For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








26 Trains from (JKM)JANKAMPET JN to (BSX)BASAR


Address: Jn. Pt. NZB,SC/BDHN/MUE. Nehru Nagar, Nizamabad. Telangana

Station Code: JKM

Station Name: Jankampet Junction

Zone: SCR/South Central

Train Frequency Weekly: 109

Station Traffic: Medium

Address: Basara Railway Station, Basar, Andhra Pradesh 504101, India

Station Code: BSX

Station Name: BASAR

Zone: SCR/South Central

Train Frequency Weekly: 149

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
17405KRISHNA EXPRESSNZB00:05DAB00:410:36M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN,17405 Status
17231NS NSL EXPNZB00:50BSX01:390:49F,SU2A,3A,SL,GN,17231 Status
17417TPTY SNSI EXPNZB00:50DAB01:490:59TU2A,3A,SL,GN,17417 Status
16003MAS NSL EXPRESSNZB03:10BSX03:290:19SU2A,3A,SL,GN,16003 Status
57563HYB PBN PASJKM03:35DAB04:190:44M,TU,W,TH,F,SA,SU3A,SL,GN,57563 Status
57557NZB NED PASSJKM06:19SQE07:040:45M,TU,W,TH,F,SA,SUUNRESERVED57557 Status
12765TPTY AMI SUP EXPNZB06:47DAB07:240:37TU,SA2A,3A,SL,GN,12765 Status
57594NED MED PASSFKB07:35NVT07:440:09M,TU,W,TH,F,SA,SUUNRESERVED57594 Status
07608TPTY NED EXPNZB08:30DAB09:120:42W2A,3A,SL,GN,07608 Status
57561KCG MMR PASSJKM09:49SQE10:390:50M,TU,W,TH,F,SA,SUUNRESERVED57561 Status
51421PUNE NZB PASSFKB09:57NVT10:060:09M,TU,W,TH,F,SA,SUSL,GN,51421 Status
17641KCG NRKR EXPNZB10:40DAB11:320:52TU,W,TH,F,SA,SUCC,2S,GN,17641 Status
17639KCG AK EXPNZB10:40DAB11:320:52MCC,2S,GN,17639 Status
20811VSKP NED SF EXPNZB11:57BSX12:280:31TU,W,SA2A,3A,SL,GN,20811 Status
20809NAGAVALI EXPRESSNZB11:57BSX12:280:31M,F,SU2A,3A,SL,GN,20809 Status
51433NZB PVR PASSJKM13:35SQE14:160:41M,TU,W,TH,F,SA,SUSL,GN,51433 Status
17058DEVAGIRI EXPNZB16:00DAB16:390:39M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17058 Status
57562MMR KCG PASSFKB16:30NVT16:390:09M,TU,W,TH,F,SA,SUUNRESERVED57562 Status
17020HYB JP EXPNZB18:15BSX19:030:48SA2A,3A,SL,GN,17020 Status
57593MED NED PASSJKM18:15SQE19:201:05M,TU,W,TH,F,SA,SUUNRESERVED57593 Status
57558NED NZB PASSFKB20:27NVT20:360:09M,TU,W,TH,F,SA,SUUNRESERVED57558 Status
17064AJANTA EXPRESSNZB21:00DAB21:470:47M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17064 Status
51434PVR NZB PASSFKB22:10NVT22:190:09M,TU,W,TH,F,SA,SUUNRESERVED51434 Status
17213NS NSL EXPNZB23:05BSX23:450:40M,TU,W,TH,SA1A,2A,3A,SL,GN,17213 Status
11206KRMR LTT EXPNZB23:05DAB23:550:50SU2A,3A,SL,GN,11206 Status
51422NZB PUNE PASSJKM23:49DAB00:280:39M,TU,W,TH,F,SA,SUSL,GN,51422 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.47/2023-2408-05-2023
Secunderabad
PR No. 47 16 Summer Special Trains between Kacheguda and Bikaner

In order to clear extra rush of passengers during summer season, South Central Railway will run the following special trains between Kacheguda – Bikaner - Kacheguda as detailed below: -

 

Sl. No

Tr. No.

