI EXPRESS00:1500:172M,TU,W,TH,F,SA,SUSL,GN
14369TRIBENI EXPRESS00:1500:172TU,TH,SA2A,3A,SL,GN
24369TRIBENI EXPRESS00:1500:172M,W,F,SU2A,3A,SL,GN
13201RJPB LTT EXP06:4106:432M,TU,W,TH,F,SA,SU2A,3A,SL,GN
63237DDU ALD MEMU07:5407:551M,TU,W,TH,F,SA,SUUNRESERVED
54103CAR ALD PASS08:0608:071M,TU,W,TH,F,SA,SUUNRESERVED
18101TATA JAT EXP08:1008:177M,TU,W,TH,F,SA,SU3A,SL,GN
18309SBP JAT EXPRESS08:1108:132M,TU,W,TH,F,SA,SU3A,SL,GN
64596ALD DDU MEMU08:1608:171M,TU,W,TH,F,SA,SUUNRESERVED
53345CPU ALD PASS10:2110:221M,TU,W,TH,F,SA,SUUNRESERVED
53346ALD CPU PASS15:2915:312M,TU,W,TH,F,SA,SUUNRESERVED
18310JAT SBP EXP16:0416:062M,TU,W,TH,F,SA,SU3A,SL,GN
18102JAT MURI TATA EXPRESS16:0416:051M,TU,W,TH,F,SA,SUUNRESERVED
64595DDU ALD MEMU19:0519:061M,TU,W,TH,F,SA,SUUNRESERVED
54104ALD CAR PASS19:1519:161M,TU,W,TH,F,SA,SUUNRESERVED
63238ALD DDU PASS19:3119:321M,TU,W,TH,F,SA,SUUNRESERVED
24370TRIVENI EXP22:0422:062TU,TH,SA,SU2A,3A,SL,GN
14370TRIVENI EXP22:0422:062M,W,F2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
11-01-2022
NCR makes giant stride towards electrification

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे,प्रयागराज

पत्रांक: 11पीआर/01/2022 प्रेस विज्ञप्तिदिनांक: 10.01.2022

NCR makes giant stride towards electrification

92% of NCR’s broad gauge network is now electrified

With the electrification of Shikohabad-Mainpuri section o­n 31st December, total electrified route km in NCR now stands at 2933

Electrification of 5 major routes completed in calendar year 2021.

Aggressively pursuing towards mission 100% electrification, NCR completed a total of 216 Route Kilometer & 314 Track Kilometer of electrification between April-December'2021.

Major routes which have been electrified during first three quarters of current financial year are:

Birlanagar-Udimor (101 km)

Mahoba-Khajuraho (64 km)

Shikohabad-Mainpuri (51 km)

In addition, newly laid double line between Chaunrah-Malasa (19 km), Nandkhas-Parauna (32 km) (both part of Bhimsen-Jhansi doubling project) and third line between Babina- Jhansi (24 km) are opened along with electrification.

At present, NCR has 2933 electrified Route Km and 6313 electrified track kilometers.

·Electrification works completed in NCR during calendar year 2021 are:

1.Bharatpur- Bandikui (97.5 km)

2.Bhandai- Etawah (114 km)

3.Mahoba-Khajuraho (64 km)

4.Birlanagar-Udimor (101 km)

5.Shikohabad-Manipuri (51km)

 

In addition to above major routes, electrification works of sidings like Chunar, Churk, Meja NTPC, Shankargarh have also been completed.

As a result of massive electrification, need for traction changing from AC engine to diesel engine is now done away at these places thereby reducing detentions and increasing mobility and punctuality.

With a total broad gauge network of 3222 route kilometers in NCR, electrified route km (2933) now stands at 91% of overall broad gauge network of NCR.

Electrification of remaining routes like Khajuraho-Udaipura, Barhan-Etah and Etawah-Mainpuri-Farrukhabad is targeted to be completed this year.

 





2
01-10-2021
Electrification of Chunar siding completed by NCR

उत्‍तरमध्‍य रेलवे

जनसम्‍पर्क कार्यालय

                à¤‰à¤¤à¥â€à¤¤à¤°à¤®à¤§à¥â€à¤¯ रेलवे,प्रयागराज

 

पत्रांक: 11पीआर/09/2021                     à¤ªà¥à¤°à¥‡à¤¸ विज्ञप्ति                                       à¤¦à¤¿à¤¨à¤¾à¤‚क:23.09.2021

Electrification of Chunar siding completed by NCR

In another step towards mission 100% electrification, NCR completed the electrification work of Chunar Siding yesterday.  A total of 7Track kilometres of remaining patch of siding was electrified and commissioned yesterday after successful conduction of Loco Trial.

The electrification will improve the mobility of incoming clinker rakes and outgoing loaded cement rakes. In addition, clearance of empty rakes will also be expedited.

This is to mention that electrification of Meja and Churk Sidings has already been completed this year by NCR and sidings have been  commissioned.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search