From – To

Dep

Arr

JCO

1

07053

Kacheguda – Bikaner

21.30 (Sat)

13.50 (Mon)

06.05.2023 to 24.06.2023

2

07054

Bikaner – Kacheguda

20.15 (Tue)

09.40 (Thu)

09.05.2023 to 27.06.2023

 

 Train No. 07053/07054 Kacheguda – Bikaner - Kacheguda Special Trains (16 services):-

             Enroute, these trains will stop at Medchal, Wadiaram, Kamareddi, Nizamabad, Basar, Mudkhed, Nanded, Purna, Basmat, Hingoli, Washim, Akola, Shegaon, Malkapur, Bhusaval, Jalgaon, Nandarbar, Surat, Vadodara, Geratpur, Ahmedabad, Mahesana, Palanpur, Abu Rd, Falna, Marwar, Pali Marwar, Luni, Jodhpur, Gotan, Merta Rd, Nagaur and Nokha stations in both the directions. These trains consist of First AC, 2AC, 3AC, Sleeper and General Second Class Coaches.



(Ch.Rakesh)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.49/2023-2408-05-2023
Secunderabad
PR No. 49 SCR completes Record Electrification of 1,017 Route kms in 2022-23 South Central Railway Observes Electrical Safety Week

 

-Electrification done during 2022-23 is the best-ever achievement since inception of the Zone.

-The Zone is observing Electrical safety week during 03 - 09 May 2023.

South Central Railway is observing Electrical Safety Week from 03rdto 09th May, 2023 to promote electrical safety aspects and saving of electrical energy. During the safety week, seminars o­n electrical safety will be held at the divisional level and various other establishments. Special training classes are also being conducted for the electrical supervisors and staff o­n increasing awareness regarding electricity rules. Inspection of Fire audit, functioning of fire detection and fire-fighting equipment will be carried out. Posters and banners are also displayed to bring awareness o­n electrical safety.

       SCR completes Record Electrification

South Central Railway has registered its best-ever performance in electrification of its network during 2022-23. The Zone has completed 1,017 Route Kilometers (RKM) of Railway electrification works in FY 2022-23, which is an all-time record in the history of the Zone. The achievement is also the second highest RKM of Electrification done by any Zone across Indian Railways during 2022-23.

Indian Railways has accorded special focus to electrification of its network. Out of the total electrification of 1017 Rkms, 286.4 Kms fall under Telangana, 133.7 Rkms fall under Andhra Pradesh, 546 Rkms falls under Maharashtra and 50.8 Rkms pertains to Karnataka jurisdiction of SCR. The state-wise details of the Electrification completed o­n the Zone during 2022-23 are as follows:

·286.4 Rkms pertaining to Telangana region of SCR comprises of sections like Bhavanapalem – Sattupalli; Manoharabad – Nizamabad; Mahabubnagar - Alampur Road; Kosai – Ambari; Jankampet - Basar.

 

·133.7 Rkms pertaining to Andhra Pradesh region of SCR comprises of sections like Dharmavaram – Kadiri; Aravalli – Nidadavolu; New Piduguralla – Savalyapuram; Alampur - Kurnool City; Gooty Bypass cabin.

 

·546 Rkms pertaining to Maharashtra region of SCR comprise of sections like Washim – Purna; Kamalnagar – Parli; Ambari – Mudkhed; Rotegaon – Dinegaon; Parli - Parbhani.


·50.8 Rkms pertaining to Karnataka region of SCR between Khanapur - Kamalnagar.

 

Electrification of railway lines o­n such huge magnitude has also led to availability of continuous electrified rail connectivity between Secunderabad / Hyderabad to Bengaluru as well Chennai, operation of first electrified train in sections like Bhadrachalam – Sattupalli in Telangana, Dharmavaram – Pakala in Andhra Pradesh and Aurangabad to Dinagaon in Maharashtra among others

 

The electrification of rail lines helps in providing seamless movement of trains by avoiding change in traction power and reducing enroute detention of both the coaching and freight trains. It helps in improving the average speed of the trains and hence more trains can be introduced in these sections due to the enhancement of sectional capacity. It also provides an environment-friendly means of powering the trains with zero carbon emissions, while saving fuel costs at the same time.

Shri Arun Kumar Jain, General Manager, South Central Railway congratulated staff & officers of the Zone for the excellent teamwork and dedication in executing the electrification works. The General Manager stated that the pace with which the electrification works have been carried out has not o­nly helped in achieving record electrification but has also earned recognition at the National level. He said that the major portion of the SCR network is now electrified and the Zone is progressing swiftly towards achieving 100% electrification of its existing broad gauge lines over its jurisdiction.  


(Ch.Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit